Clyde Refinery

From Wikipedia, the free encyclopedia
Crude oil refinery in Clyde, New South Wales, Australia

Clyde Refinery
CountryAustralia
StateNew South Wales
CityClyde
Refinery details
OperatorShell Refining
Owner(s)Shell Australia
Commissioned1926
Decommissioned2013
Capacity85,000 bbl/d (13,500 m3/d)
No. of employees330 (2013)
Refining unitscrude distillation unit, high vacuum distillation unit,fluid catalytic cracker,alkylation unit,platformer unit,HDS unit, hydrotreater, benzene reduction unit, utilities, recovery plant

TheClyde Refinery was a crude oil refinery located inClyde, New South Wales, Australia, operating between 1925 and 2013. At the time of its closure it had a refinery capacity of 85,000 barrels per day (13,500 m3/d) and was the oldest operating oil refinery in Australia. It was operated byShell Australia.

History

[edit]

The Clyde Refinery was built byJohn Fell and Company Pty Ltd in 1925.[1] It was constructed largely from plant and materials relocated from ashale oil refinery the company had operated atNewnes and old shale retorts atTorbane, both north ofLithgow.[2][3] The refinery was purchased byShell Australia in 1928, who would continue to operate the refinery throughout the rest of its existence. The refinery was located inClyde where theParramatta River and theDuck River converge, 16 kilometres (9.9 mi) west of theSydney central business district.[4]

In 1948 Shell opened the first major bitumen refinery in Australia at Clyde, with a production capacity of 35,000 tons p/a of bitumen and 10,000 tons p/a of finished lubricants. The plant had originally been planned in 1938 but construction was delayed due to World War 2.[5]

The refinery was expanded significantly between 1959 and 1968, as part of Australia's post war industrial growth. This included the construction of aCatalytic Reforming Unit or Platformer in 1958, a HighVacuum Distillation Unit (HVU) in 1962, aCatalytic Cracking Unit (CCU) and a Polymerisation Unit in 1963, anAlkylation Unit and aSulphur Recovery Unit in 1964 and a newCrude Distillation Unit (CDU) in 1967.[2] By the end of 1968 the refinery's workforce had grown to over 1,000 employees, including 120 maintenance workers.[1] Shell deliberately hired a large number of ex-naval personnel to work at the refinery in this period, leading to the site being jokingly referred to as 'HMAS Clyde'.[2]

The expansion of the refinery continued into the 1970s, albeit at a slower rate, with the commissioning of an additional Platformer Unit in 1971 and a second Sulphur Recovery Unit in 1978.[2] The refinery was also the site of the firstpolypropylene (PP) plant in Australia, which was commissioned by Shell in 1970–1971 and had a capacity of 25,000 tonnes per year.[6]

During the 1980s the refinery went through a period of major rationalisation, with a large number of refinery units closed or merged. Between 1983 and 1984 the refinery's chemical plants were closed, including the Chemical Solvents plant, Hydrocarbon Solvents plant,Epikote plant andEthylene plant, resulting in redundancies for approximately 120 plant operators, as well as the warehouse storemen who had been responsible for packaging and distributing the refinery's chemical products.[2]

During the 2000s increased government regulation of fuel quality and environmental standards necessitated a number of upgrades to the refinery's existing plant. The refinery's hydrodesulphurisation (HDS) unit was upgraded in 2001 and again in 2008 to reduce the sulphur content of diesel, while in 2004 a new Benzene Reduction Unit (BRU) was built to lower benzene levels in gasoline. In 2008 a major upgrade of the refinery's catalytic cracking unit was also carried out.[7]

In April 2011 Shell announced it intended to shut down refining operations at Clyde and convert the Clyde Refinery and Gore Bay Terminal into a fuel import facility, pending board and employee consultation.[8] The decision was confirmed on 27 July 2011, with all refining activity on the site to cease by mid-2013. This was later brought forward 9 months and the refinery closed in 2012, before then being converted into an import terminal.[9][10]

Refinery operators at Clyde were members of the Coastal Districts Branch of the Federated Engine Drivers and Firemen's Association (FEDFA), which later merged into theCFMEU Mining and Energy Division.[1] Maintenance employees were represented by theAmalgamated Metal Workers Union and theElectrical Trades Union, while clerical employees were members of theFederated Clerks Union.[11] Other unions represented at the refinery included theFederated Ironworkers Association (FIA), theAustralasian Society of Engineers (ASE), theStoremen and Packers Union, theNSW Fire Brigade Employees Union (NSWFBEU) and theAssociation of Draughting, Supervisory and Technical Employees (ADSTE).[2]

Technical features

[edit]

At the time of its closure the refinery employed around 570 workers (including contractors) and had a processing capacity of 85 thousand barrels per day (13.5×10^3 m3/d) or around 4 million tonnes ofcrude oil annually.[4] Although relatively small in terms of refining capacity by modern standards, Clyde was a highly flexible plant capable of refining a broader range of crude types than most other Australian refineries (predominantly designed to accommodatelight,sweet Australian crudes) and was capable of changing its crude feedstock slate up to three times a day to meet changing demand.[7]

The refinery's product slate was composed of approximately 45%motor gasoline, 25%diesel fuel and 25%jet fuel with the remainder consisting offuel oil andLPG.[7] The refinery usually supplied around 40% of Sydney's fuel requirements and 50% of the fuel consumed inNew South Wales.[12] The refinery was connected by pipeline to distribution terminals inNewcastle, theVopak terminal atPort Botany and by a dedicated jet fuel pipeline toSydney Airport.[7]

Crude oil was supplied to the refinery from the nearby Gore Bay Terminal, also operated by Shell since its opening in 1901. The terminal is located on a 10 hectares (25 acres) plot of land inGreenwich onSydney Harbour and was connected to the refinery via a 19 kilometres (12 mi) underground pipeline with a 300 millimetres (12 in) diameter.[4] When the refinery was operating the terminal received approximately 90crude oil tankers per year.[7]

At the time of its closure in late 2013[13] the polypropylene plant was owned byLyondellBasell and had an annual production capacity of 170,000 tonnes.[14]

References

[edit]
  1. ^abcWestcott, Mark (2006). "One of the Boys or the Common Good?: Workplace Activism in the NSW Branch of the Federated Engine Drivers and Firemens Associations".Labour History.91 (91):75–94.doi:10.2307/27516153.JSTOR 27516153.
  2. ^abcdefWestcott, Mark (1997).Refining crude or crude refinements?: workplace industrial relations at Shell Clyde refinery, 1974-1994 (PhD).University of Sydney. Retrieved1 August 2017.
  3. ^"COMMONWEALTH OIL CO".Mudgee Guardian and North-Western Representative. 16 November 1925. Retrieved9 October 2021.
  4. ^abc"Shell Clyde Refinery & Gore Bay Terminal". Shell. 5 September 2010. Archived fromthe original on 23 September 2010. Retrieved5 September 2010.
  5. ^"NEW SHELL BITUMEN REFINERY AT CLYDE".Building & Engineering. Sydney: Master Builders' Federation of Australia & Illuminating Engineering Society of Australia (N.S.W.). 24 May 1948. Retrieved7 June 2017.
  6. ^"Global PP plant capacity". Grem-Chem. 9 October 2008. Archived fromthe original on 23 February 2019. Retrieved5 September 2010.
  7. ^abcdeStrategic Economics; SGS Economics and Planning (July 2011).The Future of Clyde Refinery(PDF) (Report).CFMEU Mining & Energy Division and theAMWU. Retrieved31 December 2017.
  8. ^"Shell says the refinery 'can't compete'".Sydney Morning Herald. 12 April 2011. Retrieved12 April 2011.
  9. ^"Shell to cease refining at Clyde". Shell Australia. 27 July 2011. Archived fromthe original on 29 September 2011. Retrieved27 July 2011.
  10. ^Clyde Russell (5 April 2013)."Time for Australia to decide if it wants oil refining".CNBC.[dead link]
  11. ^Decision of the ACTU Executive Meeting (Report).Australian Council of Trade Unions. May 1992. Retrieved6 July 2017.
  12. ^"Shell to Start Clyde Refinery in Next Few Months". Bloomberg. 17 March 2009. Retrieved5 September 2010.
  13. ^"LyondellBasell Industries N.V. Financial Report for the year ending 31 December 2014"(PDF). LyondellBasell Industries. Retrieved23 May 2016.
  14. ^"Clyde Polypropylene Plant"(PDF). LyondellBasell. 17 August 2006. Archived fromthe original(PDF) on 14 July 2011. Retrieved5 September 2010.
Divisions and
subsidiaries
Current
Former
Joint ventures
Current
Former
Brands
Facilities
and places
Controversies
People
Related topics
Retrieved from "https://en.wikipedia.org/w/index.php?title=Clyde_Refinery&oldid=1276433981"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp