Golden Line (Delhi Metro)

From Wikipedia, the free encyclopedia
Future line of the metro in Delhi, India

Golden Line
Overview
Other nameLine 10, Line 11
StatusUnder construction
OwnerDelhi Metro
LocaleDelhi
Termini
Stations16
Elevated: 4
Underground: 12
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
History
Planned openingMarch 2026; 1 month's time (2026 -03)[1]
Technical
Line length25.82 km (16.04 mi)
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz ACoverhead catenary
Route map

Terminal 1 IGI Airport
Delhi Aerocity
Mahipalpur
Vasant Kunj
Kishangarh
Chhatarpur
Chhatarpur Mandir
IGNOU
Neb Sarai
Saket G-Block
Ambedkar Nagar
Khanpur
Sangam Vihar-Tigri
Maa Anandmayee Marg
Pul Pehladpur
Tughlakabad Station
Sarita Vihar Depot
Sarita Vihar East
Madanpur Khadar
Kalindi Kunj

Lajpat Nagar
Andrews Ganj
Greater Kailash-1
Chirag Delhi
Pushpa Bhawan
Saket District Centre
Pushp Vihar
Saket G Block
This diagram:

TheGolden Line (Line 10 and Line 11) is arapid transit line of theDelhi Metro currently under-construction. It will start fromTerminal 1-IGI Airport, which was previously planned fromDelhi Aerocity, and end inTughlakabad.[2] It will be 25.82 km (16.04 mi) long with 16 stations, out of which four will be elevated and 12 will be underground.

It will connectsouthern Delhi directly withIndira Gandhi International Airport to relieve the increasing traffic, congestion and pollution on roads. Construction began on the line in June 2022, as part of thefourth phase of the Delhi Metro's development, and is expected to be completed by March 2026.[3][4][5][6]

History

[edit]

The Golden Line, initially named as Silver Line, was conceptualized by theDelhi Metro Rail Corporation (DMRC) under thePhase IV ofDelhi Metro's future expansion and development in July 2016. As per the plan, six new lines covering a length of about 104 km (65 mi) have been planned to be added to the metro network, out of which the Golden Line would coversouthern Delhi at a length of 20.2 km (12.6 mi). The plans were finalized for implementation by theGovernment of Delhi in December 2018; this time the length of the Golden Line increased to 23.6 km (14.7 mi).[7] In March 2019, the plans were approved for construction by theGovernment of India. Thus, land acquisition for Phase IV and Golden Line began from April 2019, and was completed by three years. Construction was supposed to begin from 2021, but was delayed due to the restrictions imposed by the government due to theCOVID-19 pandemic. Hence, construction was started byAfcons Infrastructure andLarsen & Toubro in June 2022.[3][4] It was expected to be completed by 2024/25, which has been extended to March 2026, as of January 2024.[1]

In November 2020, the DMRC changed the alignment of the Golden Line as per the instructions of theArchaeological Survey of India (ASI) to circumvent theQutb Minar and theMehrauli Archaeological Park, so to avoid any harm to these critical historical sites during construction and operation.[6] As per the initial plan, the line was proposed to be extended toTerminal 1 ofIndira Gandhi International Airport, in order to provide commuters a faster and direct link to the airport's premises. The proposal was approved by the Government of Delhi after the DMRC created and showed aDetailed Project Report (DPR) in December 2023, thereby increasing the line's length to 25.82 km (16.04 mi).[8][9] The name of the line was changed from 'Silver Line' to 'Golden Line' in January 2024.[5][10]

Stations

[edit]
Main article:List of Delhi Metro stations

The stations being built on the Golden Line are:[6][11]

Main Line

[edit]
Golden Line
#Station NameOpeningInterchange ConnectionStation LayoutPlatform Level Type
EnglishHindi
1Terminal 1-IGI Airport[12]टर्मिनल 1 - आईजीआई एयरपोर्टApprovedAirport interchangeIGI Airport (T-1)
Magenta Line
UndergroundIsland
2Delhi Aerocityदिल्ली एरोसिटी2026Airport ExpressUndergroundIsland
3Mahipalpurमहिपालपुर2026NoneUndergroundSide
4Vasant Kunjवसंत कुंज2026NoneUndergroundSide
5Kishangarhकिशनगढ़2026NoneUndergroundSide
6Chhatarpurछत्तरपुर2026Yellow LineUndergroundIsland
7Chhatarpur Mandirछत्तरपुर मंदिर2026NoneUndergroundSide
8IGNOUइग्नू2026NoneUndergroundIsland
9Neb Saraiनेब सराय2026NoneUndergroundIsland
10Saket G Block[6]साकेत जी ब्लॉक2026Golden Line
(Phase 4 - Proposed Branch)
ElevatedSide
11Ambedkar Nagarअम्बेडकर नगर2026NoneElevatedSide
12Khanpurख़ानपुर2026NoneElevatedSide
13Sangam Viharसंगम विहार2026NoneElevatedSide
14Maa Anandmayee Margमां आनंदमयी मार्ग2026NoneUndergroundSide
15Tughlakabad Railway Colonyतुग़लक़ाबाद रेलवे कॉलोनी2026NoneUndergroundIsland
16Tughlakabad Stationतुग़लक़ाबाद स्टेशन2026Violet Line

upTughlakabad

UndergroundIsland
17Sarita Vihar Depot[12]सरिता विहार डिपोApprovedNoneElevatedSide
18Madanpur Khadar[12]मदनपुर खादरApprovedNoneElevatedSide
19Kalindi Kunj[12]कालिंदी कुंजApprovedMagenta LineElevatedSide

Branch Line (formerly theBrown Line)

[edit]
Golden Line Branch
#Station NameOpeningInterchange ConnectionStation LayoutPlatform Level Type
EnglishHindi
1Saket G Block[6]साकेत जी ब्लॉकApprovedGolden Line
(Phase 4 - Under Construction)
ElevatedSide
2Pushp Viharपुष्प विहारApprovedNoneElevatedSide
3Saket District Centreसाकेत जिला केंद्रApprovedNoneElevatedSide
4Pushpa Bhawan[6]पुष्पा भवनApprovedNoneElevatedSide
5Chirag Delhiचिराग दिल्लीApprovedMagenta LineElevatedSide
6Greater Kailash-1ग्रेटर कैलाश-1ApprovedNoneElevatedSide
7Andrews Ganjएंड्रयूज़ गंजApprovedNoneElevatedSide
8Lajpat Nagarलाजपत नगरApprovedPink Line
Violet Line
ElevatedSide

Project timeline

[edit]
  • Main route Aerocity-Tughlakabad:
    • 2025 Jun: Aerocity-Tughlakabad will be completed mid 2026.[13]
  • Aerocity-T1 extension:
    • 2025 Aug: For the Aerocity toIGI T1 extension the DPR has been completed and approved, and construction will be completed by 2027.[14]

Train Info

[edit]
Golden Line
RakesAlstom Metropolis
Train Length6 coaches
Train Gauge4 ft 8+12 in (1,435 mm)standard gauge
Electrification25 kV 50 HzAC throughoverhead catenary (OHE)
Train's Maximum Speed100 km/h
Train OperationDelhi Metro

See also

[edit]
Portals:

References

[edit]
  1. ^ab"Silver to Gold — Why Delhi Metro changed the colour code of this much awaited line".The Indian Express. 29 January 2024. Retrieved29 January 2024.
  2. ^"Delhi's Airport Metro set for silver line extension to terminal 1".Construction World. 12 January 2024. Retrieved14 January 2024.
  3. ^ab"Delhi: Covid, green concerns put Phase-IV in low gear; push targets back".The Times of India. 14 June 2022. Retrieved16 June 2022.
  4. ^ab"Afcons Begins Work on Delhi Metro Silver Line's Underground Section".The Metro Rail Guy. 15 June 2022. Retrieved29 January 2024.
  5. ^ab"DMRC changes colour code of upcoming Delhi Aerocity–Tughlakabad Metro corridor".The Statesman. 29 January 2024. Retrieved29 January 2024.
  6. ^abcdef"Delhi Metro steers clear of Qutub Minar".The Times of India. 2 December 2020.ISSN 0971-8257. Retrieved20 December 2023.Cite error: The named reference ":1" was defined multiple times with different content (see thehelp page).
  7. ^"Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024".News18. 20 December 2018. Retrieved29 January 2024.
  8. ^"Delhi Metro's Silver Line to Aerocity may be extended to terminal 1".The Times of India. 19 December 2023.ISSN 0971-8257. Retrieved19 December 2023.
  9. ^"Good News For Air Travellers! Delhi Metro's Silver Line To Aerocity To Be Extended To Terminal 1".Times Now. 19 December 2023. Retrieved19 December 2023.
  10. ^"Delhi Metro Phase 4 – Information, Route Maps, Tenders & Updates".The Metro Rail Guy. Retrieved29 January 2024.
  11. ^"Delhi Metro map".www.delhimetrorail.com. Retrieved21 April 2022.
  12. ^abcd"Union Cabinet approves Delhi Metro expansion, 13 new stations to come up".Times of India. 25 December 2025. Retrieved25 December 2025.
  13. ^"Delhi Metro's Golden Line corridor reaches key tunneling milestone".Hindustan Times. 8 June 2025. Retrieved15 December 2025.
  14. ^"Delhi: Metro link for IGI airport's T1, T3 moves ahead".Hindustan Times. 22 August 2025. Retrieved15 December 2025.
Lines
Red Line 1
Yellow Line 2
Blue Line 3/4
Main Line 3
Branch Line 4
Green Line 5
Main Line
Branch Line
Violet Line 6
Airport Express
Pink Line 7
Magenta line 8
Grey line 9
Golden Line
Depot(s)
  • Vasanth Kunj & Sarita Vihar (TBA)
Stations along operational lines that are denoted initalics have yet to open.
Suburban
rail
Operational
Under
construction
Planned
Proposed
Rapid
transit
Operational
Under
construction
Proposed
Monorail
Operational
Proposed
Cancelled
Metrolite
Planned
Proposed
Cancelled
Tram
Operational
Defunct
 Armenia
 Azerbaijan
 Bangladesh
 China (PRC)
 Georgia
 India
 Indonesia
 Iran
 Israel
 Japan
 Kazakhstan
 Mongolia
 North Korea
 Malaysia
 Pakistan
 Philippines
 Qatar
 Russia
 Saudi Arabia
 Singapore
 South Korea
 Taiwan (ROC)
 Thailand
 Turkey
 United Arab Emirates
 Uzbekistan
 Vietnam
* Under construction.
Railways in Northern India
National network/
trunk lines
Branch lines/
sections
Urban and suburban
rail transport
Heritage railways
Monorails
Defunct lines
Manufacturing units
and workshops
Railway companies
See also
Retrieved from "https://en.wikipedia.org/w/index.php?title=Golden_Line_(Delhi_Metro)&oldid=1338676377"
Category:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp