Chifeng–Kazuo high-speed railway

From Wikipedia, the free encyclopedia
High-speed rail line in China
Chifeng–Kazuo high-speed railway
Train G3671 approaching to Chifeng railway station
Overview
Native name喀赤高速铁路
赤峰至京沈高铁喀左站铁路
StatusOperational
OwnerChina RailwayChina Railway
LocaleInner Mongolia,Liaoning
Termini
Stations5
Service
TypeHigh-speed rail
SystemChina Railway High-speedChina Railway High-speed
History
OpenedJune 30, 2020 (2020-06-30)
Technical
Line length165 km (103 mi)
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
Electrification25 kV 50 Hz AC (Overhead line)
Operating speed250 km/h (160 mph)
Route map

km
0 km
Kazuo
Jianping
Ningcheng
Pingzhuang
165 km
Chifeng
km
This diagram:

TheChifeng–Kazuo high-speed railway (also referred to in Chinese as theChika high-speed railway) is a double-track electrified railway connectingChifeng,Inner Mongolia andKazuo Station of theBeijing–Shenyang high-speed railway. The line passes throughHarqin Zuoyi Mongol Autonomous County andJianping County, both administered byChaoyang City. It then passes into areas administered by Chifeng:Ningcheng County and Pingzhuang town ofYuanbaoshan District to the existing Chifeng station (formerly known as Chifeng West station) on theBeijing–Tongliao railway. The main line has a total length of 157 kilometres and the target design speed is 250 kilometres per hour.[1] A connecting curve to the Beijing–Shenyang high-speed railway on the west side of Kazuo station to/from Beijing is proposed. The railway was built in the second half of 2016[2] and joint commissioning and testing began on April 1, 2020. It was officially opened for operation on June 30, 2020.[3][4]

References

[edit]
  1. ^"新建赤峰至京沈高铁喀左站铁路环境影响报告书简本" [A brief version of the railway environmental impact report for the newly built Chifeng-Kazuo Station of the Beijing-Shenyang High-speed Railway](PDF) (in Chinese). 铁道第三勘察设计院 [The Third Railway Survey and Design Institute]. Archived fromthe original(PDF) on 28 December 2015. Retrieved21 November 2022.
  2. ^"赤峰至喀左高铁4月1日开始联调联试" [The Chifeng-Kazuo high-speed railway will start joint commissioning and testing on April 1.] (in Chinese). 中国经济网. 1 April 2020. Retrieved21 November 2022.
  3. ^"赤峰高铁30日正式通车!" [Chifeng high-speed rail officially opened to traffic on the 30th!].赤峰网信 (in Chinese). 30 June 2020. Archived fromthe original on 2 July 2020. Retrieved21 November 2022.
  4. ^"辽宁 喀赤高铁今天正式开通运营" [Liaoning Kachi high-speed railway officially opened for operation today].辽沈晚报 (in Chinese). 30 June 2020.Archived from the original on 13 September 2020. Retrieved21 November 2022.