Eastridge Transit Center | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
Eastridge Transit Center, July 2008 | |||||||||||
| General information | |||||||||||
| Location | Capitol Expressway San Jose, California | ||||||||||
| Coordinates | 37°19′41″N121°48′39″W / 37.327922°N 121.810935°W /37.327922; -121.810935 | ||||||||||
| Bus routes | |||||||||||
| Construction | |||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Website | Eastridge Transit Center | ||||||||||
| History | |||||||||||
| Opening | 2029 (light rail) | ||||||||||
| Rebuilt | 2015[1] | ||||||||||
| Future service | |||||||||||
| |||||||||||
| |||||||||||
TheEastridge Transit Center is aSanta Clara Valley Transportation Authority (VTA) bus terminal located at theEastridge Mall in theEvergreen District ofSan Jose, California. The station is located alongsideCapitol Expressway near Tully Road.
The following bus routes serve Eastridge:
TheVTA light railOrange Line is planned to be extended to Eastridge from its current terminus at theAlum Rock Transit Center, as part of theEastridge to BART Regional Connector Project.[3] This new extension would offer rail connection to theMilpitas Transit Center and theMountain View Transit Center, providing access toBay Area Rapid Transit (BART) andCaltrain. A groundbreaking was held on June 8, 2024. Construction is expected to be completed in 2028 with revenue service beginning in 2029.[1][4]