The line in 1837 | |
Sketch ofHibernia | |
| Overview | |
|---|---|
| Headquarters | Dublin |
| Dates of operation | 1834[a]–1856[b] |
| Successor | Dublin and Wicklow Railway(operator) |
| Technical | |
| Track gauge | 5 ft 3 in (1,600 mm) |
| Previous gauge | 4 ft 8+1⁄2 in (1,435 mm)standard gaugeAs built |
| Length | 8.41 miles (13.53 km) |
TheDublin and Kingstown Railway (D&KR), which opened in 1834, wasIreland's first passenger railway. It linkedWestland Row in Dublin withKingstown Harbour (Dún Laoghaire) inCounty Dublin.
The D&KR was also notable for a number of other achievements besides being Ireland's first passenger railway: it operated anatmospheric railway for ten years; claimed the first use of a passenger tank engine; was the world's firstcommuter railway[1] and was the first railway company to build its own locomotives.
On 30 June 1856 theDublin and Wicklow Railway (D&WR) took over operation of the line from the D&KR with the D&KR continuing to lease out the line.[2] The D&WR had formerly been known as the Waterford, Wicklow, Wexford and Dublin Railway (WWW&DR or 3WS). It changed its name to the Dublin Wicklow and Wexford Railway (DW&WR) in May 1860 and was ultimately renamed the Dublin and South Eastern Railway (D&SER) in 1907, a name which was retained until the amalgamation of the D&KR and D&SER with theGreat Southern Railways on 1 January 1925.[3] As of 1974, its independent existence of over 90 years by a railway company was only exceeded in the British Isles by theGreat Western Railway and theLondonderry and Lough Swilly Railway.[4]
| Dublin and Kingstown Railway Act 1831 | |
|---|---|
| Act of Parliament | |
| Long title | An Act for making and maintaining a Railroad from Westland Row in the City of Dublin to the Head of the Western Pier of the Royal Harbour of Kingstown in the County of Dublin, with Branches to communicate therewith. |
| Citation | 1 & 2 Will. 4. c. lxix |
| Dates | |
| Royal assent | 6 September 1831 |
| Text of statute as originally enacted | |
1817 had seen the beginning of the construction of a newharbour at Dunleary village that soon began to attract traffic due tosilting problems elsewhere aroundDublin Bay. The nameKingstown was adopted afterKing George IV departed from the harbour in 1821.[5] Proposals for canal or rail infrastructure links to Dublin were variously proposed through to the 1830s.James Pim took the initiative and commissioned a plan byAlexander Nimmo which was supported by other businessmen and presented as a petition to theHouse of Commons on 28 February 1831 for a rail line from nearTrinity College to the west pier at the Royal Harbour of Kingstown under a company to be known as the D&KR. A bill was presented and was progressing but was scuppered by aprorogation of parliament and an election. A fresh bill receivedroyal assent on 6 September 1831 as theDublin and Kingstown Railway Act 1831 (1 & 2 Will. 4. c. lxix).[6][7]
A meeting of D&KR subscribers on 25 November 1831 at theDublin Chamber of Commerce included the submission of a long report which indicated thatWestland Row was to be the Dublin terminus and that the enterprise was initially to focus on passenger traffic with a high train frequency.Thomas Pim was appointed chairman. A key appointment was James Pim (Junior) as secretary and Murray notes his "great natural ability, tact, energy, and a valuable business experience". James Pim was appointed Treasurer in May 1832 and effectively functioned as General Manager. The position of clerk/secretary was awarded toThomas Fleming Bergin who with his engineering background effectively controlled the operation of the railway.[8]
The construction contract was awarded toWilliam Dargan,[9] withCharles Blacker Vignoles as engineer.[10][c]


The line began at Westland Row where the D&KR made its headquarters and initially ran elevated reaching street level around theRiver Dodder.[citation needed] FromMerrion the line ran on an embankment built across the strand toBlackrock which later led to the formation ofBooterstown marsh.[11][12]
While rights for compulsory purchase were generally granted, this was not the case for two landowners who insisted on large cash compensations and in the case ofLord Cloncurry the building of a private footbridge over the line to a bathing area complete with a Romanesque temple, a short tunnel and a cutting to maintain his privacy.[13]
The construction contract was signed on 7 May 1833 and was completed in about 18 months. Thomas Grierson, the DW&WR chief engineer commented in a presentation to the Institution of Civil Engineers of Ireland in 1887 that speed of construction was remarkably short and led to "many failures in masonry, bridges, etc.".[14]
The railway proved expensive to build, the final cost being under a little under £60,000 per mile in total, Murray in 1938 commenting that this rate per mile was one of the highest ever.[15]
One of the earliest tests was with a horse pulling a single carriage carrying directors and friends on 31 July 1834; at that stage with only a single line laid throughout.[16] The D&KR claimed that trials expected in September were delayed due to the risks to labourers still working on the line.[17] The first recorded train with invited passengers on 4 October 1834 was hauled by the engineVauxhall and ran as far as the WilliamstownMartello Tower at what is nowBlackrock Park before returning.[16] The engineHibernia on 9 October 1834 hauled another train of invited passengers composed of eight carriages and in this case traversed the whole length of the line and back.[18] Plans were made to introduce a service on 22 October 1834 but storms and flooding damaged the line including wrecking the bridge over theRiver Dodder and this led to delays for repairs.[19]
Newspaper advertisements of an hourly service and fares for oneshilling, eight (old)pence and six pence for first, second and third class respectively indicated the service was to start on Wednesday 17 December 1834. At 9 o'clock on the appointed date the locomotiveHibernia departed with the first train of the day from Westland Row. Throughout the day a total of nine trains of between eight and nine carriages were run, all "full to overflowing", and with a total of almost 5,000 fare paying passengers conveyed.[20]
A timetabled regular service was introduced from January 1835.[21][d]
| Dublin and Kingstown Railway Act 1834 | |
|---|---|
| Act of Parliament | |
| Citation | 4 & 5 Will. 4. c. xxvii |
| Dates | |
| Royal assent | 22 May 1834 |
| Text of statute as originally enacted | |
When the plan was prepared for the original line, the D&KR expected that a new wharf was to be completed near their planned terminus at the West Pier at the old harbour. However, Liverpool and Holyhead packets had begun using a jetty at the East Pier, and the location of the new wharf was moved 0.5 mi (0.8 km) eastward to avail of the deeper water needed for steamships;[22] Victoria Wharf opened in 1837.[23] Thus the D&KR had a need, even as it was being built, to extend towards the East Pier and there were thoughts of extending to Dalkey and even to Bray. An 1833 bill to extend to Dalkey evoked strong opposition from many quarters including canal proponents and local property owners, withThomas Gresham making the strongest impact.[24] With the failure of the previous bill and following careful negotiations, Pim was able to present and get passed a new act of Parliament, theDublin and Kingstown Railway Act 1834 (4 & 5 Will. 4. c. xxvii), in May 1834 for an extension to Kingstown only.[25] This cut across and isolated a good section of the Old Harbour, ran also beside the existingDalkey Quarry tramway and also required demolition of aMartello tower and battery in May 1835 before Dargan started work on the extension in May 1836.[26] The line extension toDún Laoghaire station's current location was announced complete on 13 May 1837, and a directors' special train ran in 13 minutes from Westland Row on that date.[27]
With the substantial construction of most of the pier at Kingstown complete by 1836, the D&KR made an unsuccessful attempt in 1838 to apply to use one track of the Kingstown to Dalkey Quarry stone tramway for horse-drawn trams to Dalkey. In 1842 James Pim observed theSamudas and Clegg demonstration atmospheric railway atWormwood Scrubs.[28] With both parties agreeing the mutual advantages of a commercial trial of an atmospheric system between Kingstown and Dalkey and funding assisted by the Board of Public Works, transportation trials began on 18 August 1843 with the full public opening on 29 March 1844.[29] The atmospheric operated for about 10 years, and while having some advantages there were ultimately cost and other disadvantages and the operation of the service by the smallPrincess locomotive[e] during a bad breakdown between 23 December 1848 and 5 February 1849 demonstrated the potential of working the line by conventional locomotives.[30] The final atmospheric train ran on 12 April 1854 when the D&KR handed the line to the D&WR as part of an 1846 agreement for the D&KR to lease their line.[31] The D&WR, who began running services from Bray to Dalkey and Dublin Harcourt Street[f] on 10 July 1854 thenrebuilt the Dalkey Kingstown section to5 ft 3 in (1,600 mm), removing the height restriction, and re-opening in October 1855.[32][33][g]
The D&KR lease to the D&WR came into operation on 1 July 1856, with the D&KR receiving compensation for all operational equipment. Some engines had already been converted to5 ft 3 in (1,600 mm), and the D&WR proceeded toconvert the whole line from4 ft 8+1⁄2 in (1,435 mm)standard gauge to the5 ft 3 in (1,600 mm) compatible with the rest of the D&WR.[34] Track gauge conversion was done in 1857 at a cost of £38,000.[citation needed]
Conversion to5 ft 3 in (1,600 mm) enabled the D&KR to begin a Westland Row toBray service which the former D&KR section became part of. The D&KR, who were now lessors only, initially believed the D&WR were favouring services on theHarcourt Street Line but this resolved over time.[35] May 1897 saw a Wexford mail train service terminating at Westland Row rather than Harcourt street, this being the start of services south of Bray.[36] The extension toCarlisle Pier was opened in 1859.[37] The opening of the Dublin Loop Line in 1891 enabled commuter services to be extended to Amiens street.[38]
On the 1 January 1925 grouping, both the D&KR and D&SER[h] were absorbed into the GSR.[39] Westland Row became the Dublin station for the formerMidland Great Western Railway main line services upon the closure ofBroadstone in 1937.[40] Ownership moved to CIÉ in 1945 and main line services to Wexford transferred from Harcourt Street prior to that lines closure in 1958.[41] Introduction of the high frequencyDART services in the late 1990s saw the move of mainline services fromPearse[i] toConnolly.
FromBradshaw's 1843 timetable:[42]
DUBLIN AND KINGSTOWN
From both ends on weekdays, every half-hour from 6 a.m. until 11½ p.m., stopping at all stations, Viz: Booterstown, Black Rock and Salt Hill.
An extra train from Kingstown at 9¼ a.m. stopping at Merrion in addition to the usual stations.
An extra train every day, at 4¾ p.m., stopping at Merrion only. This train will convey passengers to Her Majesty's mail packet, starting from Kingstown at 5¼ p.m.
The 11 p.m. Up and Down, also stop at Merrion every day.
Sunday trains same hours as on weekdays, with extra trains every ¼ of an hour from 11¾ a.m. to 5¾ p.m. and from 7¾ to 10¼ p.m.
FARES – First Class 1s, second class 8d, third class 6d.The mail bags are conveyed by the 8½ a.m. by Holyhead; 5 and 10 p.m. by Liverpool.
The D&KR initially ordered six locomotives,Hibernia,Britannia, andManchester fromSharp Brothers together withVauxhall,Dublin, andKingstown fromGeorge Forrester and Company.[43] The Sharps' engines employed vertical cylinders whilst the Forresters' were horizontal.[44]Vauxhall andHibernia were the first to arrive by ship for £21 each[45] and participated in public trials in October 1834[18] withHibernia hauling the first fee paying service on 17 December 1834. The design ofHibernia and her sisters proved problematic and they were withdrawn early,Hibernia having been noted to have exploded in 1842.[46] The D&KR ordered a further locomotiveStar from Forrester.[47] This was followed by two2-2-0T well tanks locomotives,Victoria andComet, again from Forrester's.[47] These were the first tank locomotives in public passenger service.[48]
1841 saw the D&KR'sGrand Canal Street railway works build the2-2-0T well tankPrincess which was the first locomotive in the world built by a railway company's own workshop.[49]Princess was also noted for being modified to fit the 8 feet 6 inches (2.59 m) profile of theDalkey Atmospheric Railway and worked that line for the period 23 December 1848 to 5 February 1849 when the atmospheric system broke down.[50]
Grand Canal Street also produced a series of locomotives for the D&KR afterPrincess, the list includes such names asBelleisle,Shamrock,Erin,Albert,Burgoyne,Cyclops,Vulcan,Jupiter[47] and possiblyJuno.[51] Some of these were either built or re-built to the5 ft 3 in (1,600 mm) gauge that was adopted around 1856.[52] A small number of these engines were noted as still operating in the 1870s where they looked diminutive compared to their successor2-2-2WTNeilson locomotives introduced from 1865.[51]
The D&KR initially introduced four types of four wheeled carriages. The fully enclosed purple first class carriage had 3 compartments, each with two rows of upholstered seats seating three abreast. The pale yellow covered carriages also had upholstered seats in three compartments but at four abreast for a total of 24 passengers. The green second class open class carriages were only used in summer. They had open sides and a roof and seated 28 in seven rows. Blue third class carriages were understood to have had roofs despite the depictions of contemporary illustrations. Capacity per carriage was 35 in seven rows of five abreast on boarded seats with low backrests. Typical trains consists were a single first class carriage, two to four second class and three third class.[53] Many carriages were converted to5 ft 3 in (1,600 mm) gauge in the mid-1850s.[citation needed]
One item of Dublin and Kingstown stock has survived into preservation.Open-sided second No. 38, built in 1834 for4 ft 8+1⁄2 in (1,435 mm) gauge and re-gauged for5 ft 3 in (1,600 mm) in 1857, was stored by the DW&WR, later atInchicore Works by the Great Southern Railways, along with third No. 48, built in 1838. They went to the 100th anniversary of the British Rainhill Trials in 1929 withGreat Southern and Western Railway locomotive No. 36 before being returned to rot in Inchicore dump. No. 48 was restored and preserved by the Belfast Transport Museum in 1964, where it remains in theUlster Folk and Transport Museum to this day.Unfortunately, No. 38 was considered to be too badly damaged by weathering and rot to be overhauled, and was scrapped while No. 48 was restored.
TheFry Collection contains a scale model replica of thefirst train in Ireland consisting of locomotive, tender and four carriages of different types.[54] TheScience Museum, London possesses 1:6 model of the 1851 built D&KR2-2-2T locomotiveAlexandra built by T. H. Goodisson and dating from the 1850s or shortly thereafter.[55]