Eastern Siberia–Pacific Ocean oil pipeline

From Wikipedia, the free encyclopedia
Oil pipeline
Location
CountryRussia
General directionWest–East
FromTaishet
Passes throughKazachinskoye
Skovorodino
ToKozmino
Daqing (China)
Runs alongsideYakutia–Khabarovsk–Vladivostok gas pipeline
General information
TypeOil pipeline
OperatorTransneft
Commissioned2009 (Phase 1)
2012 (Phase 2)[1]
Technical information
Length4,857 km (3,018 mi)
Maximum discharge1,600,000 barrels per day (~8.0×10^7 t/a)

TheEastern Siberia–Pacific Ocean oil pipeline (ESPO pipeline orESPOOP,Russian:Нефтепровод "Восточная Сибирь - Тихий океан" (ВСТО)) is a pipeline system for exportingRussiancrude oil to theAsia-Pacific markets (Japan,China andKorea). The pipeline is built and operated by Russian pipeline companyTransneft.

History

[edit]

The first discussions of launching the ESPO pipeline started in the 1970s. Later, in 1996, on the initiative of the Russian president, Boris Yeltsin, Russia and China signed an energy agreement including plans for the ESPO pipeline.[2] The original project of this pipeline was proposed by the Russian oil companyYukos in 2001 as an independent oil pipeline. The project involved the building of a pipeline fromAngarsk, where Yukos operated a refinery, toDaqing in northern China.[3] At the same time, Transneft proposed an alternative project to pipe oil fromTaishet inIrkutsk Oblast to the Far East portKozmino nearNakhodka.[4] In May 2003, the Russian Government decided to combine these projects and that Transneft would be in charge of the pipeline, while Yukos would supply the oil.[5] On 29 May 2003, Russia and China signed an agreement on construction of the pipeline.[4] On 31 December 2004, the Russian government approved the construction of the pipeline from Taishet in East Siberia toPerevoznaya,Primorsky Krai, in the Pacific region.[6]

Construction of the pipeline started in April 2006.[7] On 4 October 2008, the section between Taishet and Talakan was launched in a reverse to pump oil fromSurgutneftegas-owned Alinsky deposit.[8] The first stage of the pipeline was completely laid in May 2009 and the whole first stage was reversed in December 2009. The terminal at Kozmino was inaugurated by Russian prime minister Vladimir Putin on 28 December 2009.[9]

Construction of the second stage from Skovorodino to the Pacific Ocean started after launch of the first stage.[10] In meantime, oil was transported from Skovorodino to Kozmino by railway.[11] The second stage was inaugurated on 25 December 2012.[1]

China branch

[edit]
Dmitry Medvedev andHu Jintao

In June 2009, Russia and China signed a deal to build the spur pipeline to China by which Russia supplies China with 15 million tonnes of oil (300,000 barrels per day (48,000 m3/d)) each year for 20 years in exchange for a loan worth US$25 billion to Russian companies Transneft andRosneft for pipeline and oil fields development.[12] Construction of the spur to China started in the Russian territory on 27 April 2008 and in Chinese territory on 18 May 2009.[10][13] The 64 kilometres (40 mi) long section from Skovorodino to theAmur River on Russia-China border was built by Transneft and the 992 kilometres (616 mi) long section from Russia-China border to Daqing was built by theChina National Petroleum Corporation (CNPC).[10] It was completed in September 2010.[14] On 1 January 2011, Russia said it had begun scheduled oil shipments to China.[15]

Route

[edit]

The 4,857-kilometre (3,018 mi) pipeline is being laid by the route of Taishet-Kazachinskoye-Skovorodino-Kozmino.[16] Because of protests of environmental organizations, the initial pipeline route was moved 40 kilometres (25 mi) north ofLake Baikal. Instead of going throughBuryatia, it was built throughSakha Republic.[citation needed] The 2,757-kilometre (1,713 mi) long first stage runs from Taishet to Skovorodino and the 2,100-kilometre (1,300 mi) long second stage will run from Skovorodino to Kozmino.[16] From Skovorodino the branch pipeline would extend throughMohe to Daqing, China.[17] The 64 kilometres (40 mi) long section runs from Skovorodino to theAmur River on Russia-China border and the 992 kilometres (616 mi) long section runs from Russia-China border to Daqing.

There is a plan to lay a parallelYakutia–Khabarovsk–Vladivostok gas pipeline alongside the oil pipeline.[18][19]

Technical features

[edit]

The initial capacity of the 122-centimetre (48 in) pipeline is 600,000 barrels per day (~3.0×10^7 t/a). By 2016 the capacity of the pipeline will be increased up to 1,000,000 barrels per day (~5.0×10^7 t/a) and by 2025 up to 1,600,000 barrels per day (~8.0×10^7 t/a). The capacity of the link to China is 600,000 barrels per day (~3.0×10^7 t/a) and its section in the Russian territory cost US$600 million.[20]

The pipeline consist of 32 pumping stations, including 13 with tank farms with a total capacity of 2.67 million cubic metres (94×10^6 cu ft). For feeding pumping stations with electricity, a 35 MW power station was built near the town ofOlyokminsk in theSakha Republic. It is fired by the crude oil from the ESPO pipeline. The power station is designed for independent operation in demanding Arctic temperature conditions.[21] The terminal at Kozmino has a tank farm with a capacity of 350,000 cubic metres (12,000,000 cu ft). The loading capacity of the terminal is 300,000 barrels per day (~1.5×10^7 t/a).[20][22]

The first stage was built by Systema SpecStroy, Krasnodarstroytransgaz, Vostok Story, Promstroy, Amerco Int. and IP Set Spb. [sic][23][24] Five 16V32 crude oil-fired engines for the pipeline-related power station were delivered in summer 2008 byWärtsilä.[21] The first stage of the pipeline cost US$12.27 billion and the export terminal cost $1.74 billion.[23]

Resource base

[edit]

The pipeline is supplied from the oil fields ofTomsk Oblast and theKhanty–Mansi Autonomous Okrug in Western Siberia along the existingOmsk–Irkutsk pipeline that joins the ESPO pipeline in Taishet, as well as oil provinces of Eastern Siberia. At the initial stage 22 million tons of oil is supplied by Rosneft and 8 million tons by Surgutneftegas.

Controversies

[edit]

Embezzlement allegations

[edit]

In November 2010, one of the minor shareholders of Transneft,Alexei Navalny, accused the company management of engaging in a US$4 billion embezzlement during the construction of the pipeline.[25] These accusations were denied byNikolay Tokarev, head of Transneft.[25]

Dispute with CNPC

[edit]

In 2011, a dispute rose over payments for oil delivery through the pipeline. While Transneft has charged CNPC with violating their supply contract, CNPC is not acknowledging these claims. The contract stipulate the monthly volumes of oil according to the agreed price formula, which is less than the spot price of oil.[26][27]

See also

[edit]
Portals:

References

[edit]
  1. ^ab"Russia Launches Second Leg of Pacific Oil Pipeline".RIA Novosti. 2012-12-25. Retrieved2014-03-29.
  2. ^Did China Bankroll Russia’s Annexation of Crimea? The Role of Sino-Russian Energy Relations.In Russia's Turn to the East (pp. 95-118)., Palgrave Pivot, Cham.
  3. ^Helmer, John (2005-04-29)."China beats Japan in Russian pipeline race".Asia Times. Archived from the original on 2005-04-29. Retrieved2008-11-29.
  4. ^ab"China, Russia sign oil pipeline agreement".China Daily. 2003-05-29. Retrieved2008-11-29.
  5. ^Helmer, John (2008-11-01)."China ties up Russia's crude - again".Asia Times. Archived from the original on 2008-12-04. Retrieved2008-11-29.
  6. ^"Russia approves Pacific pipeline".BBC News. 2004-12-31. Retrieved2011-07-06.
  7. ^"Transneft Sets to Eastern Siberia-Pacific Ocean Oil Pipeline".Kommersant. 2006-04-18. Retrieved2008-11-29.
  8. ^Blagov, Sergei (2008-10-22)."Russia sees eastern pipeline as a "major victory"".Eurasia Daily Monitor.The Heritage Foundation. Retrieved2008-11-29.
  9. ^Bryanski, Gleb (2009-12-28)."Russia's Putin launches new Pacific oil terminal".Reuters. Archived fromthe original on July 18, 2012. Retrieved2009-12-28.
  10. ^abcWatkins, Eric (2009-05-05)."China to begin construction of 992-km ESPO 'extension'".Oil & Gas Journal. Vol. 107.PennWell Corporation. Retrieved2009-05-16.
  11. ^Watkins, Eric (2009-02-17)."China, Russia agree on loans for ESPO pipeline spur".Oil & Gas Journal. Vol. 107, no. 41.PennWell Corporation. Retrieved2009-05-16.
  12. ^Kim, Lucian (2009-02-17)."Russia Agrees to $25 Billion Oil-for-Loans Deal With China".Bloomberg. Retrieved2009-02-17.
  13. ^"Chinese Envoy to Russia: Oil Pipeline Serves Strategic Goals of Both Sides".BBC Monitoring. Downstream Today. 2009-05-11. Retrieved2009-05-16.
  14. ^Page, Jeremy (2010-09-26)."Russian Oil Route Will Open to China".The Wall Street Journal. Retrieved2010-09-28.
  15. ^Soldatkin, Vladimir (2011-01-01)."Russia in milestone oil pipeline supply to China".Reuters. Retrieved2011-07-06.
  16. ^ab"Transneft ready to bring ESPO Pipeline section online".Pipelines International. Scientific Surveys, Great Southern Press. 2009-12-22. Retrieved2009-12-28.
  17. ^"Russia-China pipeline progressing".Upstream Online. NHST Media Group. 2007-06-15. Retrieved2007-12-08.
  18. ^Watkins, Eric (2009-01-29)."Putin says ESPO may have parallel gas line".Oil & Gas Journal. Vol. 107, no. 6.PennWell Corporation. Retrieved2009-05-16.
  19. ^"Russia's Gazprom mulls new liquefaction plant in country's Far East".Platts. 2008-06-24. Retrieved2008-08-02.
  20. ^abTrevethan, Catherine."Eastern Siberia – Pacific Ocean (ESPO) Pipeline".Reuters. Archived fromthe original(GIF) on 2010-02-20. Retrieved2009-12-28.
  21. ^ab"Wartsila Announces Major Contracts for 2007".Wärtsilä. Downstream Today. 2007-11-14. Retrieved2008-04-05.
  22. ^"Transneft to start oil terminal construction in Kozmino". Vladivostok News. 2008-02-28. Retrieved2008-06-08.
  23. ^abMosolova, Tanya (2007-12-27)."Russia delays Asian oil pipeline to Q3 2009".Reuters. Archived fromthe original on March 6, 2016. Retrieved2008-03-15.
  24. ^"Transneft cites Siberian-Pacific slow-down".Scandinavian Oil-Gas Magazine. 2007-11-22. Retrieved2007-11-25.
  25. ^abSoldatkin, Vladimir (2011-01-14)."Russia's Transneft denies $4 bln theft".Reuters. Archived fromthe original on February 4, 2017. Retrieved2011-07-06.
  26. ^Helmer, John (2011-05-05)."Russia, China clash over oil price, supply".Asia Times. Archived from the original on 2011-05-08. Retrieved2011-07-06.
  27. ^O'Cinneide, Eoin (2011-07-01)."Transneft: 'CNPC rift ongoing'".Upstream Online. NHST Media Group. Retrieved2011-07-06.

External links

[edit]
Pipeline systems ofRussia by year of launch
Natural gas pipelines
Petroleum (oil) pipelines
Other pipelines
Diplomatic posts
Diplomacy
Cooperation & Incidents