Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

GOES-17

From Wikipedia, the free encyclopedia
NOAA weather satellite

GOES-17
Processing of GOES-S at
Astrotech Space Operations Facility
NamesGOES-S
Mission typeWeather andmeteorology
OperatorNOAA / NASA
COSPAR ID2018-022AEdit this at Wikidata
SATCATno.43226
Websitegoes-r.gov
Mission duration15 years (planned)
7 years, 8 months, 26 days (elapsed)
Spacecraft properties
Spacecraft typeGOES-R Series
BusA2100A
ManufacturerLockheed Martin
Launch mass5,192 kg (11,446 lb)[1]
Dry mass2,857 kg (6,299 lb)
Dimensions6.1 × 5.6 × 3.9 m (20 × 18 × 13 ft)
Power4kW
Start of mission
Launch date1 March 2018, 22:02UTC[3]
RocketAtlas V 541 (AV-077)[4]
Launch siteCape Canaveral,SLC-41
ContractorUnited Launch Alliance
Entered service12 February 2019[2]
Orbital parameters
Reference systemGeocentric orbit
RegimeGeostationary orbit
Longitude137.3° West[5]
SlotGOES-West
Instruments
ABIAdvanced Baseline Imager
GLMGeostationary Lightning Mapper
EXISExtreme Ultraviolet and X-ray Irradiance Sensors
SUVISolar Ultraviolet Imager
MAGMagnetometer
SEISSSpace Environment In-Situ Suite

GOES-S insignia mission
← GOES-16
GOES-18 →

GOES-17 (designated pre-launch asGOES-S) is an environmental satellite operated by theNational Oceanic and Atmospheric Administration (NOAA). The satellite is second in the four-satellite GOES-R series (GOES-16, -17, -18, and -19). GOES-17 supports theGeostationary Operational Environmental Satellite (GOES) system, providingmulti-spectral imaging for weather forecasts andmeteorological andenvironmental research. The satellite was built byLockheed Martin, based on theA2100A platform, and expected to have a useful life of 15 years (10 years operational after five years of standby as an on-orbit replacement).[6] GOES-17 is intended to deliverhigh-resolutionvisible andinfrared imagery andlightning observations of more than half the globe.[7]

The satellite was launched on 1 March 2018[3] and reachedgeostationary orbit on 12 March 2018.[8] In May 2018, during the satellite's testing phase after launch, aproblem was discovered with its primary instrument, theAdvanced Baseline Imager (seeMalfunctions, below).[9][10] GOES-17 became operational asGOES-West on 12 February 2019.[2] In June 2021, NOAA announced that due to the cooling problem with the satellite's main imager,GOES-T would replace the GOES-17 in an operational role "as soon as possible".[11] GOES-T launched on March 1, 2022.[12][13]

Operations

[edit]
Launch of GOES-S aboard an Atlas V

The satellite was launched into space on 1 March 2018 by anAtlas V (541)launch vehicle fromCape Canaveral Air Force Station,Florida.[3] It had a launch mass of 5,192 kg (11,446 lb).[3][14] On 12 March 2019, GOES-17 joined GOES-16 (launched in 2016) in geostationary orbit at 35,700 km (22,200 mi) aboveEarth.[8]

On 24 October 2018, GOES-17 began a 20-day, 2.5°/day westward drift maneuver from its checkout position of 89.5° West longitude to its operational position of 137.2° West. During the drift maneuver, all instruments except for themagnetometer were disabled. Meanwhile,GOES-15 began an eastward drift maneuver on 29 October 2018 to 128° West, with all of its sensors still functioning. It reached its new location on 7 November 2018. GOES-17 began transmitting its first images on 13 November 2018. The first high-definition images transmitted were ofAlaska,Hawaii, and thePacific Ocean.[15] GOES-15's drift was intended to provide additional separation from GOES-17 to prevent communication interference. GOES-17 reached its assigned longitude 13 November 2018 and began additional testing.[5] GOES-17 was declared operational on 12 February 2019. Both GOES-17 and GOES-15 operated in tandem through early 2020 to allow assessment of GOES-17's performance as GOES-West.[16] On 2 March 2020, GOES-15 was deactivated and moved to a storage orbit with plans to re-activate it in August 2020 to supplement GOES-17 operations due to theknown flaws with theAdvanced Baseline Imager.[17][18]

Malfunctions

[edit]
The GOES-16 Advanced Baseline Imager before satellite integration

On 23 May 2018, NOAA announced that there were problems with the cooling system of the Advanced Baseline Imager.[9][10] Due to the cooling failure,infrared andnear-infrared imaging was only possible 12 hours per day. The issue affects 13 of the infrared and near-infrared channels on the instrument. No other sensors of the satellite are affected.

During a media conference call on 24 July 2018,[19] the problem component was identified as theloop heat pipe, which transports heat from thecryocooler and ABI toradiators.[20] The degraded performance of this component means the ABI gets hotter than intended, which lowers the sensitivity of theinfrared sensors. In order to work properly, the sensors need to be cooled to varying degrees depending on what wavelength they observe; the sensors operating in the longest wavelengths need to be kept as low as −212.8 °C (−351.0 °F; 60.3 K) in order to reducethermal noise.[nb 1]

The GOES-R System program director, Pam Sullivan,[21] said on the conference call that preliminary projections suggested that via thermal mitigation measures such as changing the spacecraft alignment, ABI performance could be significantly improved, depending on the season. The orbit of the spacecraft brings the ABI into full sunlight more often around theequinoxes, resulting in more solar radiation being absorbed by the ABI and degrading the performance of the infrared channels, with projections indicating that 10 of the 16 channels will be available 24 hours a day, with the other six channels available for "most of the day, to varying degrees, depending on their wavelength.[19] Around thesolstices, the orbit alignment is such that the ABI receives less direct sunlight, and it is projected that 13 of the 16 channels will be available 24 hours a day with the other three channels available 20 or more hours per day.

The loop heat pipe (LHP) was manufactured byOrbital ATK (now owned byNorthrop Grumman). On 2 October 2018, NOAA and NASA appointed a five-member Mishap Investigation Board to further examine the issue.[22] NOAA worked with Northrop Grumman to identify exactly what caused the loop heat pipe to fail, using engineering-grade copies of the spacecraft components for testing.[19] Possible causes mentioned in the conference call included debris or foreign objects inside the heat pipe, or an improper amount ofpropylene coolant. The final conclusion of the independent failure review team's investigation, released on 3 October 2018, was that "the most likely cause of the thermal performance issue isforeign object debris (FOD) blocking the flow of the coolant in the loop heat pipes. A series of ground-based tests introducing FOD into test pipes support FOD as the most likely cause. A second potential cause, mechanical failure, was investigated and deemed unlikely. The failure review team recommended changes to the ABI radiators on the subsequent GOES-R Series satellites, including a simpler hardware configuration and the use ofammonia as the coolant rather than propylene. The system was redesigned, and aCritical Design Review (CDR), originally scheduled for December 2018 but delayed as a result of agovernment shutdown, was eventually held on 7–8 February 2019.[16]

Various software workarounds were introduced in order to minimize the impact of the loop heat pipe (LHP) problem on GOES-17.

In October 2018, Lockheed Martin finished assembling the next unit of the GOES-R series,GOES-T, and was preparing to begin environmental testing of the completed satellite, when NOAA ordered the removal of the ABI to return to the manufacturer,Harris Corporation, for remanufacturing.[23][nb 2] As a result, the scheduled May 2020 launch of GOES-T was delayed[23][24] until March 1, 2022.[25] The 2024 launch ofGOES-U will probably not be delayed as a result of the redesign.[19]

On 20 November 2018, a memory error occurred in the ABI which resulted from a software update for its cryocooler subsystem. This resulted in automated onboard safety checks shutting down the cryocooler. It was restored to operation on 25 November 2018, and engineers began working on a permanent software fix for deployment in January 2019.[26][27]

On 15 August 2019, GOES-17 experienced a brief "spacecraft anomaly" from about 13:45 to 17:00 UTC. This anomaly prevented delivery of all bands and scenes.[28]

Objectives

[edit]

NOAA's GOES-R Series of satellites is designed to improve the forecasts ofweather,ocean, and environment by providing faster and more detailed data, real-time images oflightning, and advanced monitoring of solar activities andspace weather. GOES-17 can collect three times more data at four times image resolution, and scan the planet five times faster than previous probes.

GOES-17 has the same instruments and capabilities as GOES-16 (currently serving as GOES-East), and will complement its work by scanning a different area of the world. GOES-17 is GOES-West when it moves to 137.2° West longitude and cover the west coast of thecontinental U.S.,Hawaii, and much of thePacific Ocean. These two satellites are expected to monitor most of theWestern Hemisphere and detect natural phenomena and hazards in almost real time.[8][29]

Its capabilities will allow better:[29]

  • fire track and intensity estimation
  • detection of low cloud/fog
  • tropical cyclone track and intensity forecasts
  • monitoring of smoke and dust
  • air quality warnings and alerts
  • transportation safety and aviation route planning
  • advanced monitoring ofatmospheric river events that can cause flooding and mudslides

Along with GOES-16, these newly advanced satellites can give near-real-time updates on what is happening in the atmosphere across the United States.[30]

Instruments

[edit]

The instrument suite of GOES-17 is identical to that ofGOES-16. It includes:[31]

Earth sensing

[edit]
Earth as seen from GOES-17 on 20 May 2018

Advanced Baseline Imager (ABI)

[edit]

TheAdvanced Baseline Imager (ABI) was built byHarris Corporation[32] Space and Intelligence Systems (formerlyITT/Exelis) for the GOES-R line of satellites for imaging Earth's weather, climate and environment. Key subcontractors for the ABI instrument includedBAE Systems, Babcock Incorporated,BEI Technologies,DRS Technologies,L-3 Communications SSG-Tinsley andNorthrop Grumman Space Technology, andOrbital ATK.[33] The imaging capabilities of the ABI are superior to previous imagers in several ways.

Spectral resolution
[edit]
ABI images of North America across the 16 spectral bands

This instrument has 16 bands (11 more than the last GOES imager:[34])

2 Visible Bands:

  • Band 1:0.45–0.49 μm ("Blue")
  • Band 2:0.60–0.68 μm ("Red")

4 Near IR Bands:

  • Band 3:0.847–0.882 μm ("Veggie")[nb 3]
  • Band 4:1.366–1.380 μm ("Cirrus")
  • Band 5:1.59–1.63 μm ("Snow/Ice")
  • Band 6:2.22–2.27 μm ("Cloud Particle Size")

10 other Infrared Bands:

  • Band 7:3.80–3.99 μm ("ShortwaveWindow")
  • Band 8:5.79–6.59 μm ("Upper-LevelTroposphericWater Vapor")
  • Band 9:6.72–7.14 μm ("Mid-Level Tropospheric Water Vapor")
  • Band 10:7.24–7.43 μm ("Lower-Level Tropospheric Water Vapor")
  • Band 11:8.23–8.66 μm ("Cloud-TopPhase")
  • Band 12:9.42–9.80 μm ("Ozone")
  • Band 13:10.18–10.48 μm ("Clean IRLongwave Window")
  • Band 14:10.82–11.60 μm ("IR Longwave Window")
  • Band 15:11.83–12.75 μm ("Dirty IR Longwave Window")
  • Band 16:12.99–13.56 μm ("CO2 Longwave Infrared")
Temporal resolution
[edit]

The temporal resolution of ABI products changes depending on the type of image:

  • Imaging of entire western hemisphere occurs every 5 to 15 minutes, while previously this was a scheduled event, with at most three photos per hour.[34]
  • Imaging of the continental United States once every 5 minutes, compared to one every 15 minutes in previous satellites
  • One detailed image over some 1,000 by 1,000 km (620 by 620 mi) box every thirty seconds, a capability previous imagers did not have.
Spatial resolution
[edit]

Spatial resolution will be dependent on what band is being used - band 2 is the highest resolution out of all channels, with a resolution of 500 m (1,600 ft). Channels 1, 3, and 5 will have a resolution of 1 km (0.6 mi), while all other bands inNIR/IR will have a resolution of 2 km (1.2 mi).[35]

Geostationary Lightning Mapper (GLM)

[edit]

TheGeostationary Lightning Mapper (GLM) is used for measuring lightning (in-cloud and cloud-to-ground) activity. To do this, it considers a single channel in theNIR (777.4-nm) constantly, even during the day, to catch flashes from lightning.

The sensor has a 1372 × 1300 pixelCCD, with an 8–14 km (5.0–8.7 mi) spatial resolution (with the resolution decreasing near the edges of thefield of view (FOV). The GLM has a frame interval of 2 milliseconds, meaning it considers the entire study area 500 times every second.[36]

Development of the GLM was contracted to the Lockheed Martin Advanced Technology Center inPalo Alto, California.[37]

Solar imaging

[edit]
The Solar Ultraviolet Imager captures asolar flare on 28 May 2018 across different spectral bands.
Magnetometer data showing the effects ofplasma waves in 2018
  • Solar Ultraviolet Imager (SUVI) for observing coronal holes, solar flares and coronal mass ejection source regions.
  • Extreme Ultraviolet and X-ray Irradiance Sensors (EXIS) for monitoringsolar irradiance in the upper atmosphere. It was built at theLaboratory for Atmospheric and Space Physics at Boulder, Colorado. It has three separate sensors: one forX-ray, one for extreme ultraviolet and a third one which is a combination of X-ray andextreme ultraviolet.[38]
  • The sensors aboard EXIS, XRS and EUVS, monitor solar flares in order to give warning of events strong enough to cause radio blackouts and both are used to make space weather predictions. More specifically, XRS monitors the X-ray variability from theSun, and EUVS looks for short and long time scale variability in extreme-ultraviolet output from the Sun; both instruments intend to give a more clear picture of the Sun's varying influence on Earth'supper atmosphere.[39]

Space environment measuring

[edit]

Transponders

[edit]
  • The Geostationary Search and Rescue (GEOSAR) for relayingdistress signals from users in difficulty to search and rescue centers
  • Data Collection and Interrogation Service (DCIS) for data collection from in-situ Data Collection Platforms

Notes

[edit]
  1. ^The sensor is sensitive to temperatures similar to its (uncooled) operating temperature. Essentially, the sensor is detecting itself, which significantly raises thenoise floor and makes it difficult to discriminate legitimate signals.
  2. ^The loop heat pipe was actually manufactured byOrbital-ATK, which is now a part ofNorthrop Grumman, while theAdvanced Baseline Imager (ABI) was built byExelis Inc., now a part of Harris Corp.
  3. ^This band is nicknamed "Veggie" because vegetation is highly reflective to infrared light at this wavelength. Seered edge. It can be used as a proxy for a green channel in visible light, which the ABI lacks.

References

[edit]
  1. ^"Satellite: GOES-S".OSCAR. World Meteorological Organization (WMO). 30 November 2019. Retrieved21 January 2021.
  2. ^abSpears, Chris (12 February 2019)."Colorado Built GOES-17 Satellite Now Operational For Western U.S." CBS Denver. Retrieved12 February 2019.
  3. ^abcdGraham, William (1 March 2018)."ULA Atlas V successfully launches with GOES-S". NASASpaceFlight.com. Retrieved1 March 2018.
  4. ^"AV-077". Spaceflight Now.Archived from the original on 4 March 2018. Retrieved7 March 2017.
  5. ^ab"GOES-17 Post-Launch Testing and Transition to Operations".goes-r.gov. 31 January 2019. Retrieved15 July 2022.Public Domain This article incorporates text from this source, which is in thepublic domain.
  6. ^"Mission Overview".GOES-R.gov. NOAA. Retrieved1 August 2016.Public Domain This article incorporates text from this source, which is in thepublic domain.
  7. ^Nyirady, Annamarie (13 February 2019)."NOAA's GOES-17 Satellite is Now Operational". Satellite Today. Retrieved2 April 2019.
  8. ^abc"GOES-S Reaches Geostationary Orbit".goes-r.gov. NOAA. 12 March 2018. Retrieved18 March 2018.Public Domain This article incorporates text from this source, which is in thepublic domain.
  9. ^ab"Scientists Investigate GOES-17 Advanced Baseline Imager Performance Issue". NOAA. 23 May 2018. Retrieved23 May 2018.Public Domain This article incorporates text from this source, which is in thepublic domain.
  10. ^abJohnson, Scott (23 May 2018)."Newest NOAA weather satellite suffers critical malfunction". Ars Technica. Retrieved23 May 2018.
  11. ^Werner, Debra (25 June 2021)."NOAA to replace GOES-17 satellite ahead of schedule". SpaceNews. Retrieved27 June 2021.
  12. ^"NASA, NOAA Adjust GOES-T Launch Date". NASA. 18 November 2021. Retrieved18 November 2021.Public Domain This article incorporates text from this source, which is in thepublic domain.
  13. ^Sharifi, Taban."GOES-T Satellite Has Reach Geostationary Orbit".Weather Nation.Archived from the original on 22 March 2022.
  14. ^Ray, Justin (22 August 2016)."Sophisticated new U.S. weather observatory being readied for launch". Spaceflight Now. Retrieved19 October 2016.
  15. ^"GOES-16/17 Transition". NOAA. 4 March 2020. Archived fromthe original on 4 March 2020. Retrieved4 March 2020.Public Domain This article incorporates text from this source, which is in thepublic domain.
  16. ^ab"GOES-17 ABI Performance".goes-r.gov. NOAA. Retrieved26 May 2019.Public Domain This article incorporates text from this source, which is in thepublic domain.
  17. ^"GOES-16/17 Transition". NOAA. 19 February 2020. Archived fromthe original on 4 March 2020. Retrieved3 March 2020.Public Domain This article incorporates text from this source, which is in thepublic domain.
  18. ^"GOES-15 is no longer sending data". CIMSS. 2 March 2020. Retrieved3 March 2020.
  19. ^abcd"GOES-17 ABI Media Call recording". NOAA. 24 July 2018. Retrieved25 July 2018.Public Domain This article incorporates text from this source, which is in thepublic domain.
  20. ^"GOES-17 Loop Heat Pipe Fact Sheet"(PDF). NOAA. 24 July 2018. Archived fromthe original(PDF) on 26 July 2018. Retrieved25 July 2018.Public Domain This article incorporates text from this source, which is in thepublic domain.
  21. ^"Program Team – GOES-R Series".goes-r.gov. NOAA. Retrieved26 July 2018.Public Domain This article incorporates text from this source, which is in thepublic domain.
  22. ^Potter, Sean (2 October 2018)."NASA, NOAA Convene GOES-17 Mishap Investigation Board". NASA. Retrieved25 October 2018.Public Domain This article incorporates text from this source, which is in thepublic domain.
  23. ^abWerner, Debra (9 January 2019)."Lockheed Martin halts work on GOES-T to wait for instrument fix". SpaceNews. Retrieved26 May 2019.
  24. ^Volz, Stephen (15 February 2019)."NOAA Geostationary Satellite Programs Continuity of Weather Observations"(PDF). NOAA NESDIS. Archived fromthe original(PDF) on 26 May 2019. Retrieved26 May 2019.Public Domain This article incorporates text from this source, which is in thepublic domain.
  25. ^Clark, Stephen (1 March 2022)."Live coverage: Atlas 5 counting down to launch with weather satellite".Spaceflight Now. Retrieved1 March 2022.
  26. ^"Administrative: Update on the Operational Declaration of GOES-17 and Transition Plan Status". General Satellite Messages. NOAA Office of Satellite and Product Operations. 3 December 2018. Retrieved10 February 2019.Public Domain This article incorporates text from this source, which is in thepublic domain.
  27. ^Konkel, Frank (7 December 2018)."Software Glitch Adds to Issues for NOAA's Newest Weather Satellite". Nextgov. Retrieved10 February 2019.Public Domain This article incorporates text from this source, which is in thepublic domain.
  28. ^"GOES-17 ABI L1b All Bands..." NOAA. 15 August 2019. Retrieved2 October 2019.Public Domain This article incorporates text from this source, which is in thepublic domain.
  29. ^ab"GOES-R Series Mission". NOAA. Retrieved16 March 2018.Public Domain This article incorporates text from this source, which is in thepublic domain.
  30. ^Vrydaghs, McCall (2 April 2019)."Warning technology greatly changes since Xenia tornado".Dayton Daily News. Retrieved2 April 2019.
  31. ^"GOES-R Series Satellites Spacecraft and Instruments". NOAA. Retrieved16 March 2018.Public Domain This article incorporates text from this source, which is in thepublic domain.
  32. ^"GOES-R Advanced Baseline Imager". Harris Corporation. Archived fromthe original on 5 July 2018. Retrieved4 December 2018.
  33. ^"ITT Passes Review for GOES-R Advanced Baseline Imager".GIM international (Press release). Geomares Publishing. 27 February 2007. Retrieved17 September 2018.
  34. ^ab"Instruments: Advanced Baseline Imager (ABI)". NOAA. Retrieved4 December 2018.Public Domain This article incorporates text from this source, which is in thepublic domain.
  35. ^Schmit, Timothy J.; et al. (April 2017)."A Closer Look at the ABI on the GOES-R Series".Bulletin of the American Meteorological Society.98 (4):681–698.Bibcode:2017BAMS...98..681S.doi:10.1175/BAMS-D-15-00230.1.
  36. ^Goodman, Steven J.; et al. (May 2013)."The GOES-R Geostationary Lightning Mapper (GLM)"(PDF).Atmospheric Research.125:34–49.Bibcode:2013AtmRe.125...34G.doi:10.1016/j.atmosres.2013.01.006.hdl:2060/20110015676.S2CID 123520992. Archived fromthe original(PDF) on 20 March 2018. Retrieved19 March 2018.
  37. ^"Instruments: Geostationary Lightning Mapper (GLM)".goes-r.gov. NOAA. Retrieved18 October 2018.Public Domain This article incorporates text from this source, which is in thepublic domain.
  38. ^"GOES-17 shares first data from EXIS instrument". University of Colorado Boulder. 31 May 2018. Retrieved31 January 2019.
  39. ^"EXIS".goes-r.gov. NOAA. Retrieved4 February 2019.Public Domain This article incorporates text from this source, which is in thepublic domain.

External links

[edit]
Wikimedia Commons has media related toGOES 17.
SMS (predecessor)
SMS derived
1st generation
2nd generation
3rd generation
4th generation
January
February
March
April
May
June
July
August
September
October
November
December
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ).
Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).
Retrieved from "https://en.wikipedia.org/w/index.php?title=GOES-17&oldid=1314514343"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp