| Overview | |||
|---|---|---|---|
| Franchises | Thameslink and Great Northern 1 Apr 2006 – 13 Sep 2014 | ||
| Main regions | East of England, London,South East England | ||
| Stations operated | 77 | ||
| Parent company | FirstGroup | ||
| Reporting mark | FC | ||
| Predecessor | Thameslink, 2 Mar 1997 – 31 Mar 2006 | ||
| Successor | Govia Thameslink Railway, 14th Sep 2014 – present | ||
| Technical | |||
| Length | 778.9 km (484.0 mi)[citation needed] | ||
| Other | |||
| Website | web | ||
| |||
First Capital Connect[1] (FCC) was a Britishtrain operating company, owned byFirstGroup, that operated theThameslink andGreat Northern sectors from April 2006 to September 2014 which later became theThameslink, Southern and Great Northern(TSGN) franchise.[2]
First Capital Connect was a major provider of commuter and regional services in London and the south east of England. It operated passenger rail services fromLuton andBedford via theThameslink toSutton,Wimbledon andBrighton viaCentral London.
It also operated commuter, suburban and regional services out ofLondon King's Cross andLondon Moorgate toHertfordshire,Cambridgeshire andNorfolk. Major destinations served includedCambridge,King's Lynn andPeterborough.
First Capital Connect ceased operations at 02:00 on 14 September 2014, when the franchise was taken over byGovia Thameslink Railway, and became part of the largerThameslink, Southern and Great Northern franchise.
On 8 April 2005, theStrategic Rail Authority announced thatDanish State Railways/EWS,FirstGroup,John Laing/MTR,National Express andStagecoach had been shortlisted for theThameslink Great Northern franchise.[3] On 13 December 2005, theDepartment for Transport awarded the new franchise to FirstGroup, with the services operated byThameslink andWest Anglia Great Northern transferring to First Capital Connect on 1 April 2006.[4]
The term of the franchise was originally for nine years, finishing in 2015. This was dependent on performance targets being met at the end of the fourth year, which would trigger an automatic two-year extension, and an extension for up to three years after the sixth year at the discretion of the DfT.[5] It was announced on 5 August 2011 that the franchise would end on 14 September 2013. "This will help to facilitate the continued project delivery of the Thameslink Programme, in particular the introduction of new rolling stock, which will be completed after the expiry date of the existing franchise."[6]
The Thameslink franchise and the Great Northern part of theWest Anglia Great Northern franchise were amalgamated in preparation for theThameslink Programme (formerly Thameslink 2000), designed to increase capacity on the Thameslink route, with trains from King's Lynn, Cambridge and Peterborough.[7] On 24 July 2007 the government announced that it was fully committed to funding the Thameslink Programme,[8] and the project is now largely complete.
In the early part of 2007, First Capital Connect conducted a study and undertook consultation on options for increasing the capacity of services to Peterborough and Cambridge. The final recommendations involved lengthening four peak services from eight to 12 carriages from May 2009, and adding or removing a small number of stops to balance loads between trains.[9][10] 1,779 more seats have been provided during the morning peak and 2,490 during the evening peak, significantly reducing the number of rush-hour commuters unable to find a seat.[citation needed]
In December 2011, the DfT announced that all services operated by First Capital Connect would be included within the newThameslink, Southern and Great Northern franchise.[11]
On 29 March 2012, the Department for Transport announced thatAbellio,FirstGroup,Govia,MTR andStagecoach had been shortlisted for the new franchise.[12][13]
The Invitation to Tender was to have been issued in October 2012 and the successful bidder announced in early 2013. But in the wake of theInterCity West Coast re-franchising process collapsing, the government announced in October 2012 that the process would be put on hold pending the results of a review.[14]
In January 2013 the government announced it would be exercising an option to extend the franchise until 31 March 2014.[15]
In March 2013, theSecretary of State for Transport announced plans for a direct award franchise to run until 13 September 2014.[16] On 18 February 2014 the Department for Transport announced it had agreed a new short-term franchise with First Capital Connect, running for six months to September 2014.[17]
On 23 May 2014 the new TSGN franchise was awarded to Govia with services operated by First Capital Connect transferring toGovia Thameslink Railway on 14 September 2014.[18]
This sectiondoes notcite anysources. Please helpimprove this section byadding citations to reliable sources. Unsourced material may be challenged andremoved.(December 2012) (Learn how and when to remove this message) |
The routes operated by First Capital Connect off-peak Monday to Friday were, with frequencies in trains per hour:
Unlike the Thameslink route, there was only one control centre for FCC services on the Great Northern route, at King's Cross, within the power signal box.
This gave a frequency of 10 trains between London Blackfriars and St Pancras which increased during peak hours.[19]
FCC had two control centres (or 'Service Delivery Centres', SDC) for the Thameslink route. North of Blackfriars was controlled fromWest Hampstead, within the powersignal box; south of Blackfriars from Three Bridges, which was also home to other southernTOC controls.
The disruptions were triggered by FCC drivers declining to work overtime or during their allotted rest days, following their rejection of a proposed pay increase of 0% (rising to 3% in 2010). Without access to overtime and rest day work, FCC was unable to provide enough drivers to maintain its standard Thameslink service.[20] Disruption continued into January 2010 as a result of heavy snow in south-east England; although snow was not the only problem, and although significant snowfall ended on 6 January, FCC continued to run emergency timetables through to 11 January.[21]
Trains returned to the normal timetables from 18 January,[22] but delays and cancellations continued as a result of signalling problems. It was revealed that First Capital Connect achieved 60% in its punctuality during the first half of January 2010 on the Thameslink route. First Capital Connect has since offered improved discount and refund packages for customers affected by the disruption.[23]
On 23 December 2010 FCC introduced an emergency timetable on the Great Northern route, reducing the number of rush-hour trains by 75%. This was due to snow which had damaged some of the trains, making them unable to run.[citation needed]
Angry commuters started a petition on the Prime Minister's website to end First Capital Connect's franchise during 2009.[24] Other people have asked for a full enquiry into the service,[citation needed] whileLord Adonis, the formerSecretary of State for Transport, described the service offered by FCC on its Thameslink route as "shoddy" and "very substandard", and said that if improvements were not made the company could be stripped of its franchise.[25][26]
In its Autumn 2009 National Passenger Survey,Passenger Focus said FCC had the lowest overall satisfaction rating of any UK train operator, at 75%.[27]
In early 2013,consumer groupWhich? carried out a survey which rated First Capital Connect as the worst train operator in the UK.[28]
First Capital Connect was criticised for running some of the country's most overcrowded trains; the 07.15 from Cambridge to London King's Cross frequently was reported to have had 76 people standing for every 100 seated.[29] This situation was recognised by FCC itself: "We recognise that overcrowding is the biggest issue affecting our customers. This is at an unacceptable level on some of our services".[30] From 27 May 2009 FCC introduced extra carriages, which meant that this service became a 12-car train rather than an 8-car.[citation needed]
In mid-2006, First Capital Connect introduced evening peak-time fares for northbound travel out of London as a franchise commitment with the Department for Transport. Previously passengers with an off-peak travelcard could travel on any train after the morning peak had finished at 09:30 however, passengers would no longer be able to use an off-peak ticket for trains leaving London stations between 16:30 and 19:00. Passengers using these peak-hour trains would pay an additional charge to travel. The evening peak restriction does not affect southbound travel. This was introduced due to severe peak-time overcrowding.[31]
Students at somesixth-form colleges were hit by price increases of over £300 per annum when FCC replaced a discount scheme introduced by previous franchise holders WAGN and Thameslink, with its own 'Student Connect'[32] scheme. The level of discount was greatly reduced, and although in theory the scheme is fairer, in practice many students and parents were left out of pocket.[33]
In September 2010, First Capital Connect admitted in an email that, despite being trained in first aid, staff were not allowed to offer medical help to members of the public. An incident was reported by the BBC after a passenger collapsed and FCC's station staff would not help.[34]
In October 2010, passengers trapped on a failed train nearCambridge gave up waiting, forced the train doors open and walked up the line to the nearbyFoxton station.[35]
On 26 May 2011 at 18:27, passengers were trapped on a failed Class 377 train between St Pancras International (Low Level) and Kentish Town stations, forming the 16:30 Brighton to Bedford service. Another train of the same type was sent to assist the failed train, and was eventually coupled to it at 20:20 but by this time passengers had used the emergency release handles to open the train doors in an attempt to improve ventilation (as the air-conditioning and lighting systems were no longer functioning by this point). The train began to move at 21:03 but this movement was immediately stopped because passengers were egressing onto the track from the carriages within the tunnel. The passengers were escorted back on to the train, which was authorised to move forward again at 21:12. Three sets of doors towards the rear of the train were still fully open while it travelled approximately a mile to Kentish Town, where all passengers then left the train.[36] First Capital Connect admitted a number of failings in the way in which it handled this incident, including a need to improve communications with passengers.[37]
First Capital Connect inherited a fleet of Class 319 units from the former Thameslink operator. It also inherited a fleet of Class 313, 317 and 365 units from WAGN on the Great Northern routes.
The rolling stock composition is specified by the franchise agreement.[38]
| Class | Image | Type | Top speed | Number | Routes operated | Built | |
|---|---|---|---|---|---|---|---|
| mph | km/h | ||||||
| Class 03 | Diesel Locomotive | 28 | 46 | 1 | Shunting | 1957–1961 | |
| Class 313 | EMU | 75 | 120 | 44 | Inner suburbanGreat Northern (Moorgate -Letchworth Garden City/Hertford North/Welwyn Garden City) | 1976–1977 | |
| Class 317/1 | 100 | 160 | 12 | Fast & Semi FastGreat Northern London King's Cross toPeterborough &Cambridge | 1981–1982 | ||
| Class 317/7 | 2 | Used to provide cover forClass 365 units undergoing refurbishment. Withdrawn at end of franchise. | |||||
| Class 319 | 84 | Thameslink (Brighton -Bedford,Sutton -Luton andKentish Town -Sevenoaks) | 1987–1988 1990 | ||||
| Class 321 | 13 | Fast & Semi FastGreat Northern London King's Cross toPeterborough &Cambridge | 1989–1990 | ||||
| Class 365Networker Express | 40 | Fast & Semi FastGreat Northern London King's Cross toPeterborough &King's Lynn viaCambridge | 1994–1995 | ||||
| Class 377/2Electrostar | 11 | Thameslink (Brighton -Bedford and peak services:Bedford -Ashford International/Rochester) Class 377/2s sub-leased fromSouthern. | 2003–2004 | ||||
| Class 377/5Electrostar | 23 | 2008–2009 | |||||
All Thameslink route rolling stock waselectrically powered dual-voltage four-car units using25 kV AC overhead power north of Farringdon and 750 V DCthird rail to the south.
In addition to its EMU fleet, FCC owned the last mainline-registeredClass 03 diesel shunter, 03179Clive.
An additional fourClass 319s were transferred fromSouthern in March 2009 to expand capacity on the Thameslink route, giving FCC all 86 319s.[citation needed] The DfT ordered 23 new dual-voltageClass 377 units for Southern, which entered service in 2010 and were sublet to FCC until the new Thameslink rolling stock is introduced, to further enhance capacity on the Thameslink services.[39] FCC also gained 13Class 321s fromLondon Midland: 321401-406 in May 2009, 321407-410 later in 2009, 321418-420 in 2010. These enhanced the capacity on Peterborough / Cambridge - King's Cross services. ThreeClass 313 units fromLondon Overground moved to the Great Northern route for inner-suburban services, King's Cross/Moorgate - Welwyn Garden City/Hertford North/Letchworth Garden City, once all of London Overground's newClass 378s were delivered.
FCC operated two depots:
During its tenure, FCC overhauled all of its rolling stock painting their exteriors in the FCC livery and refreshing the interiors.[40] It had an£8 million programme of upgrades for several major stations.[41]
Media related toFirst Capital Connect at Wikimedia Commons
| Preceded by Thameslink Thameslink franchise | Operator of Thameslink and Great Northern franchise 2006 – 2014 | Succeeded by |
| Preceded by West Anglia Great Northern West Anglia Great Northern franchise |