Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

China Railway CR450BF

From Wikipedia, the free encyclopedia
Chinese high-speed EMU
China Railway CR450BF
Stock typeElectric multiple unit
ManufacturerCRRC Changchun Railway Vehicles
Family nameFuxing
Constructed2024-
Number built1
Number in service0
Formation4M4T
Fleet numbersCR450BF-0501
Capacity552
OperatorsChinaChina Railway
ChinaChina Academy of Railway Sciences
Specifications
Train length211.4 metres (694 ft)
Width3.36 metres (11.0 ft)
Maximum speed
  • Service:
  • 400 km/h (250 mph)
  • Design:
  • 450 km/h (280 mph)
  • Record:
  • 453 km/h (280 mph)
Axle load14.5 tonnes (32,000 lb)
Electric system(s)25kV 50Hz AC
Current collectionPantograph
UIC classification(2’2’)(Bo’Bo’)(2’2’)(Bo’Bo’)(Bo’Bo’)(2’2’)(Bo’Bo’)(2’2’)
Safety system(s)CTCS-400T, Vigilance
Coupling systemScharfenberg
Headlight typeLight Emitting Diode
SeatingLongitudinal
Track gauge1,435 mm (4 ft 8+12 in)

TheCR450BFFuxing (Chinese: 复兴号;pinyin:Fùxīng Hào) is a Chinese electrichigh-speed train manufactured byCRRC Changchun Railway Vehicles. As part of the China Standardized EMU, the CR450BF is designed to operate at speed of 400 km/h (249 mph) and a maximum test speed of 450 km/h (280 mph).

History

[edit]

2020

[edit]

Drafted between 26 and 29 October on the fifth plenum of the 19thCentral Committee of the CCP, the project was announced as part of China’s14th five-year plan, known as “Research and development plans for speedier bullet train”.[1]

2023

[edit]

OnJune 28, test runs were conducted on theFuzhou-Xiamen high-speed railway using two trainsets:CR400AF-J-0002 comprehensive inspection train (CIT) containing a CR450AF intermediate car, andCR400BF-J-0001 comprehensive inspection train (CIT) containing a CR450BF intermediate car. During these tests, a speed of 453 km/h (281 mph) was reached, and a relative speed of 891 km/h (554 mph) was reached, setting a new world record for the relative speed between two conventionally wheeled trains.[2]

On June 29, the test trains ran in Haiwei tunnel and conducted a maximum speed of 420km/h for a single train a 840km/h of relative speed.[1]

2024

[edit]

On December 29, CRRC held a media conference in Beijing, China and officially released the two prototypes of CR450 family EMUs,CR450AF-0201 and CR450BF-0501[3]

2025

[edit]

The CR450BF is expected to enter regular service in 2025, by the end of the 14th five-year plan.[1]

Design

[edit]

According to CRRC, compared to the CR400BF, the CR450BF:

  • Is 10% lighter[4]
  • Has 22% lower drag[4]
  • Consumes 20% less energy
  • Retains the same 6500m braking distance from 400 km/h asCR400BF from 350 km/h.

Frame

[edit]

A standard CR450BF has 8 carriages, and is made of lightweight materials such as aluminum, carbon fiber and glass fiber, of which four (cars 2/4/5/7) are power-cars and four (cars 1/3/6/8) are trailers.[5]

Each middle car has two pairs of door at the end of the carriage, except the dining car, which only has one pair. The two lead cars on both of its ends also have two pair of doors fitted but one of them serves as the exclusive access to the driver's cab.[5]

Two sets of pantographs are installed on trailer cars 3 and 6 for collecting current from the overhead catenaries.[5]

Each carriage on the CR450BF has a reduced height, compared to its predecessors, therefore reducing drag by reducing the body cross section area.[5]

Electrical systems

[edit]

According to CRRC, the CR450BF has a higher traction force by usingpermanent-magnet synchronous motor (PMSM), which enables at least 3% higher energy conversion efficiency.[5]

The train uses pantograph to gain 25kV 50Hz AC from the overhead catenary, which is the only type of energy source used on theChina Railway network all across China.

It also has a storage battery system which can provide the train with a 110V DC power source.[5]

Mechanical systems

[edit]

The CR450BF prototype has redesigned integrated bogies, which according to CRRC, are 20% lighter than previous generations of traditional externally mounted ones seen on other Chinese high-speed EMUs.[6] Unlike other production models, they are hidden under the side skirt of the frame with a enclosure design for better aerodynamic performance and therefore reduce drag for a better energy efficiency, similar to those seen on the JapaneseShinkansen, or the end-car of GermanICE 4.

Interior

[edit]

There are four classes of seating on board the CR450BF: Second Class, First Class, Premium First class and Business Class.[7] Second Class has 482 seats in a 2-3 layout, similar to other Chinese EMUs and carriages.[8]

First Class has 28 seats in a 2-2 layout. Compared with second class, the seats are made of leather and offer improved comfort with more width and legroom.[8]

Premium first class has 24 seats in a 2-2 layout, and debuted in 2023 on previous CR400 trainsets. Compared with first class, it offers greater legroom and features a footrest.[5]

The business class cabin has undergone various redesigns, consisting of three different types of seating configurations: a 6-seat classic business class setup, a business suite that accommodates six individuals, and a multi-purpose suite that offers more privacy.[8]

Variants

[edit]

CR450BF (Prototype)

[edit]

The first trainset built, CR450BF-0501, was first rolled out on November 26, 2024. It is designed for testing and qualification purposes.[9]

Coach sequence of CR450BF-0501 prototype
NoModelTypeUIC numberClassCapacityLength
1ZYSTrailer carZYS01xxxxBusiness/Premium First3028550mm
2ZESPower carZES02xxxxSecond8525650mm
3ZETrailer car (with pantograph)ZE03xxxxSecond9025650mm
4ZEPower carZE04xxxxSecond8025650mm
5ZECPower carZEC05xxxxSecond/Dining car6325650mm
6ZETrailer car (with pantograph)ZE06xxxxSecond9025650mm
7ZESPower carZES07xxxxSecond8025650mm
8ZYSTrailer carZYS08xxxxBusiness/First3428550mm

See also

[edit]

References

[edit]
Wikimedia Commons has media related toChina Railway CR450BF.
  1. ^abcTiwari, Sakshi (2023-07-03)."At 453 KM/H, China Tests World's Fastest, New-Gen High-Speed Train That Is Safer, Energy-Efficient & Intelligent".EURASIAN TIMES. Retrieved2024-12-31.
  2. ^Paleja, Ameya."At 281 miles an hour, China's new high-speed maglev train is the world's fastest".Interesting Engineering. Retrieved2024-12-30.
  3. ^"FOCUS | China debuts prototype of fastest high-speed train in the world".english.news.cn. Retrieved2024-12-29.
  4. ^ab"全球最快高铁列车来了!CR450动车组样车发布".www.guancha.cn. Retrieved2024-12-29.
  5. ^abcdefg"CR450AF(样车)动车组 - 动车组列车 - 记录高速动车组列车及城市轨道交通列车发展历程 —— 慧伊创新科技(北京)有限公司".www.china-emu.cn. Retrieved2024-12-29.
  6. ^BATRAK, OLEKSANDR (2024-07-30)."CRRC Develops Innovative Bogie for High-Speed Trains".Railway Supply. Retrieved2025-01-01.
  7. ^"China debuts prototype of fastest high-speed train in the world".english.www.gov.cn. Retrieved2024-12-29.
  8. ^abcsina_mobile (2024-12-29)."运营时速 400 公里全球最快,我国 CR450 动车组样车内饰、坐席等设计公布".finance.sina.cn. Retrieved2024-12-29.
  9. ^"CR450AF departing factory". 2024-11-26.
High-speed demonstrativemaglev
Coastal
Hangshen
parallel
other branches
Beijing–Shanghai
West route
East route
branches
Beijing–Hong Kong (Taipei)§
ToHong Kong
ToTaipei
Harbin–Hong Kong (Macau)§
Hohhot–Nanning
Beijing–Kunming
Branch lines
Baotou (Yinchuan)–Hainan
Lanzhou (Xining)–Guangzhou
Suifenhe–Manzhouli
Beijing–Lanzhou
Qingdao–Yinchuan
Eurasia Continental
Yangtze River
Old line
Shanghai–Kunming
Xiamen–Chongqing
Guangzhou–Kunming
Intercity and
long-distance
North China
Northeast China
East China
Central and South China
Northwest China
Southwest China
Intercity railway
networks
Upgraded lines with
operating speeds
≥ 200 km (120 mi)
  • Italics: under construction or currently not operational
  • (-), Place A-: section under construction or currently not operational
  • §: in/related to Hong Kong, Macau, Taiwan
  • (Place A–Place B): share tracks with other lines
Technologies
Proposed
High-speed trains
by service speed
or planned service speed
400 km/h
(249 mph)
or more
350–399 km/h
(217–248 mph)
300–349 km/h
(186–217 mph)
250–299 km/h
(155–186 mph)
200–249 km/h
(124–155 mph)
High-speed railway line
By countries and territories

planned networks in italics
Africa
Americas
Asia
Europe
Oceania
Multiple units of China Railway
Centralized
power
Pre-CRH era
Fuxing EMU
Distributed
power
Pre-CRH era
CRH
200–250km/h
350–380km/h
Others
Intercity
multiple units
CJ-series intercity units
CRH intercity EMU
Fuxing EMU
200–300km/h
300–400km/h
400–450km/h
Centralized power
Distributed power
S = single set
Retrieved from "https://en.wikipedia.org/w/index.php?title=China_Railway_CR450BF&oldid=1310423703"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp