Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

George Washington Bridge Bus Station

Coordinates:40°50′56″N73°56′18″W / 40.84889°N 73.93833°W /40.84889; -73.93833
From Wikipedia, the free encyclopedia
(Redirected fromGeorge Washington Bridge Bus Terminal)
Commuter bus terminal in New York City

40°50′56″N73°56′18″W / 40.84889°N 73.93833°W /40.84889; -73.93833

George Washington Bridge Bus Station
View of the station from the southeast, 2018
General information
Locationbetween Ft. Washington & Wadsworth Aves, and W. 178th & W. 179th Sts.
Manhattan,New York City
United States
Owned byPort Authority of New York and New Jersey
Operated byPort Authority of New York and New Jersey
Platforms21 gates (upper level)
Bus routesNJ Transit Bus:171,175,178,181,182,186,188
Bus operatorsSeeBus Service below
ConnectionsNew York City Subway:
"A" train at175th Street
"1" train at181st Street
Construction
AccessibleYes
ArchitectPier Luigi Nervi
Other information
WebsiteGWBBS
History
OpenedJanuary 17, 1963
Rebuilt2013–2017 renovations
Passengers
20156.9 million

TheGeorge Washington Bridge Bus Station is acommuterbus terminal at the east end of theGeorge Washington Bridge in theWashington Heights neighborhood ofManhattan inNew York City. The bus station is owned and operated by thePort Authority of New York and New Jersey (PANYNJ). On a typical weekday, approximately 20,000 passengers on about 1,000 buses use the station.[1]

The building is an example of mid-centuryurban renewal and structural expressionism. Designed by the Italian architect-engineerPier Luigi Nervi, the new bus station was hailed as a robust tour-de-force of infrastructure ingenuity by leading critics of the day.[2] While later noting the station's neglect from decades of deferred maintenance, the architecture critic Ada Louise Huxtable heralded the design of the station as "a work of the first rank that demonstrates the art and science of reinforced concrete construction at its 20th-century highpoint, in the hands of one of its greatest masters."[3]

The terminal was first proposed in 1955, following earlier attempts to construct a bus station at the George Washington Bridge's eastern end. The Port Authority hired Nervi to design the terminal in early 1960, and it opened on January 17, 1963. In its early years, the George Washington Bridge Bus Station was underused compared to thePort Authority Bus Terminal. A major renovation, including an expansion of retail space from 30,000 to 120,000 square feet (3,000 to 11,000 m2), was announced in 2008; the project began in late 2013 and was expected to cost more thanUS$183 million. The renovated station reopened on May 16, 2017, two years behind schedule, $17 million over budget, and still unfinished.[4][5]

Description

[edit]
Aerial view of station and the Trans-Manhattan Expressway

The station is built over theTrans-Manhattan Expressway (Interstate 95) between 178th and 179th Streets andFort Washington and Wadsworth Avenues, and features direct bus ramps on and off the upper level of the bridge. The building was designed by the Italian engineerPier Luigi Nervi and is one of only a few buildings he designed outside ofItaly.[6] The structure measures 400 by 185 feet (122 by 56 m) long.[7] Early plans for the terminal indicate that it contained 10 platforms for suburban buses on its top level, which collectively had 36 loading positions. At ground level were shops and seven sawtooth loading positions for long-distance buses. The basement level contained a mezzanine leading to the175th Street station of theNew York City Subway.[8]

The building is constructed of hugesteel-reinforced concretetrusses, fourteen of which arecantilevered from supports in the median of the Trans-Manhattan Expressway, which it straddles.[7][9] The roof was constructed of 26 triangular sections,[7] each measuring 66 by 92 feet (20 by 28 m) and composed of 36 concrete panels.[10] The design of the roof was intended to disperse exhaust from buses idling there.[7] The building's roof trusses have been described as resembling butterflies, as seen in aerial views.[3][7] When the terminal was constructed in 1963, the Port Authority believed the design of the roof would eliminate the need to install air conditioning.[11]

The building contains murals as well as busts ofGeorge Washington andOthmar Amman, thecivil engineer who designed the bridge. The building received the 1963 Concrete Industry Board's Award.[9] The entire facility is wheelchair-accessible.[12] The terminal was criticized by one writer as "a brutal assault on the senses".[13]

History

[edit]

Development

[edit]

TheGeorge Washington Bridge between New York and New Jersey was opened in 1931; only its current upper deck existed at the time.[14] As early as 1952, the PANYNJ (at the time the Port of New York Authority) had proposed widening a one-block stretch of 178th Street between Fort Washington Avenue and Broadway and creating a bus terminal there. The terminal would have contained three platforms for interstate buses and a connection to the 175th Street subway station. This would have required the demolition of three apartment houses and the building of the Young Men's and Women's Hebrew Association of Washington Heights.[15]

A lower deck for the George Washington Bridge, a newTrans-Manhattan Expressway connecting the bridge to theCross Bronx Expressway, a new bus terminal above the new expressway, and other highway connections near the bridge were recommended in a 1955 study that suggested improvements to the New York City area's highway system.[14][16] The Port Authority announced plans for the $12 million bus station in February 1957.[17][18] The planned terminal would be able to accommodate 255 buses per hour, allowing 70 percent more interstate buses to use the bridge.[17] The Port Authority would have to relocate 10,000 families to make way for the bus terminal and connecting ramps,[18][19] prompting opposition from the area's U.S. representative,Herbert Zelenko.[19] The New York City Planning Commission approved the improvements in June 1957,[20] and the Port Authority allocated funds to the improvement that July.[21][22] In approving the bus terminal, the City Planning Commission mandated that the terminal be an enclosed structure.[20]

The Port Authority announced in March 1960 that it had hired Nervi to design a three-story, $13 million bus terminal above the Trans-Manhattan Expressway.[8][10] The agency had decided to hire Nervi after seeing several of his other designs, including theStadio Flaminio in Rome, which Nervi had designed for the1960 Summer Olympics.[11] The terminal's foundations were already complete at the time, while the ramps to the terminal were being built.[8] The Port Authority awarded a $9.6 million contract that December to the W. J. Barney Corporation and William L. Crow Company for the construction of the terminal's roof.[23][24] In February 1961, contractors erected the largest of 40 steel girders carrying the terminal above the Trans-Manhattan Expressway.[25][26] The steel frame of the terminal had been completed by that April, and workers had begun pouring concrete around the steel.[27]

Opening and early modifications

[edit]

The George Washington Bridge Bus Station opened on January 17, 1963,[28] and was officially dedicated by New York governorNelson Rockefeller and New Jersey governorRichard J. Hughes the next day.[29][30] After passengers complained that the terminal's open-air design let in cold air, the Port Authority approved the installation of a retractable plastic membrane in August 1963 at a cost of $200,000.[31] The PANYNJ also installed glass walls and louvers to protect passengers from strong winds from the west, and it installed heated glass-and-aluminum canopies above the ten departure platforms.[32] Although the bus terminal was intended to replace a series of sidewalk bus loading areas that existed between 166th and 167th streets further south,[28] the last bus route did not relocate to the new terminal until 1967.[33]

In its early years, the George Washington Bridge Bus Station was underused, as most passengers from New Jersey preferred to travel to thePort Authority Bus Terminal inMidtown Manhattan.[34] Upon the George Washington Bridge terminal's first anniversary, 750 buses served the terminal on an average day, carrying 20,500 passengers.[32] By 1974,The New York Times had written that the George Washington Bridge Bus Station "has never been a success and is still under-utilized".[35]

The PANYNJ hired developer McCann Real Equities in July 1999 to study the feasibility of erecting amultiplex cinema above the bus station. Had the multiplex been built, it would have contained 12 screens with a total of 2,800 seats and would have been operated by McCann under a 40-year lease.[36] The multiplex would have cost $20 million.[37] Ultimately, the multiplex was never built; there had been other unsuccessful plans to use theair rights above the terminal.[3] By the 2000s, the terminal retained much of its original design but had fallen into disrepair.[3]

The renovated waiting room (June 2018)
Renovated bus boarding area with display screens (November 2017)

Renovation

[edit]

The PANYNJ approved a $152 million renovation of the George Washington Bridge Bus Station in October 2008.[38][39] The Port Authority was to contribute $49.5 million to the project, while developer Acadia would pay $102 million.[40] Although the terminal had accommodated 300,000 buses during the preceding year, carrying five million passengers, it had become dated and had never become as busy as the Port Authority Bus Terminal. The George Washington Bridge Bus Station lacked air-conditioning; it still containedpayphones, at a time when many payphones across the city had been removed; and most of its retail activity consisted ofoff-track betting and sales of lottery tickets and cheap coffee.[41] Later that month, the PANYNJ revealed designs for the terminal's renovation.[42][40] The project was postponed due to the2008 financial crisis.[38][43]

The agency announced in July 2011 that the project would proceed after the PANYNJ signed an agreement with a consortium of developers who would lease the terminal's retail space for 99 years.[44][43] At that point, the cost had increased to $183 million. The developers were to provide $100 million for the project, while the PANYNJ would pay $83.2 million.[44] Development firmNew York City Regional Center (NYCRC) initially lent $72 million to the private developers, and NYCRC later lent another $19 million for the project.[38] At the time of the announcement, the project was to begin in January 2012 and be completed by early 2013.[44]

The renovated building was to be improved with better access to local subway stops, displays of bus departure and arrival times, central air conditioning, and fullADA-compliant accessibility. It would increase retail space from 30,000 to 120,000 square feet (3,000 to 11,000 m2).[45][46] Large tenants likeMarshalls,Key Food, andBlink Fitness leased some of the terminal's retail space before the renovation began.[47]Tutor Perini received a $100 million construction contract in August 2013.[48][49] The Port Authority and a private company, known as GWBBS Development Venture LLC, began renovating the station later the same year.[50] The bus station's main concourse was temporarily closed for renovations in August 2014.[51][52] Although buses continued to stop at the terminal, the renovation was delayed significantly; the scheduled completion date of 2015 was postponed at least twice. According toThe New York Times, the delays became "a sore point in Washington Heights".[53]

The terminal reopened on May 16, 2017, two years behind schedule, $17 million over budget, and still unfinished.[54][5] Tutor Perini filed a $120 million lawsuit against the PANYNJ in July 2019 over the project's "delays and cost overruns".[55][56] GWBBS Development Venture LLC filed forChapter 11 bankruptcy protection that October, in part because of the delays, cost overruns, and arbitration proceedings with Tutor Perini.[57][58] Monarch Alternative Capital LP offered to take over the leasehold of the station's retail space, but negotiations with the PANYNJ stalled.[59] NYCRC sued the PANYNJ in 2021, claiming that the agency was trying to wipe out the firm's investment in the terminal by interfering with the planned sale of the retail leasehold.[60] Aurora Capital Associates and Bridges Development Group acquired the retail leasehold in December 2022 for $46 million.[61][62]

Subway connection

[edit]
The station seen from the western approach in 2006

The complex is served by the175th Street station of theNew York City Subway. The station is on Fort Washington Avenue with entrances at 175th Street and 177th Street, the latter one block south of the bus station.[63] The subway station, operated by theNew York City Transit Authority and served by theA train,[64] was part of theIndependent Subway System (IND)'s first line, theIND Eighth Avenue Line, which opened in 1932.[65] A pedestrian tunnel, maintained by the Port Authority of New York and New Jersey, links the bus terminal to the subway station. This tunnel is closed at night.[66]

The bus station is also within walking distance of the181st Street station of the same line, and the181st StreetIRT Broadway–Seventh Avenue Line station on the1 train.[64]

Bus service

[edit]

On September 20, 2017, Greyhound announced that it would be providing service to the station starting September 27, while keeping the Port Authority Bus Terminal as its primary New York City location.[67]

As of 2020[update], the bus lines detailed below serve the terminal for theNew York City Transit Authority,New Jersey Transit, andCoach USA (Rockland Coaches andShort Line).[68] Service is also provided bySpanish Transportation with its Express Servicejitneys.[69] Additionally, someOurBus routes serve the George Washington Bridge Bus Station.[70][71]

MTA Regional Bus Operations

[edit]

Ten localMTA Regional Bus Operations routes stop at a lower level and on the streets outside the station. TheM4 stops on Fort Washington Avenue, while theM5,M100 andBx7 stop on Broadway. TheM98,Bx3,Bx11,Bx13,Bx35 andBx36 stop on 178th and 179th Streets between Fort Washington Avenue and Broadway. All routes are ADA-accessible.[72][73]

RouteTerminalvianotes
M4The Cloisters orFort Tryon Park (north)
Fifth Avenue/32nd Street,Koreatown (south)
Broadway andFifth AvenueBus only runs to the Cloisters when the museum is open; it only runs to Fort Tryon Park at all other times.
M5Broadway/31st Street,Garment DistrictRiverside Drive, Fifth Avenue, and Broadway
M98 LTDFort Tryon Park (north)
68th Street/Lexington Avenue (south)
Harlem River Drive andLexington AvenueBus only runs during rush hours.
M100West 220th Street/Broadway, Inwood (north)
West 125th Street/St. Nicholas Avenue,Harlem (south)
Broadway andAmsterdam Avenues
Bx3238th Street station,Riverdale, BronxUniversity Avenue
Bx7West 263rd Street/Riverdale Avenue,Riverdale, Bronx (north)
168th Street station (south)
Broadway, Johnson Avenue,Henry Hudson Parkway
Bx11Parkchester station,Parkchester, Bronx170th Street, Claremont Parkway, East 174th Street
Bx13Bronx Terminal Market (extended to Third Avenue/163rd Street, rush hours)West 181st Street, Ogden Avenue, East 161st Street
Bx35Jennings Street and West Farms Road,Longwood, BronxEdward L. Grant Highway, East 167th Street, East 168th Street, East 169th Street
Bx36Olmstead Avenue and Randall Avenue,Soundview, BronxTremont Avenue, White Plains Road

New Jersey Transit

[edit]
See also:List of NJ Transit bus routes (100–199)
RouteTerminalvianotes
171
Paterson Broadway Bus TerminalGWB Plaza
Route 4
Spanish Transportation operates jitneys along a similar route toPaterson
175
Ridgewood Bus TerminalGWB Plaza
New Jersey Route 4
Hackensack,Paramus,Rochelle Park
Some trips do not stop at
Bergen Community College
178
Hackensack Bus TerminalGWB Plaza,New Jersey Route 4
Grand Avenue,Teaneck Armory, Englewood Avenue
Englewood/Teaneck (northern route) variant of Route 182
181
Bergenline Ave. StationGWB Plaza,Palisade Avenue,Bergenline AvenueLimited peak and evening service Monday–Saturday. Other times, use the Spanish Transportation route, which runs down Bergenline Avenue and continues toJersey City.
182
Hackensack Bus TerminalGWB Plaza, Fort Lee Road, DeGraw AvenueLeonia/Teaneck/Bogota (southern route) variant of 178
186
DumontGWB Plaza,Sylvan Avenue,Palisade Avenue, Teaneck Road
188
West New YorkGWB Plaza, viaRiver RoadEdgewater
60 Street atKennedy Boulevard
Limited weekend service

Coach USA

[edit]

Rockland Coaches

[edit]
RouteTerminalsvia
9A & 9ATNew City (9A and 9W)
(full-time)
Central Nyack (9W) orStony Point (9)
(peak service only)
Sylvan Avenue, Oak Tree Road, Piermont Avenue/River Road, Broadway, Nyack Turnpike (Central Nyack trips only) Lake Road, Main Street,Route 9W (Stony Point is served on select rush-hour trips)

Short Line Bus

[edit]
RouteServiceTerminalsServingNotes
208
PM peakMontgomery, NY
Route 211 and Clinton Street
Washingtonville,Monroe,Central Valley,Ridgewood, NJ
AM peakEast Side, Manhattan
23rd Street and 2nd Avenue
Manhattan neighborhoods:
Washington Heights, Harlem, East Harlem, Yorkville, Upper East Side, Turtle Bay, Murray Hill, Kips Bay.
  • Route owned by the New York State DOT.
  • Does not serve GWB Bus Station and GWB Bridge Plaza.

See also

[edit]

References

[edit]
  1. ^Vanterpool, Veronica (July 6, 2011)."New Life For GW Bridge Bus Station Overhaul".Tri-State Transportation Campaign. RetrievedJuly 15, 2011.
  2. ^Banham, Reyner (1976).Megastructures. Thames and Hudson, Ltd. pp. 30–33.
  3. ^abcdHuxtable, Ada Louise (June 15, 2004)."A Landmark Destination: The Bus Station".The Wall Street Journal. RetrievedAugust 25, 2016.
  4. ^"Port Authority Prepares for Major Overhaul of George Washington Bridge Bus Station" (Press release).Port Authority of New York and New Jersey. June 30, 2011. Archived fromthe original on August 6, 2011. RetrievedJuly 15, 2011.
  5. ^abPichardo, Carolina (May 16, 2017)."GWB Bus Station Finally Opens, 2 Years Behind Schedule".DNAinfo.Archived from the original on June 11, 2017.
  6. ^Bernstein, Fred A. (November 2, 2004)."Second Look: George Washington Bridge Bus Station / Pier Luigi Nervi, 1963".ArchNewsNow. RetrievedJune 11, 2014.
  7. ^abcdeBarrett, Tom (April 1, 1962). "A New Bus Terminal Design: Sloped Roof Combats Fumes".New York Herald Tribune. p. 22.ISSN 1941-0646.ProQuest 1327262787.
  8. ^abcStengren, Bernard (March 18, 1960)."Bus Depot to Get a Roof of 'Wings'; Plans for New Terminal at George Washington Span Calf for Soaring Top".The New York Times.ISSN 0362-4331. RetrievedApril 19, 2023.
  9. ^abRenner, James (September 1998)."George Washington Bridge Bus Station".Washington Heights & Inwood Online. Archived fromthe original on April 4, 2010. RetrievedMarch 27, 2010.
  10. ^abLiltell, Walter D. (March 18, 1960). "Famed Italian Designer Plans Bus Station Here: Nervi's 3- Level Building to Span George Washington Bridge Road".New York Herald Tribune. p. 2.ISSN 1941-0646.ProQuest 1337893638.
  11. ^abBarrett, Tom (May 23, 1962). "A Designer Comes From Afar, Finds Bump at Bus Terminal".New York Herald Tribune. p. 23.ISSN 1941-0646.ProQuest 1325941966.
  12. ^"George Washington Bridge Bus Station".www.panynj.gov. RetrievedJanuary 28, 2021.
  13. ^Rivlin-Nadler, Max (August 25, 2014)."Port Authority Closes Dilapidated GWB Bus Terminal For Long-Overdue Renovation". Gothamist.Archived from the original on April 25, 2017. RetrievedAugust 25, 2016.
  14. ^ab"Excerpts From Proposal to Meet City's Bridge and Highway Needs for Next 2 Decades".The New York Times. January 17, 1955.ISSN 0362-4331. RetrievedJune 15, 2018.
  15. ^"Authority Plans Wider 178th St. At Bridge Block: George Washington Span Project to Add 3 Bus Platforms, Subway Link New Bus Station Planned at George Washington Bridge".New York Herald Tribune. April 8, 1952. p. 17.ISSN 1941-0646.ProQuest 1319994639.
  16. ^"Little Falls Resident Works On George Washington Bridge Project"(PDF).Little Falls Herald. July 26, 1960. p. 12. RetrievedJune 15, 2018 – viaFultonhistory.com.
  17. ^abFernbach, Lyn (February 18, 1957). "Bus Terminal Planned In Washington Heights: $12,000,000 Job to Start This Year 70% Increase In Bases Seen".New York Herald Tribune. p. A1.ISSN 1941-0646.ProQuest 1327319235.
  18. ^ab"City to Get New $12-Million Bus Terminal".Newsday. February 18, 1957. p. 5.ISSN 2574-5298.ProQuest 879950422.
  19. ^ab"Port Body Opposed on Uptown Project".The New York Times. February 22, 1957.ISSN 0362-4331. RetrievedApril 19, 2023.
  20. ^ab"Bridge Program Advanced By City".The New York Times. June 5, 1957.ISSN 0362-4331. RetrievedJune 15, 2018.
  21. ^Ingraham, Joseph C. (July 12, 1957)."Fund Is Allotted Bridge To Jersey".The New York Times.ISSN 0362-4331. RetrievedJune 15, 2018.
  22. ^Stengren, Bernard (February 22, 1960)."George Washington Bridge Loops to Open in Fall".The New York Times.ISSN 0362-4331. RetrievedJune 15, 2018.
  23. ^"Bus Depot Pact is Let; 9.6 Million Low Bid on George Washington Bridge Terminal".The New York Times. December 9, 1960.ISSN 0362-4331. RetrievedApril 19, 2023.
  24. ^Hamshar, Walter (December 9, 1960). "Contract Let for Top Part of Bus Station".New York Herald Tribune. p. 11.ISSN 1941-0646.ProQuest 1325120185.
  25. ^Silberfarb, Edward J. (February 18, 1961). "Steel Is Raised for Bus Depot at Bridge".New York Herald Tribune. p. 1.ISSN 1941-0646.ProQuest 1335895614.
  26. ^"44-Ton Girder is Set at New Bus Station".The New York Times. February 18, 1961.ISSN 0362-4331. RetrievedApril 19, 2023.
  27. ^Stengren, Bernard (April 8, 1961)."Bus Projects Due for Fall of '62; Midtown Addition Will Cost 20 Million and One Uptown 13 Million".The New York Times.ISSN 0362-4331. RetrievedApril 19, 2023.
  28. ^ab"George Washington Bridge Bus Station History". Port Authority of New York and New Jersey. RetrievedJune 11, 2014.
  29. ^Sperling, Godfrey Jr. (January 19, 1963). "Rockefeller Sees New Milieu: Commuting Time Cut Imagination Lauded Products of Cooperation Cost Factor Touched On".The Christian Science Monitor. p. 14.ProQuest 510424908.
  30. ^Grant, Joseph (January 18, 1963)."Bus Terminal Is Dedicated in New York".The Record. p. 25. RetrievedApril 19, 2023 – via Newspapers.com.
  31. ^"Bridge Bus Station To Be Coldproofed At $200,000 Cost".The New York Times. August 9, 1963.ISSN 0362-4331. RetrievedApril 19, 2023.
  32. ^ab"Bridge Bus Depot Marks First Year; Port Authority Pleased but It Wants More Traffic".The New York Times. January 17, 1964.ISSN 0362-4331. RetrievedApril 19, 2023.
  33. ^"Last Bus Terminal On Open Lot Closes Uptown Tomorrow".The New York Times. April 9, 1967.ISSN 0362-4331. RetrievedApril 19, 2023.
  34. ^Prial, Frank J. (February 4, 1973)."Under-Utilized Uptown Bus Station Eases Load on Downtown Terminal".The New York Times.ISSN 0362-4331. RetrievedApril 19, 2023.
  35. ^Prial, Frank J. (November 10, 1974)."Port Authority Has Fallen on Hard Times".The New York Times.ISSN 0362-4331. RetrievedApril 19, 2023.
  36. ^Lueck, Thomas J. (July 30, 1999)."Multiplex Is Planned Above Bus Terminal".The New York Times.ISSN 0362-4331. RetrievedApril 19, 2023.
  37. ^Moritz, Owen (August 2, 1999)."Uptown plan eyes new hotel".New York Daily News. p. 484. RetrievedApril 19, 2023 – via Newspapers.com.
  38. ^abc"Foreclosure on $72m Loan Threatens GWB Bus Terminal Developers".The City. July 26, 2019. RetrievedApril 19, 2023.
  39. ^Neuman, William (October 2, 2008)."Renovation Deal for Bus Station at Bridge".The New York Times.ISSN 0362-4331. RetrievedApril 19, 2023.
  40. ^abSignore, John Del (October 16, 2008)."George Washington Bridge Bus Station Plans Revealed".Gothamist. RetrievedApril 19, 2023.
  41. ^Fernandez, Manny (October 5, 2008)."Change and Outrage at the Bus Station That Time Forgot".The New York Times.ISSN 0362-4331. RetrievedApril 19, 2023.
  42. ^"Designs for George Washington Bridge bus station revealed".The Real Deal. October 16, 2008. RetrievedApril 19, 2023.
  43. ^ab"George Washington Bridge bus station to get $183M renovation".The Real Deal. July 27, 2011. RetrievedApril 19, 2023.
  44. ^abcHughes, C. J. (July 27, 2011)."Neglected Manhattan Transit Hub Is to Undergo a Major Makeover".The New York Times.ISSN 0362-4331. RetrievedApril 19, 2023.
  45. ^Pires, Claire (October 28, 2013)."George Washington Bridge Bus Station Is Finally Being Renovated".Northattan. Archived fromthe original on December 31, 2013.
  46. ^"Port Authority's George Washington Bridge Bus Station Celebrates 50 Years of Regional Commuter Bus Service" (Press release).Port Authority of New York and New Jersey. January 13, 2013. Archived fromthe original on December 28, 2013. RetrievedJune 3, 2013.
  47. ^Feldman, Amy (November 7, 2011)."Retail Rumblings Near the George Washington Bridge".The Wall Street Journal.ISSN 0099-9660. RetrievedApril 19, 2023.
  48. ^"Winner revealed for $100 million GW Bridge bus station redo".New York Business Journal. August 8, 2013. RetrievedMay 18, 2017.
  49. ^"Tutor Perini Building Corp. Awarded $100 Million Contract for George Washington Bridge Bus Station Redevelopment".tutorperinibuilding.com (Press release). August 8, 2013. RetrievedAugust 11, 2022.
  50. ^Strunsky, Steve (January 17, 2013)."GW Bridge Bus Station gets $183 million facelift for 50th birthday".The Star-Ledger. RetrievedJune 11, 2014.
  51. ^Chen, David W. (August 25, 2014)."George Washington Bridge Bus Station Closes for Long-Delayed Upgrade".The New York Times.ISSN 0362-4331. RetrievedApril 19, 2023.
  52. ^"George Washington Bridge Bus Station Building Closing For Renovations".cbsnews.com. August 24, 2014. RetrievedAugust 11, 2022.
  53. ^Fortin, Jacey (March 13, 2017)."Manhattan's Other Bus Terminal, Running Years Late".The New York Times.ISSN 0362-4331. RetrievedApril 19, 2023.
  54. ^"George Washington Bridge Bus Terminal opens at long last in Washington Heights".ABC7 New York. May 16, 2017. RetrievedApril 19, 2023.
  55. ^Rodriguez, Joe Fitzgerald (July 20, 2019)."Central Subway contractor dispute threatens to bust budget".San Francisco Examiner. RetrievedJuly 22, 2019.
  56. ^Berger, Paul (July 14, 2019)."Port Authority Fights Lawsuit Over Renovation Delays".The Wall Street Journal.ISSN 0099-9660. RetrievedApril 19, 2023.
  57. ^Wilson, Colleen (October 8, 2019)."George Washington Bridge Bus Station developer files for bankruptcy".Bergen Record. RetrievedApril 19, 2023.
  58. ^Rubinstein, Dana (October 7, 2019)."George Washington Bridge bus station developer files for bankruptcy".POLITICO. RetrievedApril 19, 2023.
  59. ^Randles, Jonathan (June 29, 2021)."GW Bridge Bus Station Developers Replace Lead Bidder for Retail Lease".The Wall Street Journal.ISSN 0099-9660. RetrievedApril 19, 2023.
  60. ^Randles, Jonathan (October 5, 2021)."GW Bridge Bus Station Lender Sues Port Authority Over Bankruptcy Sale".The Wall Street Journal.ISSN 0099-9660. RetrievedApril 19, 2023.
  61. ^Nazar, Julian (December 28, 2022)."Two New York City-based developers acquire retail site in Upper Manhattan for $46M".New York Business Journal. RetrievedApril 19, 2023.
  62. ^Modi, Priyanka (December 30, 2022)."Aurora Capital, Bridges Acquire GW Bus Station Retail Leasehold".The Real Deal. RetrievedApril 19, 2023.
  63. ^"MTA Neighborhood Maps: Washington Heights"(PDF).Metropolitan Transportation Authority. 2015. RetrievedJuly 29, 2016.
  64. ^ab"Subway Map"(PDF).Metropolitan Transportation Authority. April 2025. RetrievedApril 2, 2025.
  65. ^"List of the 28 Stations on the New 8th Av. Line".The New York Times. September 10, 1932. p. 6.ISSN 0362-4331. RetrievedApril 21, 2020.
  66. ^"Connections – George Washington Bridge Bus Station – The Port Authority of NY & NJ".www.panynj.gov. RetrievedJuly 30, 2016.
  67. ^"Greyhound Begins Operations From Newly Renovated George Washington Bridge Bus Station" (Press release). September 20, 2017. RetrievedNovember 29, 2017.
  68. ^"Bus Carriers and Routes". Port Authority of New York and New Jersey. RetrievedJune 1, 2015.
  69. ^"Express Service – Bus Terminals (Where Do You Want to Go)".Spanish Transportation. Archived fromthe original on October 6, 2012. RetrievedMay 14, 2013.
  70. ^"Humanizing Bus Travel | Affordable Online Bus Tickets". RetrievedOctober 10, 2021.
  71. ^NiagaraScenicTours.net."Niagara Scenic Tours :: Buffalo (716) 648-7766 • Rochester (585) 438-3063 :: Travel the Scenic Route!". RetrievedOctober 10, 2021.
  72. ^"Manhattan Bus Map"(PDF).Metropolitan Transportation Authority. July 2019. RetrievedDecember 1, 2020.
  73. ^"Bronx Bus Map"(PDF).Metropolitan Transportation Authority. October 2018. RetrievedDecember 1, 2020.

External links

[edit]
Wikimedia Commons has media related toGeorge Washington Bridge Bus Station.
Seaports
Cargo
Passenger
Airports
Bridges and tunnels
Rail
Passenger
Freight
Bus stations
Roadways
Other
Historical
Routes

Fleet
Transit
hubs
Other
Routes
Terminals
Other
Operators
New York
New Jersey /
Pennsylvania
Connecticut
Routes
New York
New Jersey
Connecticut
Pennsylvania
Defunct
operators
New York
New Jersey /
Pennsylvania
Transit
centers
New York City
Long Island
Hudson Valley
New Jersey
Green spaces
Religion
Current
Former
Culture
Current
Former
Buildings and structures
Current
Former
Health
Education
Current
Former
Transportation
Subway stations
Streets and roads
Other
Related topics
Retrieved from "https://en.wikipedia.org/w/index.php?title=George_Washington_Bridge_Bus_Station&oldid=1297113881"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp