Edmonton LRT

Route map:
From Wikipedia, the free encyclopedia
(Redirected fromEdmonton Light Rail Transit)
Light rail system in Edmonton, Alberta

Edmonton LRT
A Siemens SD-160 LRV at South Campus station on the Capital Line
ASiemens SD-160 LRV atSouth Campus station on the Capital Line
A Bombardier Flexity Freedom LRV at the Churchill Station on the Valley Line
ABombardier Flexity Freedom LRV at theChurchill Station on the Valley Line
Overview
LocaleEdmonton, Alberta, Canada
Transit typeLight rail
Number of lines3
Number of stations29
Daily ridership105,900 (weekdays, Q2 2025)[1]
Annual ridership29,145,000 (2024)[2]
WebsiteEdmonton Transit Service
Operation
Began operationApril 22, 1978; 47 years ago (1978-04-22)
Operator(s)Edmonton Transit Service
Technical
System length37.4 km (23.2 mi)[3][4]
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
Electrification
System map
MapShow interactive map
Show static map
CN lines
Clareview
ParkingClareview Transit Centre
137 Avenue
Belvedere
ParkingBelvedere Transit Centre
CN lines
Blatchford Gate
Coliseum
Coliseum Transit Centre
NAIT/Blatchford Market
Kingsway/Royal Alex Transit Centre
Kingsway/​Royal Alex
CN Spur End
MacEwan
Stadium
ParkingStadium Transit Centre
Churchill
Quarters
Central
Bay/Enterprise Square
Corona
Muttart
Government Centre Transit Centre
Government Centre
Strathearn
Holyrood
University Transit Centre
University
Bonnie Doon
Health Sciences/Jubilee
Avonmore
McKernan/​Belgravia
Davies
ParkingDavies Transit Centre
South Campus/Fort Edmonton Park Transit Centre
South Campus/
Fort Edmonton Park
Southgate Transit Centre
Southgate
Millbourne/​Woodvale
Century Park Transit Centre
Century Park
Grey Nuns
Mill Woods
Mill Woods Transit Centre
Key
Capital Line
Valley Line
Metro Line
CN tracks

Handicapped/disabled access All stations are accessible

This diagram:
Show route diagram

Edmonton Light Rail Transit, commonly referred to as theLRT, is alight rail system inEdmonton, Alberta. Part of theEdmonton Transit Service (ETS), the system has 29 stations on three lines and 37.4 km (23.2 mi) of track. Much of the system has a dedicated right-of-way, while in the downtown area, vehicles run underground. As of 2018, it was the seventhbusiest light rail transit system in North America, with over 113,000 daily weekday riders.

The ETS started operation of the original LRT line in 1978, expanded by 2010 into theCapital Line, running betweenClareview in Edmonton's northeast andCentury Park in Edmonton's south end.[3] The first phase of the newerMetro Line started service between theUniversity of Alberta campus and hospital in Edmonton's south-central and theNorthern Alberta Institute of Technology northwest of downtown Edmonton in 2015, with further expansion to north Edmonton and neighbouring city ofSt. Albert planned into the future.[4] Construction of the first phase of the 27-kilometre (17 mi)Valley Line, from downtown Edmonton toMill Woods in southeast Edmonton, began in spring 2016, and opened November 4, 2023. Construction on the second phase of the Valley Line, connecting downtown to west Edmonton, began in fall 2021 and is scheduled for completion by 2028.[6][7][8]

History

[edit]
The above-ground LRT station at theUniversity of Alberta's South Campus, near the Neil Crawford Centre andFoote Field

Edmonton's population grew rapidly in the decades after theSecond World War, going from 160,000 residents in 1951 to 451,000 in 1976.[9] During the 1960s and early 1970s, city-commissioned studies recommended a number of city-wide transportation systems such as heavy rail transit lines, and freeway networks.[9] The city opted to study LRT as a "balanced" solution; being more cost effective and flexible than heavy rail (i.e., subways), but higher-capacity and less expensive in the long-term than bus-only networks utilizing freeways.[9]

Edmonton's northeast section was selected as the first area to receive transportation improvements, because its road network was at risk of being overwhelmed by new developments.[9] City Council was presented with three options in 1974: 1) A freeway-bus option, which would require 70 buses in peak hours, require substantial land acquisition, and reduce potential transit ridership; 2) an all-bus option that would require 150 buses in peak hours, which would share traffic lanes with vehicles aside from limited bus-priority measures, and; 3) an integrated option that required 75 buses in peak hours, and 14 LRT cars on a northeast line.[9] The third option had the lowest ongoing costs of the three, and City Council approved it in 1973 despite provincial funding not being secured yet.[10] In 1974, the Alberta Government pledged $45 million over four years, which was the original estimated cost of construction.[10]

Construction began in 1974 with a budget of $65 million.[11] During planning and construction, the managers of various departments and city-owned utilities coordinated through a Municipal Planning Commission, which allowed the city to reserve a path for the LRT; this included controlling the location of piles under the Edmonton Plaza Hotel to allow for LRT tunnels to be constructed later.[10] As well, members of the University of Alberta's Faculty of Engineering served as advisors for the project, and conducted research in areas such astransportation planning, traffic management,soil mechanics, and tunnelling.[10]

Edmonton became the first city inNorth America with a metropolitan population of less than one million to build a modernlight rail system.[12] It also became the first city inWestern Canada to operate a rapid transit system. Testing of the new line started in 1977 with regular service starting April 22, 1978, in time for the1978 Commonwealth Games. The line followed aCN right-of-way from Belvedere Station to Stadium Station (nearCommonwealth Stadium), via an intermediate stop at Coliseum Station (nearNorthlands Coliseum), and then continued in a tunnel under 99 Street to Central Station, at Jasper Avenue and 100 Street, including an intermediate stop at Churchill Station. The original line was 6.9 km (4.3 mi) long.[13]

Planning influences included the rail systems of Toronto (for dimensions), Montreal (underground environment), Cleveland (reuse of existing railright of way), as well as Netherlands and Germany (feeder bus routes with timed-transfers, and choice of rolling stock). Operating practices were influenced by theMBTA Green Line, British trams, and theCanadian National Railway.[14]

When the line opened, fare collection was modelled on traditional rapid transit lines, with booth attendants. Low volumes of activity at some entrances led to weekend closures of alternate station entrances. In November 1980, Edmonton Transit (as it was then named) switched to a modified European-style "proof of payment" system, retaining the old turnstiles to issue the new receipts.[15] Fares were now collected by automated ticket vending machines with irregular proof of payment inspectors, which permitted keeping all entrances open and required fewer staff.

Every station on the line constructed since 1983 has been built with full accessibility for persons with disabilities. The 1998 and 2001 upgrades to the Belvedere and Clareview stations involved installation of roofs and lengthening of platforms to accommodate five-car trains.[13]

The LRT system had an estimated 18,220 weekday passenger boardings in 1978.[13] 24 years later, after the completion of six new underground stations in the downtown and with a new terminus at the University of Alberta, boardings more than doubled to 39,550 in 2002.[13] The LRT system continues to expand, and operated with 18 stations, 24.3 km (15.1 mi) of double track and ridership of 110,786 average weekday boardings in 2018.[16] Extensions of the LRT system have resulted in significant increases in ridership; ridership increased nearly 78% in the first full year of the South Campus and Century Park extensions (2011 versus 2008), and increased 15% in the first full year of the NAIT extension (2016 versus 2014).[17]

Lines

[edit]

The system has three lines. The Capital Line, runs from northeast Edmonton to south Edmonton viaDowntown. A second line, the Metro Line, connecting Downtown with northwest Edmonton, began limited operations in September 2015. The third line, the Valley Line, runs from Southeast Edmonton to Downtown and opened in late 2023. There are further projects to extend the network towards the North, Northwest, West and South areas of the city.

During the construction of the Capital Line, surface area was preserved (although costs increased) by tunnelling under the downtown core and theUniversity of Alberta main campus. The underground portions of the LRT connect to theEdmonton Pedway system with links to many buildings. The LRT crosses theNorth Saskatchewan River between the Government Centre and University stations on theDudley B. Menzies Bridge,[18] a dedicated LRT and pedestrian bridge.

Storage, maintenance and operations of the LRT are controlled from theD.L. MacDonald Yard. TheGerry Wright Operations and Maintenance Facility provides additional storage, maintenance, and operations for the Valley Line.

The LRT operates approximately between 5:00 a.m. and 1:00 a.m. daily. During peak times, Capital Line trains run approximately every six minutes, and run every 15 minutes during off-peak hours. After 6 p.m. trains run every 15 minutes. Metro Line trains run on a twelve-minute frequency during peak times and run every fifteen minutes during off-peak times. On weekdays, Valley Line trains run on a ten-minute frequency from 5 a.m. to 9:30 p.m. and run every fifteen minutes after 9:30 p.m. On Saturdays, Valley Line trains run on a ten-minute frequency from 5 a.m. to 6:30 p.m. and run every fifteen minutes after 6:30 p.m. All trains run on a fifteen-minute frequency all day on Sundays.

Before the opening of the Metro Line, the city held a naming contest, to determine the names of the five current and future LRT lines.[19] On January 31, 2013, the city announced the names: Capital Line, Metro Line, Valley Line, Energy Line, and Festival Line.[20][21]

Edmonton LRT lines
LineTerminiStationsLength
021RCapital LineClareviewCentury Park15[3]21 km (13 mi)[3]
022RMetro LineNAIT/Blatchford MarketHealth Sciences/Jubilee10 (7 shared with Capital Line)9.6 km (6 mi)
023RValley Line102 StreetMill Woods1213.1 km (8 mi)

Stations

[edit]
Main article:List of Edmonton LRT stations

The Capital Line has 15 stations:Clareview,Belvedere,Coliseum,Stadium,Churchill,Central,Bay/Enterprise Square,Corona,Government Centre,University,Health Sciences/Jubilee,McKernan/Belgravia,South Campus/Fort Edmonton Park,Southgate, andCentury Park stations. Of these, Central, Bay/Enterprise Square, Corona, Government Centre, University, and the Capital/Metro Line platform at Churchill, are underground.

Three stations are serviced by the Metro Line which opened in 2015:MacEwan,Kingsway/Royal Alex, andNAIT/Blatchford Market. The Metro Line then continues along the route of the Capital Line, heading southbound before terminating at Health Sciences/Jubilee Station. An additional station,Blatchford Gate, exists north of the current line, however is not open for passenger service.

Another 11 stops were built for the first phase of the Valley Line, which opened in late 2023:102 Street,Quarters,Muttart,Strathearn,Holyrood,Bonnie Doon,Avonmore,Davies,Millbourne/​Woodvale,Grey Nuns,Mill Woods. New street-level platforms and an entrance were built at Churchill Station in order to allow transfers between the Valley Line and the rest of the LRT network.

Rolling stock

[edit]
Edmonton Transit Service LRVs
ImageMfrModelNo.QtyDatesNotesRefs
OrderedService
Siemens-DuewagU2 (RTE 1)1001–10143719771978Largely similar to the U2 cars designed for Frankfurt; Edmonton model (designated RTE 1) is modified with extra heating, double-glazed windows, and continuous-level floor. Refurbishment completed in 2013 to extend life by 15–20 years.[22][23][24]
1015–10171980
1018–10371983
SiemensSD-1601038–10745720052008Initial 37-car order to accommodate southern extension to Century Park, delivered starting in 2008. 20-car expansion for Metro Line service delivered 2012–13.[24][25][26][27]
1075–109420102012
Bombardier/AlstomFlexity Freedom2001–20262620182023First low-floor LRVs for Edmonton, in service on the Valley Line. Seven articulated segments; 42 m (137 ft) long over couplers, 82 seats / 275 passengers.[28][29]
Hyundai RotemLRV2027–2072462021TBALow-floor LRVs, intended for Valley Line service. To accommodate the West extension to Lewis Farms, delivery scheduled for 2025–27.[30][31]
Interior of aSiemens SD-160
Interior of a refurbishedSiemens-Duewag U2

Therolling stock of the Capital Line is composed of trains of eitherSiemens-Duewag U2 orSiemens SD-160 cars. ETS operates 37 U2 cars, some of which have been in operation since the system opened in 1978. ETS also operates 57 SD-160 cars, of which 37 were ordered between 2005 and 2007, with the first cars entering revenue service on January 27, 2009.[25] An additional 20 cars were purchased in 2010 and 2011 for use in the Metro Line[32][33] and were delivered from March 2012 to April 2013.[24]

The Capital Line uses five-car trains during peak hours, four-car trains on weekends, and two-car trains are used for late night service. The Metro Line operated three-car trains until the permanentNAIT/Blatchford Market station opened, as the temporary NAIT station could only accommodate three-car trains. The permanent station is 125 metres long to accommodate a five-car train. All other extensions to the Capital and Metro lines will have five-car platforms.[34]

Interior of a Bombardier/Alstom Flexity Freedom

The Valley Line uses low-floorBombardier/AlstomFlexity Freedom vehicles.[35] The vehicles used in Edmonton are composed of seven articulated segments, and run as single trains or may be coupled together. Forty six more low-floor LRT vehicles were ordered in 2021 fromHyundai Rotem for the Valley Line, to be put in service when the West extension to Lewis Farms opens.[30]

Safety and security

[edit]

All LRT stations are monitored byCCTV cameras. All trains are equipped with operator alert systems which allow passengers to contact the train operator in the event of an emergency. Likewise, all stations are equipped with blue emergency help phones which connect with ETS Security. The stations are patrolled by transit peace officers.[36]

Despite the security measures, there have been several incidents on trains or at stations.[37]Some of the most serious incidents include:

Fares

[edit]
See also:Edmonton Transit Service § Fares

The cash fare for passengers using ETS buses and the LRT, since February 1, 2025, is $3.75 for adults, seniors and youth. Children 12 and under ride free with fare-paying rider.[48] Alternatively, passengers can pay a fare of $3.00 by tapping theirArc card on validators located at the entrances to proof-of-payment areas.[49][50]

Fare typePrice[49]
Cash fare$3.75
Arc card fare$3.00
Children 12 and underFree[a]
Day pass (family)$10.25
Monthly adult fare cap$102.00

Passengers paying a cash fare at a fare machine at an LRT station are issued a paper Arc card, which is validated on the station’s validators. This ticket is valid both as proof of payment and as a transfer. Transfers allow the passenger to transfer from the LRT to a bus, from a bus to the LRT and between buses, and is valid for 90 minutes from the time it was stamped. Passengers paying a cash fare or validating a ticket on a bus obtain a transfer at the time the fare is paid. Transfers also serve as proof of payment for 90 minutes.[51]

Passengers in an LRT proof-of-payment area must present proof of payment upon request by a transit peace officer. Proof of payment includes Arc cards and transfers. Failure to provide proof of payment can result in a $250 fine. Proof-of-payment areas include all LRT trains and LRT station platforms, except at stations where the ticket vending machines are located on the platform itself.

In 2007, ETS, theUniversity of Alberta (U of A), andMacEwan University partnered to provide students with auniversal transit pass (U-Pass), which is valid on the LRT and all ETS buses as well as onStrathcona County andSt. Albert Transit Systems.[52][53]NAIT students voted to join the program in 2010.[54] The U-Pass allows unlimited LRT and bus use. This service was temporarily suspended in fall 2020 through winter 2021 due to theCOVID-19 pandemic. The program now uses Arc cards.

Expansion

[edit]
Edmonton LRT
North St. Albert
Boudreau
Downtown St. Albert
Herbert
proposed extension to
St. Albert
Nakî Transit Centre
137 Street
127 Street
Castle Downs
145 Avenue
137 Avenue
132 Avenue
planned
Blatchford Gate
Lewis Farms
NAIT/Blatchford Market
Kingsway/​Royal Alex
Kingsway/Royal Alex Transit Centre
Aldergrove/Belmead
(182 Street)
MacEwan
West Edmonton Mall
Misericordia
proposed extension to
Energy & Tech Park
Meadowlark
Gorman
Glenwood/Sherwood
(95 Avenue)
planned
Jasper Place (156 Street)
Clareview
ParkingClareview Transit Centre
Stony Plain Rd/149 Street
Grovenor/142 Street
137 Avenue
Glenora
Belvedere
ParkingBelvedere Transit Centre
124 Street
Brewery/120 Street
The Yards/116 Street
Coliseum
Coliseum Transit Centre
MacEwan Arts/112 Street
NorQuest (107 Street)
Stadium
ParkingStadium Transit Centre
Alex Decoteau
(106/105 Street)
102 Street
Churchill
Central
Quarters
Bay/Enterprise Square
Corona
Government Centre Transit Centre
Government Centre
Muttart
Strathearn
University Transit Centre
University
Holyrood
Health Sciences/Jubilee
Bonnie Doon
McKernan/​Belgravia
Avonmore
South Campus/Fort Edmonton Park Transit Centre
South Campus/
Fort Edmonton Park
Davies
ParkingDavies Transit Centre
Southgate Transit Centre
Southgate
Alberta Highway 2.svg
Highway 2
Whitemud Drive
Alberta Highway 14.svg
Highway 14
Whitemud Drive
Century Park Transit Centre
Century Park
Millbourne/​Woodvale
Twin Brooks
Grey Nuns
Llew Lawrence OMF
Mill Woods
Mill Woods Transit Centre
Heritage Valley North
Provincial Lands
Heritage Valley Town Center
Desrochers/Allard
Key
Capital Line
Metro Line
Valley Line

Handicapped/disabled access All stations are accessible

Overview of planned lines

[edit]

The City of Edmonton prioritized completion of the Metro Line to NAIT for 2014, followed by expanding the system to the southeast and west.[55] City council approved funding to begin preliminary engineering on the Valley Line from Mill Woods to Lewis Farms in June 2011.[56]

Approved future lines/extensions
LineStatusTerminiAdditional
stations
Additional
length
Projected opening
Metro Line Northwest – Phase 2Preliminary designBlatchford GateCastle Downs+4[57]+10 kmnext priority
Metro Line Northwest – Phase 3Preliminary designCastle DownsNakî+3[57]before 2040
Valley Line West[58]Construction[59]102 Street (Downtown)Lewis Farms+16+14 km2028[60]
Capital Line South[61]Construction[62]Century ParkHeritage Valley North+2+4.5 km2030
Preliminary designHeritage Valley NorthDesrochers/Allard+3+4 kmbefore 2040
Capital Line Northeast[63]Preliminary designClareviewGorman+1[3]+2.9 kmbefore 2040
Proposed future lines/extensions
LineTerminiAdditional
stations
Metro Line St. AlbertNakîNorthSt. Albert4[64]
Capital Line NortheastGormanHorse Hill
Energy LineLewis FarmsBonnie Doon (via Stony Plain Road, downtown, the Alberta Legislature, University of Alberta, andOld Strathcona. Potential to extend toSherwood Park)
Festival LineHolyrood (potential to extend to Sherwood Park)Mill Woods (via downtown, the Alberta Legislature, University of Alberta,Old Strathcona, and Davies Industrial)

Capital Line expansion

[edit]
Main article:Capital Line

Future plans call for expanding the Capital Line to Gorman in the northeast and Heritage Valley in the south.

South extension

[edit]
Capital Line South Extension
Century Park
Twin Brooks
Llew Lawrence Operations
And Maintenance Facility
Heritage Valley North
Up arrowPhase 1
Down arrowPhase 2
Provincial Lands
Heritage Valley Town Center
Desrochers/Allard
Capital Line Northeast Extension
CN Lines │
Horse Hill extension
(proposed)
Gorman
ClareviewClareview Transit CentreParking
CN Lines │
Capital Line
toClareview

The Capital Line will be extended in two phases. Phase 1 is 4.5 kilometres long and will extend the line from Century Park just north of 23 Avenue at 111 Street to Ellerslie Road via an underpass under 23 Avenue, then rising above ground again before Saddleback Road. Phase 2 will extend from Ellerslie Road to Allard/Desrochers. The line extension will continue to use high-floor LRVs.

Preparation work for future tunneling and reception site shafts on 23 Avenue at the 111 Street and 109 Street intersections began in early November 2022.[65] Major construction of phase 1 commenced in early 2025 and is expected to be completed in four to five years, followed by testing and commissioning.[62]

Metro Line expansion

[edit]
Main article:Metro Line

NAIT to St. Albert

[edit]
Metro Line Northwest Extension
St. Albert Extension
(proposed)
Campbell Road
CN Westlock Subdivision
137 Street
127 Street
Up arrowPhase 3
Down arrowPhase 2
Castle Downs
145 Avenue
137 Avenue
132 Avenue
CN Walker Yard
Up arrowPhase 2
Down arrowPhase 1
Blatchford Gate
NAIT/Blatchford Market
NAIT
(former location)
Metro Line St. Albert Extension
North St. Albert
Boudreau
Downtown St. Albert
Herbert
Campbell Road

Beyond NAIT, the Metro Line will travel throughBlatchford (the sustainable neighbourhood being developed on the grounds of the formerCity Centre Airport), go over theCN railway yard north ofYellowhead Trail, and continue north along 113A Street, and west along 153 Avenue. The City of St. Albert has also begun preliminary plans to extend the LRT line into their borders.[64]

On May 19, 2010, the transportation department announced its recommendation for an extension of the Metro Line from NAIT station to St. Albert. This extension is expected to eventually serve 42,000 to 45,000 passengers daily.[66]

On December 16, 2022, city council approved funding to acquire land for Phase 2 of the Metro Line Northwest Expansion.[67]

Valley Line

[edit]
Main article:Valley Line (Edmonton)

The Valley Line is an under construction 27 km (17 mi), low-floor urban line running southeast to west fromMill Woods toLewis Farms, crossing through downtown. The line is being constructed in phases, with phase 1 being the 13.1 km (8.1 mi), 12-station portion betweenMill Woods and102 Street (downtown) allowing passengers to connect with theCapital Line andMetro Line atChurchill. Construction started in 2016 and the line opened on November 4, 2023.[68] Phase 2 of the Valley Line will extend the Valley Line westward from Downtown to Lewis Farms. The extension is 14 kilometres long and will add 14 new stops and 2 new stations.

Valley Line – West (Downtown to Lewis Farms)

[edit]

A planned expansion toLewis Farms, with theWest Edmonton Mall en route, is under construction as part of the 27-kilometre (17 mi) Valley Line.

The option approved by Council in 2010 was to have the west LRT extension run from downtown, along 104 Avenue andStony Plain Road before diverting south on 156 Street towards Meadowlark Health & Shopping Centre, then along an 87 Avenue alignment to West Edmonton Mall and beyond. Proponents of this route cited opportunities fortransit-oriented development.[69][70]

On November 1, 2018, the Government of Alberta announced a contribution of $1.04 billion towards the second phase of the Valley Line, extending it west to Lewis Farms with an estimated completion date of 2027–28.[71]

Controversy

[edit]

The Valley LRT to Mill Woods generated opponents, particularly on the location of the route. The Edmonton Chinese community opposed the city's plan to lay the tracks on 102 Avenue as it is directly in front of a Chinese elderly care facility. Despite demands to relocate the route to 102a Avenue, the city council voted for the original proposal.[72] Another group opposed the route saying that the new LRT bridge crossing the North Saskatchewan River would have a negative impact on the river valley and the removal of the existing footbridge during construction (replaced by a pedestrian space on theTawatinâ Bridge) would temporarily displace an existing river crossing. The city stated that the impact is minimal, no other alternative routes were suitable, and proceeded with construction.[73][74]

Concerns in 2008 and 2009 over community impacts[75] along the proposed west leg of the Valley Line[76] and north leg of the Metro Line[77] led to a larger debate over the vision guiding the various expansion plans, and the criteria used to select the routes.[78][79]

The adoption of a new signalling system (see below) for the Metro Line pushed back the start date from April 2014 to September 2015, when the line finally began operation at a frequency of 15 minutes, rather than 5. Trains only ran at a maximum of 25 km/h (16 mph) between the Churchill and NAIT stations, creating passenger delays and traffic congestion.[80] An independent safety auditor cleared trains to run at their full 50 km/h (31 mph) as of February 19, 2017.[81]

Completed extensions

[edit]
LRT system construction history[13]
LineCapital projectOpening dateTrack lengthLight rail
vehicles
StationsCost
(millions)
Other features
  CapitalFirst segmentApril 22, 19786.9 km (4.3 mi)145[b]C$64.9
  CapitalClareview extension[c]April 19812.2 km (1.4 mi)31C$9.5Park 'n ride lot with 450 stalls
  CapitalCorona extension[d]June 19830.8 km (0.5 mi)202[e]C$89.6
  CapitalD.L. MacDonald YardDecember 1983[f]C$28.2
  CapitalGovernment Centre extension[d]September 19890.8 km (0.5 mi)1C$67.1
  CapitalUniversity extension[d]
(single track from south portal)
August 23, 19921.6 km (1.0 mi)1C$79.1Dudley B. Menzies Bridge
  CapitalUniversity extension
(second track from south portal)
May 14, 1994
  CapitalBelvedere upgradeSeptember 23, 1998C$6.3Covered five-car platform
Grade-separated pedestrian overpass
  CapitalClareview upgradeMarch 4, 2001C$11.5Covered five-car platform
Pedestrian underpass
Transit centre on either side
Park 'n ride increased to approximately 1,500 stalls
  CapitalHealth Sciences extension[d]January 4, 20060.6 km (0.4 mi)1C$100
  CapitalSouth Campus extension[d]April 25, 20092.2 km (1.4 mi)37[82]2[g]C$690transit centre
pedestrian underpass
busway bridge[83]
  CapitalCentury Park extension[d]April 24, 20105.4 km (3.4 mi)2[h]two transit centres
two overhead pedways
one park 'n ride
  MetroNAIT branchSeptember 6, 20153.3 km (2.1 mi)203[i]C$665overhead pedway at MacEwan
one transit centre
pedestrian overpass with elevator at Health Sciences[84]
  ValleyValley Line Southeast
(102 Street toMill Woods)
November 4, 202313.1 km (8.1 mi)2611[j]C$1,800Tawatinâ Bridge
Gerry Wright Operations and Maintenance Facility
two transit centres
one park 'n ride
  MetroMetro Line Northwest – Phase 1January 20, 20241.6 km (0.99 mi)2[k]C$291New Permanent NAIT/Blatchford Market Station
shared use paths
Notes
  1. ^Must be accompanied by a fare-paying adult
  2. ^Belvedere to Central
  3. ^Northeastern extension
  4. ^abcdefSouthern extension
  5. ^Central to Corona via Bay/Enterprise Square
  6. ^Between Clareview and Belvedere
  7. ^Health Sciences to South Campus via McKernan
  8. ^South Campus to Century Park via Southgate
  9. ^Churchill to NAIT via MacEwan and Kingsway/Royal Alex
  10. ^102 Street to Mill Woods via Churchill
  11. ^NAIT to Blatchford Gate via NAIT/Blatchford Market

Capital Line

[edit]

On April 26, 1981, ETS opened a northeastern-bound extension of 2.2 km (1.4 mi) on the CN right-of-way to Clareview Station. In June 1983, the light rail tunnel downtown was extended by 0.8 km (0.50 mi) to Bay and Corona stations. TheD.L. MacDonald Yard, between Belvedere and Clareview, opened in December 1983 to store and service the vehicles. The line was extended in September 1989 by 0.8 km (0.50 mi) to Grandin station (now Government Centre station, close to theAlberta Legislature). On August 23, 1992, the next extension opened from Grandin to University Station, partially via the Dudley B. Menzies Bridge, crossing theNorth Saskatchewan River with a lower level for pedestrians and cyclists, and partially via a tunnel into the station. Major upgrades to the Belvedere and Clareview stations were made in 1998 and 2001 respectively.[13]

On January 1, 2006, the line was extended 0.6 km (0.37 mi) south through the University Campus to Health Sciences Station, which is located at street level. On April 25, 2009, McKernan/Belgravia and South Campus stations were opened as part of the south LRT expansion, with Southgate and Century Park opening on April 24, 2010. The first of the newSiemens SD-160 light rail vehicle train cars for the new extension were shipped by rail fromFlorin, California, on April 24, 2008, arriving in Edmonton on May 9, 2008 (37 vehicles in total).[82]

The LRT expansion was developed entirely at surface level with several underpasses after 2006, one at Belgravia Road and the other under111 Street south of 61 Avenue. A short busway has been constructed from the South Campus station[85] roughly parallel to Belgravia Road in conjunction with the South LRT expansion.

Metro Line

[edit]

On April 27, 2007, the city began detailed planning of a new LRT line that would run north from Churchill Station, to theNorthern Alberta Institute of Technology (NAIT), and eventually beyond to north-end neighbourhoods with a terminal station south ofSt. Albert.

Kingsway/Royal Alex station construction in August 2013

The Metro line branches off the Capital Line at Churchill Station, runs west along 105 Avenue to theMacEwan University City Centre Campus, then north along105 Street,Kingsway (Avenue), and 106 Street, toKingsway Mall and NAIT.

In April 2008,Edmonton City Council approved $45 million in funding to build a tunnel under theEpcor Tower site immediately, while it was still under construction, with the aim of saving $140 million more than would have been required to dig under the tower once it was completed. This step was taken even though the rest of the project had not yet been approved, because of the time constraint posed by the construction of the new tower.[86] Construction on the tunnel began in August 2009 and was completed by approximately September 2010.[87]

On July 2, 2009, the federal and provincial governments approved the reallocation of funding from the proposed Gorman Station extension to the Metro line as the city felt that NAIT was a higher priority.[88]

The expansion added three stations to the system;MacEwan station atMacEwan University,Kingsway/Royal Alex station nearKingsway Mall and theRoyal Alexandra Hospital, andNAIT station at theNorthern Alberta Institute of Technology. MacEwan Station is located just east of the downtown MacEwan University campus, and west of theproposed downtown hockey arena, at 104 Street and 105 Avenue. The Kingsway/Royal Alex Station is located on the north side of Kingsway, to the south of the hospital. As part of the plan, the Kingsway Transit Centre was relocated to the southeast corner of111 Avenue and 106 Street, to provide service to both Kingsway Mall and the LRT station.[84] The temporary NAIT station was located north ofPrincess Elizabeth Avenue, on the south side of NAIT's swimming pool and hockey arena.[87][89][90][91]

The Metro Line was completed at a cost $90 million under its estimated $755 million budget, with a total project cost of $665 million.[92]

In December 2023, Phase 1 of the Metro Line Northwest Expansion was completed, including two new stations:Blatchford Gate station in the northern area ofBlatchford, andNAIT/Blatchford Market Station located roughly 300 meters from the temporary station. On January 20, 2024, service commenced to the NAIT/Blatchford Market, and the temporary NAIT station was permanently closed.[93] Blatchford Gate station is currently not open for passenger service as it does not currently meet city transit service standards. Construction on the extension began in Summer 2020, and was completed on budget and ahead of schedule, as the extension was originally anticipated to be completed in 2025.[94][95][93]

Valley Line

[edit]
Davies Station in October 2020

In December 2009, the city council approved a new low-floor train route that would leave a new ground-level station atChurchill Square on 102 Avenue between 100 and 99 Streets before stopping inThe Quarters redevelopment on 102 Avenue between 97 Street and 96 Street. From here the route enters a tunnel and travels beneath 95 Street descending into theriver valley to cross the North Saskatchewan River on the newTawatinâ Bridge,[96] east ofLouise McKinney Park. The route then proceeds to climb the hill adjacent to Connors Road then proceeds east along 95 Avenue and southbound at 85 Street. The route will travel southbound along 85 Street crossing the traffic circle and shifting to 83 Street, continuing south and east towards Wagner Road. Finally the line will proceed south along 75/66 Street until it reaches Mill Woods Town Centre. Within this line the proposed stations are: Quarters, Muttart, Strathearn, Holyrood, Bonnie Doon, Avonmore, Davies (to include a bus terminal and park & ride),[97] Millbourne/Woodvale, Grey Nuns, and Mill Woods Town Centre. The maintenance and storage of vehicles for the line will be at the new Gerry Wright Operations and Maintenance Facility, atWhitemud Drive and 75 Street.[98]

On February 15, 2012, city council approved the Downtown LRT concept plan. The Downtown LRT Project became part of the Southeast to West LRT project.[99] The city hoped to have money in place by the end of 2013 for the $1.8-billion LRT line from downtown to Mill Woods to start construction in 2016. City council committed $800 million, the federal government invested $250 million, and $235 million would come from the provincial government, leaving a $515 million funding gap delaying the project.[100] On March 11, 2014, it was announced that the project would be completely funded[101][102] with an additional $150 million from the federal government and $365 million from the provincial government.[103][104]

Signalling system

[edit]

TheMetro Line and theCapital Line usefixed block signalling. The new Metro Line was originally built to use only CBTC,[105] but was converted to the fixed block system after the City firedThales,[106] the contractor originally chosen to install the CBTC system. The Metro Line's fixed block system was provided by Alstom.[107][108] The fixed-block system became active in March 2021, allowing trains to run at full speed along the metro line track for the first time since the line opened.[109] The city claims that frequencies in the downtown core will reach 2.5 minutes with the fixed-block system, but the current schedule is for 5-minute headways.[110]

The signalling system divides the track into sections called blocks protected by signals that maintain at least one empty fixed block between trains. The CBTC system was supposed to use computer control to maintain a fixed distance of empty space (a moving block) between trains. This would have allowed trains to operate closer together, which increases the frequency of trains arriving at stations and increases an LRT system's overall capacity for ridership.[105]

The CBTC uses computers on trains that report into a central controller to pinpoint the exact location of each train and constantly adjust the speed, spacing and routing of trains to keep trains safe and on schedule. It safely tightens up the spacing between trains so that Metro Line and Capital Line trains can share the same tracks betweenHealth Sciences/Jubilee station andChurchill station. Edmonton Transit runs peak-time trains every 5 minutes through downtown, but this frequency could have been increased to every 2.5 minutes when the Metro Line originally intended to be operational.[105] This goal was abandoned by the city after August 2021, having restored 5 minute frequency on the Capital Line. The Metro Line continues to operate on a 15-minute frequency.[111]

References

[edit]
  1. ^"Transit Ridership Report Second Quarter 2025"(PDF).American Public Transportation Association. August 27, 2025. RetrievedAugust 29, 2025.
  2. ^"Transit Ridership Report Fourth Quarter 2024"(PDF).American Public Transportation Association. February 19, 2025. RetrievedFebruary 25, 2025.
  3. ^abcde"The Way We Move LRT for Everyone"(PDF). Edmonton Transit Service and City of Edmonton. pp. 4–5. Archived fromthe original(PDF) on September 10, 2015. RetrievedSeptember 8, 2015.
  4. ^ab"Metro Line (North LRT to NAIT)". City of Edmonton. September 7, 2015. Archived fromthe original on September 7, 2015. RetrievedSeptember 8, 2015.
  5. ^"Edmonton Datasheet - SD160 Light Rail Vehicle"(PDF). Siemens. Archived fromthe original(PDF) on October 26, 2010. RetrievedMarch 9, 2011.
  6. ^Kent, Gordon (February 11, 2016)."'There's no hidden surprises,' city says, as it signs contract for Edmonton Valley Line LRT".Edmonton Journal. Postmedia Network. RetrievedFebruary 13, 2016.
  7. ^"Bechtel Team Awarded Edmonton Valley Line Light Rail Project in Canada". Bechtel. February 11, 2016. RetrievedFebruary 13, 2016.
  8. ^"City of Edmonton selects Marigold Infrastructure Partners for Valley Line West LRT project".
  9. ^abcdeMacDonald, D.L.; Bakker, J.J. (1978)."Edmonton's Northeast Light-Rail Rapid Transit Line"(PDF).Transportation Research Board:23–27.
  10. ^abcdBakker, J.J. (1981)."Edmonton's Light Rail Transit from Concept to Operations"(PDF).Transportation Research Board:7–12.
  11. ^"History of ETS".City of Edmonton. June 2016. Archived fromthe original on June 1, 2013. RetrievedJuly 11, 2013.
  12. ^"LRT Brochure"(PDF). November 15, 2004. Archived fromthe original(PDF) on January 4, 2007. RetrievedDecember 2, 2011.
  13. ^abcdefColin Hatcher (2003).Edmonton's Light Rail Transit – The First 25 Years.Edmonton Transit Service.
  14. ^"Why Are Canadian Construction Costs So High?". July 4, 2018.
  15. ^Tingley, Kenneth W. (2011).Ride of the Century: The Story of the Edmonton Transit Service. City of Edmonton. p. 239.ISBN 978-0-9809275-0-4.
  16. ^"2018 LRT Passenger Count Report"(PDF).City of Edmonton. March 2019. Archived fromthe original(PDF) on May 31, 2019. RetrievedMay 31, 2019.
  17. ^"2016 LRT Passenger Count Report"(PDF).City of Edmonton. Edmonton Transit Service. December 2016.Archived(PDF) from the original on October 23, 2017. RetrievedJune 24, 2018.
  18. ^"Dudley Menzies Bridge - Light Rail Transit Bridge Over The North Saskatchewan River". PCL. 2005. Archived fromthe original on July 16, 2011. RetrievedApril 24, 2010.
  19. ^City of Edmonton."Help Name Edmonton's LRT Lines". Archived fromthe original on October 7, 2012. RetrievedJune 25, 2012.
  20. ^"City names LRT lines, grumbling follows". Archived fromthe original on February 3, 2013.
  21. ^"Approved LRT Line Names"(PDF). City of Edmonton. Archived fromthe original(PDF) on September 4, 2013. RetrievedJanuary 31, 2013.
  22. ^MacDonald, D. L.; Bakker, J. J. (1978)."Edmonton's Northeast Light-Rail Rapid Transit Line". Special Report No. 182, Light Rail Transit: Planning and Technology (Report). Transportation Research Board. RetrievedJune 3, 2019.
  23. ^McLachlan, Larry (November 1995).Edmonton Light Rail Transit Experience(PDF). Seventh National Conference on Light Rail Transit. Baltimore, Maryland: Transportation Research Board. RetrievedJune 3, 2019.
  24. ^abc"Annual Review of 2010-2013 Council Initiatives Status Update"(PDF). City of Edmonton. July 4, 2012. Archived fromthe original(PDF) on November 1, 2013. RetrievedOctober 30, 2013.
  25. ^ab"New LRT Cars Start in Regular Service". City of Edmonton. January 26, 2009. Archived fromthe original on November 22, 2010. RetrievedApril 24, 2010.
  26. ^"SD160 Light Rail Vehicle: Edmonton, Canada"(PDF). Siemens Transportation Systems. May 2007. RetrievedJune 6, 2019.
  27. ^"Sleek, modern and ready for riders: First Light Rail Transit vehicle unveiled in Edmonton" (Press release). Siemens. June 27, 2008. RetrievedJune 6, 2019.
  28. ^"First Flexity low-floor in Edmonton".Railway Age. August 10, 2018. RetrievedJune 3, 2019.
  29. ^Stolte, Elise (July 10, 2017)."Bombardier tour to reassure Edmonton train commitments on track".Edmonton Journal. RetrievedJune 3, 2019.
  30. ^abCook, Dustin (November 10, 2021)."City of Edmonton selects Hyundai Rotem Company to provide 40 light-rail vehicles for Valley Line West LRT".Edmonton Journal. RetrievedNovember 10, 2021.
  31. ^Amato, Angela (August 6, 2025)."First Valley Line West Light Rail Vehicle arrives in Edmonton".CFRN-DT. RetrievedSeptember 6, 2025.
  32. ^Ho, Clara (July 9, 2010)."City transportation wants more LRT cars". Edmonton Sun. RetrievedOctober 30, 2013.
  33. ^"More dollars coming for LRT". CBC News. February 8, 2011. RetrievedOctober 30, 2013.
  34. ^"LRT Design Guideline For ETS Edmonton Transit Service"(PDF). City of Edmonton. 2011. Archived fromthe original(PDF) on June 1, 2012. RetrievedAugust 28, 2014.
  35. ^"Bombardier Wins Order to Supply Light Rail Transit System for City of Edmonton's Valley Line in Canada".Bombardier Transportation (Press release). February 12, 2016. RetrievedSeptember 13, 2017.
  36. ^"Safety and Security". City of Edmonton. Archived fromthe original on March 25, 2014. RetrievedFebruary 20, 2014.
  37. ^abcDrake, Laura; Warnica, Richard; Sumamo, Yonathan (May 23, 2010)."Woman's murder rattles LRT riders".Edmonton Journal. Canada.com. Archived fromthe original on February 25, 2014. RetrievedFebruary 20, 2014.
  38. ^"Man dies after beating on Edmonton transit train". CBC News. December 31, 2012. RetrievedFebruary 20, 2014.
  39. ^"Man Thrown On LRT Tracks, Not Allowed To Escape".HuffPost. December 3, 2012. RetrievedNovember 7, 2023.
  40. ^Parsons, Page (September 18, 2018)."'Plunged a knife a couple times': Witnesses treat stabbing victim at South Campus LRT station platform".Edmonton Journal. Postmedia. RetrievedSeptember 18, 2018.
  41. ^Lachacz, Adam (April 25, 2021)."Man arrested following stabbing at University LRT station".Edmonton. RetrievedApril 27, 2021.
  42. ^"Violent assault at LRT station: man pushed elderly woman onto tracks". April 26, 2022. RetrievedApril 28, 2022.
  43. ^"Fatal officer-involved shooting under investigation near central Edmonton LRT crossing - Edmonton | Globalnews.ca".Global News. RetrievedJune 30, 2022.
  44. ^"Man killed at Belvedere station identified as 52-year-old husband, father of 7 - Edmonton | Globalnews.ca".Global News. RetrievedJuly 26, 2023.
  45. ^"Woman, 55, beaten into a coma at Coliseum LRT platform in central Edmonton - Edmonton | Globalnews.ca".Global News. RetrievedDecember 4, 2023.
  46. ^"Man known to Edmonton police charged after 2 stabbed at Belvedere LRT Station - Edmonton | Globalnews.ca".Global News. RetrievedMarch 8, 2024.
  47. ^"Boy fatally stabbed at MacEwan LRT station was in group that attacked 2 others: EPS - Edmonton | Globalnews.ca".Global News. RetrievedFebruary 8, 2025.
  48. ^Edmonton, City of (April 27, 2021)."Fares".www.edmonton.ca. RetrievedApril 27, 2021.
  49. ^ab"Fares and Passes | City of Edmonton".www.edmonton.ca. RetrievedDecember 26, 2023.
  50. ^"How to Use Arc".MyArc.ca. RetrievedDecember 26, 2023.
  51. ^"Transfer Policy". City of Edmonton. 2010. Archived fromthe original on June 16, 2011. RetrievedOctober 20, 2010.
  52. ^"Edmonton university students say yes to U-Pass". CBC News. March 9, 2007. Archived fromthe original on March 14, 2007. RetrievedOctober 20, 2010.
  53. ^Edmonton Journal (March 27, 2007)."MacEwan students approve transit pass". Canada.com. Archived fromthe original on January 16, 2016. RetrievedOctober 20, 2010.
  54. ^Jarvis, Kristina (March 27, 2010)."NAIT students approve U-Pass". St. Albert Gazette. Archived fromthe original on July 23, 2011. RetrievedOctober 20, 2010.
  55. ^"10-Year Capital Investment Agenda 2012-2021"(PDF).City of Edmonton. June 18, 2012. Archived fromthe original(PDF) on September 4, 2013. RetrievedNovember 20, 2012.
  56. ^"City Council Minutes".City of Edmonton. June 1, 2011. Archived fromthe original on May 8, 2012. RetrievedMay 27, 2012.
  57. ^ab"Northwest LRT to City Limits". The City of Edmonton. Archived fromthe original on September 3, 2013. RetrievedAugust 20, 2013.
  58. ^"Valley Line – West". City of Edmonton. RetrievedMay 23, 2019.
  59. ^"Valley Line - West".Valley Line - West. City of Edmonton. RetrievedNovember 17, 2021.
  60. ^"Alberta government pledges $1 billion for Edmonton's Valley Line West LRT project".The Star Edmonton. November 1, 2018.
  61. ^"Capital Line – South". City of Edmonton. RetrievedAugust 4, 2025.
  62. ^ab"Edmonton celebrates one year of construction on LRT Extension".Renew Canada. June 2, 2025.Archived from the original on June 3, 2025. RetrievedAugust 4, 2025.
  63. ^"Capital Line – Northeast". City of Edmonton. RetrievedMay 23, 2019.
  64. ^ab"St. Alberta LRT"(PDF). City of St. Albert. February 23, 2013. Archived fromthe original(PDF) on May 20, 2013. RetrievedSeptember 10, 2013.
  65. ^"Construction Notice - Capital Line South LRT 23 Avenue at 111 Street and 109 Street"(PDF). City of Edmonton.Archived(PDF) from the original on May 12, 2023. RetrievedMay 11, 2023.
  66. ^Ho, Clara (May 19, 2010)."City announces planned LRT route to St. Albert". Edmonton Sun. RetrievedOctober 20, 2010.
  67. ^"Metro Line Northwest History | City of Edmonton".www.edmonton.ca. RetrievedJanuary 20, 2024.
  68. ^"Edmonton's Valley Line Southeast LRT opened on Nov. 4".CBC. October 24, 2023. RetrievedOctober 24, 2023.
  69. ^Kent, Gordon (September 3, 2009)."Edmonton unveils west and south LRT plans". Archived fromthe original on November 7, 2009. RetrievedDecember 2, 2011.
  70. ^"City Proposes Southeast and West LRT Routes". September 3, 2009. Archived fromthe original on June 16, 2011. RetrievedDecember 2, 2011.
  71. ^Clancy, Clare (November 1, 2018)."Alberta commits $1.04 billion to Edmonton's west Valley Line LRT expansion".Edmonton Journal. RetrievedNovember 2, 2018.
  72. ^"Edmonton approves Chinatown route for LRT". Cbcnews.ca. February 15, 2012. RetrievedFebruary 15, 2012.
  73. ^Ramsay, Caley (May 25, 2014)."City prepares for major changes to popular River Valley trails, footbridge".Global News. RetrievedMay 11, 2016.
  74. ^Hampshire, Gareth (April 22, 2016)."Group wants river valley protected against LRT development".CBC News. RetrievedMay 11, 2016.
  75. ^"West LRT opposition heats up". Edmonton Journal. April 12, 2008. Archived fromthe original on July 10, 2009. RetrievedApril 24, 2010.
  76. ^"Mandel slams city staff over LRT route". Edmonton Journal. April 30, 2008. Archived fromthe original on July 10, 2009. RetrievedApril 24, 2010.
  77. ^"Residents fume over LRT's 'path of destruction'". Edmonton Journal. May 15, 2008. Archived fromthe original on May 11, 2011. RetrievedApril 24, 2010.
  78. ^Jordan Schroder (June 26, 2008)."No, No, No: The LRT Needs To Go Here!". See Magazine. Archived fromthe original on May 26, 2011.
  79. ^"Sparks fly as councillors delay LRT hearing". Edmonton Journal. May 6, 2009. Archived fromthe original on July 10, 2009. RetrievedApril 24, 2010.
  80. ^Querengesser, Tim (December 15, 2015)."Edmonton's Metro Line LRT still a troubled machine: Report".Metro News Edmonton. Archived fromthe original on March 13, 2018. RetrievedMay 11, 2016.
  81. ^Theobald, Claire (February 19, 2017)."Step on it: Metro Line finally starts operating at full speed".Edmonton Sun. RetrievedFebruary 24, 2017.
  82. ^ab"LRT Vehicle Arrival and Unveiling". City of Edmonton. May 2008. Archived fromthe original on June 16, 2011. RetrievedApril 24, 2010.
  83. ^"South LRT Fact Sheet"(PDF). City of Edmonton. 2010. Archived fromthe original(PDF) on September 24, 2015. RetrievedOctober 10, 2014.
  84. ^ab"North LRT Stations". City of Edmonton. 2010. Archived fromthe original on June 16, 2011. RetrievedOctober 20, 2010.
  85. ^"South LRT Extension". City of Edmonton. 2009. Archived fromthe original on June 16, 2011. RetrievedApril 26, 2009.
  86. ^"LRT line likely to go under Epcor". Edmonton Journal. April 9, 2008. Archived fromthe original on October 5, 2008. RetrievedApril 12, 2008.
  87. ^ab"Summer 2010 North LRT Newsletter"(PDF). 2010. Archived fromthe original(PDF) on June 16, 2011. RetrievedDecember 2, 2011.
  88. ^"Alberta surges ahead with climate change action plan". Government of Alberta. July 8, 2008. Archived fromthe original on July 16, 2011. RetrievedApril 24, 2010.
  89. ^"North LRT Making Tracks Fall 2009"(PDF). City of Edmonton. October 2009. RetrievedDecember 23, 2009.[dead link]
  90. ^Leduc County Growth Study (October 2008)."Section Five"(PDF).Recommended Growth Strategy. Leduc County. Archived fromthe original(PDF) on July 13, 2011. RetrievedJanuary 14, 2011.
  91. ^Mackenzie Sinclair (May 21, 2009)."Lovin' The LRT". See Magazine. Archived fromthe original on May 26, 2011.
  92. ^Tumilty, Ryan (April 10, 2014)."NAIT LRT Line comes in $90 million under budget, money could be moved to south east".Metro News. Archived fromthe original on May 3, 2015. RetrievedApril 23, 2015.
  93. ^abSiemens, Nicole (January 16, 2024)."New NAIT LRT station ahead of schedule, opening of other Blatchford stop remains unclear".Global News.Corus Entertainment. RetrievedJanuary 20, 2024.
  94. ^"New NAIT LRT station ahead of schedule, opening of other Blatchford stop remains unclear - Edmonton | Globalnews.ca".Global News. RetrievedJanuary 20, 2024.
  95. ^Fortner, Cole (January 17, 2024)."New NAIT/Blatchford Market LRT station to open ahead of schedule".CityNews Edmonton. RetrievedJanuary 20, 2024.
  96. ^"Southeast LRT (Valley Line) Names Approved". City of Edmonton Naming Committee. Archived fromthe original on November 14, 2013. RetrievedNovember 14, 2013.
  97. ^"Southeast to West LRT - Approved Concept Plan Amendment"(PDF). City of Edmonton. Archived fromthe original(PDF) on September 4, 2013. RetrievedNovember 19, 2012.
  98. ^"Operations and Maintenance Facility"(PDF). City of Edmonton. Archived fromthe original(PDF) on March 26, 2014. RetrievedAugust 28, 2014.
  99. ^"Southeast to West LRT: Mill Woods to Lewis Farms". City of Edmonton. Archived fromthe original on May 8, 2012. RetrievedMay 27, 2012.
  100. ^Dykstra, Matt (November 13, 2013)."Federal government projects a $3.7 billion budget surplus which could help Edmonton LRT line". Edmonton Sun. RetrievedNovember 14, 2013.
  101. ^Tumilty, Ryan (March 11, 2014)."Southeast LRT funding includes $200 million interest-free provincial loan". Metro News. Archived fromthe original on January 23, 2015. RetrievedMarch 12, 2014.
  102. ^Kent, Gordon (March 11, 2014)."Southeast LRT on track after province promises to fill $600 million funding gap (with video)". Edmonton Journal. Archived fromthe original on April 18, 2014. RetrievedMarch 12, 2014.
  103. ^Simons, Paula (May 26, 2014)."Cash for Valley Line is fine, but transit funding must be consistent". Edmonton Journal. Archived fromthe original on June 20, 2014. RetrievedMay 27, 2014.
  104. ^Dykstra, Matthew (May 26, 2014)."Edmonton gets a final piece of funding for southeast portio of Valley LRT line". Edmonton Sun. RetrievedMay 27, 2014.
  105. ^abc"Metro Line: Delay FAQ"(PDF). City of Edmonton. May 4, 2015. Archived fromthe original(PDF) on June 30, 2015. RetrievedJune 27, 2015.The City is replacing this traditional fixed block system with a modern CBTC (moving block) system
  106. ^"Edmonton fires Thales over faulty LRT signal system - constructconnect.com".Journal Of Commerce. April 15, 2019. RetrievedOctober 5, 2021.
  107. ^"New signalling system to be installed on Metro Line LRT, seven months after terminating Thales contract".edmontonjournal. RetrievedOctober 5, 2021.
  108. ^Edmonton, City of (November 7, 2019)."Metro Line Update: new signalling system taking shape".Transforming Edmonton. RetrievedOctober 5, 2021.
  109. ^"Edmonton's Metro Line LRT no longer running on Thales signalling system".GlobalNews. RetrievedDecember 23, 2021.
  110. ^"Fall ETS adjustments: LRT welcomes bikes at all times and four other changes".CTVnewsEdmonton. August 19, 2021. RetrievedDecember 23, 2021.
  111. ^"Back on track: Five-minute train frequency to be fully restored on Edmonton's Capital Line LRT after seven-year signalling issue".edmontonjournal. RetrievedOctober 5, 2021.

External links

[edit]
Wikimedia Commons has media related toEdmonton Light Rail Transit.
Template:Attached KML/Edmonton LRT
KML is not from Wikidata
Edmonton LRT stations
Capital Line
Metro Line
Valley Line
Features
History
Geography
Economy
Politics
Public services
Education
Culture
Transportation and
infrastructure
Intercity
Sightseeing
Commuter rail
Urban rail
Under construction
Planned
Cancelled or closed
Streetcar
Railbus
People mover
Heritage tramways
See also