Ciudad de la Paz | |
|---|---|
| Coordinates:1°35′20″N10°49′21″E / 1.58889°N 10.82250°E /1.58889; 10.82250 | |
| Country | |
| Province | Djibloho |
| Region | Río Muni |
| Government | |
| • Mayor | Florentino Ncogo Ndong |
| Area | |
• Total | 81.5 km2 (31.5 sq mi) |
| Elevation | 454 m (1,490 ft) |
| Population (2022) | |
• Total | 2,000[1] |
| • Density | 25/km2 (64/sq mi) |
| Time zone | WAT |
| Climate | Am/As |
Ciudad de la Paz (Spanish:[θjuˈdaddelaˈpaθ],lit. 'City of Peace'), also known asDjibloho orOyala,[3] is acity inEquatorial Guinea that is being built to replaceMalabo as the nationalcapital.[4][5][6] Established as anurban district inWele-Nzas in 2015,[7] it is now the administrative headquarters ofDjibloho, Equatorial Guinea's newest province created in 2017, and is located near the town ofMengomeyén.[8] In 2017, the city was officially renamedCiudad de la Paz ("City of Peace").[9][10]
Theplanned city's location was chosen for its easy access and benign climate. It is notably on the mainland, in contrast to Malabo, which is on the island ofBioko. It was designed by the Portuguese Studio forArchitecture andUrbanism FAT – Future Architecture Thinking. It is projected to have around 200,000 inhabitants,[11] a newParliament building, a number of presidential villas and an area of 8150 hectares.[12][13] The construction of this new capital has been criticised by the political opposition to PresidentTeodoro Obiang, the driving force behind the initiative. The Government of Equatorial Guinea began to move to the city in early 2017.[14]
Oyala – Ciudad de la Paz is located near the centre ofRío Muni, the continental part of Equatorial Guinea. It is located between the cities ofBata andMongomo and 20 km from theairport of Mengomeyén. The power supply relies upon the 120 MWDjibloho Dam in the district Djibloho Evinayong.[15]
Oyala – Ciudad de la Paz has a tropical climate that borders between atropical monsoon climate and atropical savannah climate. It has high overall rainfall, averaging 2142 mm a year, which supports the lush rainforests in the region. There is an extensive wet season, spanning 10 months of the year from September to June, and a brief and slightly cooler dry season covering the remaining two months, July and August. There is also a noticeably drier, though still wet, stretch in December and January. Temperatures remain very warm throughout the course of the year, albeit lower than one might expect in other places with the same climate, especially considering its proximity to theequator.[citation needed]
| Climate data for Ciudad de la Paz | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Year |
| Mean daily maximum °C (°F) | 27.7 (81.9) | 28.2 (82.8) | 28.4 (83.1) | 28.2 (82.8) | 27.8 (82.0) | 26.4 (79.5) | 25.2 (77.4) | 25.6 (78.1) | 26.3 (79.3) | 26.9 (80.4) | 26.9 (80.4) | 27.1 (80.8) | 27.1 (80.8) |
| Daily mean °C (°F) | 23.1 (73.6) | 23.2 (73.8) | 23.2 (73.8) | 23.3 (73.9) | 23.1 (73.6) | 22.2 (72.0) | 21.1 (70.0) | 21.2 (70.2) | 21.9 (71.4) | 22.3 (72.1) | 22.4 (72.3) | 22.9 (73.2) | 22.5 (72.5) |
| Mean daily minimum °C (°F) | 18.5 (65.3) | 18.3 (64.9) | 18.1 (64.6) | 18.4 (65.1) | 18.4 (65.1) | 18.0 (64.4) | 17.0 (62.6) | 16.9 (62.4) | 17.6 (63.7) | 17.8 (64.0) | 17.9 (64.2) | 18.7 (65.7) | 18.0 (64.4) |
| Average rainfall mm (inches) | 89 (3.5) | 181 (7.1) | 228 (9.0) | 270 (10.6) | 240 (9.4) | 125 (4.9) | 14 (0.6) | 37 (1.5) | 233 (9.2) | 352 (13.9) | 254 (10.0) | 119 (4.7) | 2,142 (84.4) |
| Source: Climate-Data.org | |||||||||||||
In the middle of the undevelopedforest, the government plans to build a new city as the future seat of government.[11][16] It will be theheadquarters of the president, government, administration, police and military leadership[16] and replace the current capitalMalabo. The city is being designed to house 160,000–200,000 people, living in an area of 81.5 km2.
A golf course, a university, and a luxury hotel were finished in 2013 and a six-lane highway is almost complete.[16] In planning are government buildings, a financial district and residential areas. Three bridges and highways have been completed or are under construction. There will be a connection between the city and the newairport inMengomeyen (the home of the president). The strategic importance of the port city ofBata will be developed for the neighbouringGabon and forCentral Africa. For the highways, huge swaths of forest were cleared and lanes blown up. The Portuguese Chamber of Commerce (AICEP) said the city should use renewable energy and be sustainable.[citation needed]
Funding is provided throughAICEP Portugal Global. The plans come from a Portuguese architectural office. The construction work will be supported byChina,Poland,Brazil andNorth Korea.[16] Construction faces delays such as, according to unconfirmed reports, President Obiang ordered a building to be moved because he did not like the view.[16] Additionally, all materials are imported.[16]
The city was designed by the Portugueseurban architectureFAT – Future Architecture Thinking. Estimates of its ultimate population size have been revised from 65,000 initially[17] to between 160,000 and 200,000.[2]
The city will be built on an area of 8,150 hectares (81.5 km2 or 20,100 acres).[12][13] According to FAT, the Djibloho project "combines modernity and respect for the cultural roots of the country, promoting local identity and the richness of the ecosystem in which it operates, prioritizing sustainability in the most varied aspects" stressing that "this project aims to create the first global capital entirely dependent on renewable and sustainable energy."
| ||
|---|---|---|
President of Equatorial Guinea Government
| ||
In 2021, a video sponsored by the China State Construction group, which is part of the building consortium, showed what appeared to be an overpass of completed, but not yet functioning, highways to Oyala, Bata, Mongomo and Mengomeyén airport.[18] The video continued showing viewers around parts of the new city, where work on a six-storey cylindrical tower-building for the ministry of infrastructure remained partly built, and most other structures appeared far less advanced.
However, 2022 videos show two glass towers, the gateway to the campus of theAfro-American University of Central Africa,[19] several administrative style buildings and the Grand Hotel Djibloho all appearing functionally complete.[20] The 380-room hotel has a golf course, wellness centre and facilities for conferences as large as 1200 people, though its own website[21] describes itself as being surrounded by tropical forest, which suggests that it is not in the heart of a city.[citation needed]
{{cite web}}:Missing or empty|url= (help)