Châtillon–Montrouge | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Châtillon–Montrouge station, island platform for Line 13 | |||||||||||||||||||||
| General information | |||||||||||||||||||||
| Location | Châtillon andMontrouge,Hauts-de-Seine Île-de-France France | ||||||||||||||||||||
| Coordinates | 48°48′38″N2°18′07″E / 48.810539°N 2.301826°E /48.810539; 2.301826 | ||||||||||||||||||||
| Operated by |
| ||||||||||||||||||||
| Platforms |
| ||||||||||||||||||||
| Tracks |
| ||||||||||||||||||||
| Connections | |||||||||||||||||||||
| Construction | |||||||||||||||||||||
| Depth | Line 15: 31 m (102 ft)[1][2] | ||||||||||||||||||||
| Accessible |
| ||||||||||||||||||||
| Architect | Line 15: Périphériques architectes (Anne-Françoise Jumeau, Marin + Trottin)[2] | ||||||||||||||||||||
| Other information | |||||||||||||||||||||
| Station code | 27-09 | ||||||||||||||||||||
| Fare zone | 3 | ||||||||||||||||||||
| History | |||||||||||||||||||||
| Opened | November 9, 1976 (1976-11-09) | ||||||||||||||||||||
| Passengers | |||||||||||||||||||||
| 5,034,012(2021) | |||||||||||||||||||||
| Services | |||||||||||||||||||||
| |||||||||||||||||||||
| Future services | |||||||||||||||||||||
| |||||||||||||||||||||
| |||||||||||||||||||||
Châtillon–Montrouge station (French pronunciation:[ʃɑtijɔ̃mɔ̃ʁuʒ]) is the southernterminus ofLine 13 of theParis Métro and the eastern terminus oftramway Line 6. It is an elevated station located on the border between thecommunes ofChâtillon andMontrouge inHauts-de-Seine.

The station opened on 9 November 1976 as part of the extension of line 13 fromPorte de Vanves toChâtillon–Montrouge, on the same day theold line 14 was incorporated into line 13 following the latter's extension in successive phases fromSaint-Lazare.
Since June 2008, to enable automatic train reversal at the station,platform screen doors have been installed on the platforms to prevent passengers from falling onto the tracks when no drivers are present in the trains during this operation. It was the first station on the line to receive them.

In 2019, the station was used by 7,196,503 passengers, making it the 39th busiest of the Métro network out of 302 stations.[3]
In 2020, the station was used by 3,738,453 passengers amidst theCOVID-19 pandemic, making it the 33rd busiest of the Métro network out of 304 stations.[4]
In 2021, the station was used by 5,034,012 passengers, making it the 35th busiest of the Métro network out of 304 stations.[5]
As part of theGrand Paris Express, the station will become an interchange withline 15, with preparatory work having begun in 2015 to free up space for the station,[6] and construction since 2018. It is slated to open in late 2026.[7]

The station will consist of five intermediate levels, including a mezzanine, with an artistic ceiling in the atrium designed byLaurent Grasso and David Trottin. The 800 m2 (8,611 sq ft) work will consist of 2750 printed aluminum blades that form atrompe-l'oeil sky inspired byRenaissance paintings and will vibrate with the circulation of air.[8][9] As part of theIllustrer le Grand Paris programme by theSociété du Grand Paris, which aimed to illustrate Ile-de-France territories served by the new métro lines, the station's platforms will feature a fresco designed by Roxane Lumeret.[10]
In November 2019, thetunnel boring machine, Ellen, reached the station, completing the tunneling at the station.[7] Civil works, including the excavation of the station box, were completed in end-May 2022. The installation of infrastructure such as escalators and lifts, networks (electrical, telephony, plumbing), painting, and construction of the surface building will take place over the next two years.[11]
The existing line 13's station was upgraded in early 2023 as part of the project. Its existing platforms were renovated and a sheltered footbridge was added above the platforms to connect to line 15. A new side platform was constructed to serve as an additional departure platform to accommodate the increased traffic expected when line 15 opens. It is located next to the surface building for line 15 and is equipped with an emergency exit.[12][13]
The station has two accesses:
| 1F | Mezzanine | |
| Platform level | Side platform, withPSDs, doors will open on the left | |
| Northbound | ← | |
| Island platform, withPSDs, doors will open on the left, right | ||
| Northbound | ← | |
| Southbound | ||
| Side platform, withPSDs, doors will open on the right | ||
| Street Level | ||
The station has been served by arubber-tired tram,tramway T6, since 13 December 2014 as part of its initial section betweenChâtillon–Montrouge andRobert Wagner, serving as its eastern terminus.