Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

China Railway CRH1

From Wikipedia, the free encyclopedia
(Redirected fromCRH380D)
Chinese high-speed train
This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "China Railway CRH1" – news ·newspapers ·books ·scholar ·JSTOR
(December 2007) (Learn how and when to remove this message)
China Railways CRH1 EMU
In service1 February 2007–present
ManufacturerBombardier Sifang (Qingdao) Transportation Ltd.
(Bombardier Transportation andCSR Sifang)
Family nameReginaZefiro
Number builtCRH1A: 128 trainsets (1024 cars)
CRH1A–A: 87 trainsets (696 cars)
CRH1B: 24 trainsets (384 cars)
CRH1E: 15 trainsets (240 cars)
CRH1E–NG: 5 trainsets (80 cars)
CRH380D: 85 trainsets (680 cars)
FormationCRH1A/A–A: eight cars per trainset (5M3T)
CRH1B/E/E–NG: 16 cars per trainset (10M6T)
CRH380D: eight cars per trainset (4M4T)
CapacityCRH1A: 668 or 611 or 646 or 635
CRH1A–A: 613
CRH1B: 1299
CRH1E/E–NG: 618 or 642
CRH380D: 495
OperatorsChina Railway
-CR Guangzhou
-CR Shanghai
-CR Nanchang
-CR Chengdu
Lines servedHigh speed and major conventional rail lines in southern China
Specifications
Car body constructionCRH1A/B/E: Stainless Steel
CRH1A–A/E–NG/380D: Aluminium Alloy
Train lengthCRH1A: 213.5 m (700 ft 6 in)
CRH1A–A: 207.9 m (682 ft 1 in)
CRH1B: 426.3 m (1,398 ft 7 in)
CRH1E: 428.9 m (1,407 ft 2 in)
CRH1E–NG: 413.1 m (1,355 ft 4 in)
CRH380D: 215.3 m (706 ft 4 in)
Platform height500–1,250 mm (1 ft 7.7 in – 4 ft 1.2 in)
Maximum speedCRH1A:200 km/h (124 mph)or 250 km/h (155 mph)
CRH1A–A/B/E/E–NG:250 km/h (155 mph)
CRH380D: 380 km/h (236 mph)
WeightCRH1A/A–A:435 t (428long tons; 480short tons)
CRH1B:850 t (837 long tons; 937 short tons)
CRH1E/E–NG:890 t (876 long tons; 981 short tons)
CRH380D:450 t (443 long tons; 496 short tons)
Traction systemWater coolingIGBT-VVVF inverter control (Bombardier MITRAC 1000)[1][2]
Traction motors3-phase AC induction motor (Bombardier DR-1200 [CRH1A] or DR-1500 [CRH1B/E])
Power outputCRH1A: 5.3 MW (7,107 hp)
CRH1A–A: 5.5 MW (7,376 hp)
CRH1B/E/E–NG: 11 MW (14,751 hp)
CRH380D: 10 MW (13,410 hp)
TransmissionAC-DC-AC
AccelerationCRH1A/B/E:Maximum 0.6 m/s2 (1.3 mph/s)
CRH380D: 0.48 m/s2 (1.1 mph/s)
DecelerationCRH1A:Emergency 1.2 m/s2 (2.7 mph/s)
General 0.8 m/s2 (1.8 mph/s)
Electric system(s)25 kV 50 Hz ACOverhead catenary
Current collector(s)Pantograph
Braking system(s)Regenerative,electronically controlled pneumatic brakes
Track gauge1,435 mm (4 ft 8+12 in)standard gauge

TheCRH1EMU, also known asHexie (simplified Chinese:和谐号;traditional Chinese:和諧號;pinyin:Héxié Hào;lit. 'Harmony'), is ahigh-speed train operated byChina Railway and built by a joint venture betweenBombardier Transportation andSifang at Bombardier Sifang Power Transportation factory inQingdao,Shandong Province,People's Republic of China.

At the same time as ordering theShinkansen-basedCRH2A and thePendolino-basedCRH5A, theChinese Ministry of Railways ordered Bombardier-based CRH1, specifically 20 CRH1A trainsets in June 2007 and an additional 20 CRH1A trains, each with eight cars that have total standard capacity of 670 people. The total value of the order is €560 million.[3] In July 2010, a further 40 CRH1A eight-car trains were ordered.[4]

Variants

[edit]
Regina inSweden. The Regina trains in Sweden are wider than the CRH1; Swedish versions are specially designed for running out-of-gauge, while Chinese versions do not have such design, although the width of both loading gauges are the same.
Early version of China railways CRH1A

CRH1A

[edit]

CRH1A and CRH1B are based on Bombardier'sRegina family.[5] The train was designed bySifang andBombardier jointly inVästerås,Sweden and originally named C2008.[3][5]

Each CRH1A set consists of eight cars, the first batch (CRH1-001A~CRH1-040A) including two first class coaches (ZY), 5 second class coaches (ZE) and 1 second class coach/dining car (ZEC).the second batch (CRH1-081A~CRH1-120A) including two first class coaches (ZY), one first class/second class coaches (ZYE), four second class coaches (ZE) and 1 second class coach/dining car (ZEC). The potential maximum speed of CRH1A is 250 km/h (155 mph), but in fact the maximum speed of the initial 40 sets in operation is always restricted by the software of computer control system, so the maximum speed in service is 220 km/h (137 mph).

The first units (CRH1-001A) were delivered on August 30, 2006,[6] the CRH1A sets started service from February 1, 2007 at the Guangzhou -Shenzhen Railway. The 2 problems of this train is that this train is made out of stainless steel, so when the train go through tunnels, the passenger with have some ear sensitivity. This train had been given a nickname, big metro. The seats can't turn around, so half of the passengers have backward seats. The only good thing is that having fixed chairs with have more space, so CRH1A has can carry the most people.

In July 2010, the Chinese MOR ordered additional 40 sets of CRH1A, The designed top operating speed increased to 250 km/h (155 mph), In September 2010, during test run at Qinshen PDL, top speed of CRH1-081A reach 278 km/h (173 mph).[7]

From July 1, 2014, all CRH series EMU numbers have been changed. The original number is (CRH1—xxxA), and now it is changed to (CRH1A-1xxx). Production EMUs after that date are in accordance with the new regulations.

CRH1A-A

[edit]
Further information:Bombardier Zefiro § Zefiro 250

In September 2012, The MOR issued a revision in the Zefiro contract, which calls for the order of an additional 106 eight car Zefiro 250 (46 sets) and Zefiro 250NG (60 sets) train sets in lieu of the cancellation of the 16 car Zefiro 380 sets. The NG variant is a new model, which will use new materials in order to achieve weight reductions and more efficient operation.[8]

CRH1B

[edit]

On October 31, 2007, the Chinese MOR ordered 20 sets of CRH1B trains (CRH1-041B~CRH1-060B). CRH1B is a fleet-extended CRH1A. Each CRH1B consists of 16 cars, including three first class coaches (ZY), 12 second class coaches (ZE) and one dining car (CA). CRH1B, however, have not such restriction on the operational speed, the maximum speed is still 250 km/h (155 mph). CRH1B first come into commercial use in April 2009, between Shanghai–Nanjing & Shanghai–Hangzhou.[9]

On July 23, 2011, CRH1-046B was hit on ZY104600 car by CRH2-139E inYongtaiwen PFL accident.

CRH1E

[edit]
Main article:Bombardier Zefiro

On October 31, 2007, the Chinese MOR ordered 20 sets of CRH1E trains (CRH1-061E~CRH1-080E). The CRH1E is the first high-speed 16-car sleeper train (10M6T) in the world which is based on Bombardier'sZEFIRO 250 km/h (155 mph) design. The train was designed by Bombardier and Zagato. Each train set from the first 12 trainsets consists of one luxury sleeper (WG), 12 soft sleepers (WR), two second-class coaches (ZE), and one dining car (CA). The first CRH1E trainset delivered in October 2009, first came into service on November 4, 2009, between Beijing–Shanghai. In fact, only 15 CRH1Es were delivered, three of which had the luxury sleeper replaced with normal sleepers. The other five ended up being CRH1Bs, this time based on the CRH1E design (instead of CRH1A). Later on five additional CRH1Es (based on the CRH1A-A design) have also been manufactured and delivered.[9]

CRH1E-NG

[edit]
CRH1E-NG atBeijing South Railway Station

CRH1E-NG (NG=New Generation), or CRH1E-250 was introduced in December 2015 as supplemental trains to the first-generation CRH1E. The head shape resembled similar to the CRH1A-A, which also belongs to the Bombardier ZEFIRO platform. In addition, the original stainless steel body was changed to an aluminum alloy body to improve the air tightness of the car body. The train consists of 16 cars with 10 motors and 6 tractors and a power of 11,000kW. The maximum operating speed is 250km/h, and the maximum test speed is 280km/h.

CRH1E-NG is designed as a sleeper EMU, mainly running at night, but in actual situations, it will run some short-distance EMUs (it once carried the train numbers D2348 and D2347). Therefore, the soft sleeper berth of the CRH1E-NG EMU has an adjustable seat design, and the bed board of the upper bunk is changed to a flip-up design that can be lifted upward. A backrest cushion is added to the side wall of the lower bunk bed, and a hidden pull-down armrest is designed between the cushions. A 4-person soft sleeper private room can be converted into a 6-person soft seat private room.

At the same time, the CRH1E-NG EMU has also added some humanized facilities: for example, the even-numbered carriages are equipped with three toilets, and the lighting is optimized. In order to avoid unnecessary waste, the original CRH1E dining car (CA) was changed to a dining car with soft sleepers (WRC).

CRH380D

[edit]
Main article:Bombardier Zefiro
CRH380D atGuangzhou North railway station

The CRH380D is also derived from the Bombardier Zefiro family (Zefiro 380) of very high-speed EMUs and are not direct derivatives of the Regina type trains from which the CRH1A and CRH1B classes are derived. This is the only high-speed rail that doesn't have a 16-car version without connecting 2 trains into 1.[10] Top speed is advertised at 380 km/h (236 mph).[11] The eight-car version is designated CRH380D, series number CRH380D-1501 ~ CRH380D-1585.[8]

Formation

[edit]

Power Destination

  • M – Motor car
  • T – Trailer car
  • C – Driver cabin
  • P – Pantograph


Coach Type

  • ZY – First Class Coach
  • ZE – Second Class Coach
  • ZYE – First Class/Second Class Coach
  • ZEC – Second Class Coach/Dining Car
  • ZYT – First Class/Premier Coach
  • ZET – Second Class/Premier Coach
  • ZYS – First Class/Business Coach
  • ZES – Second Class/Business Coach
  • WR – Soft Sleeper Car
  • WRC – Soft Sleeper/Dining Car
  • WG – Luxury Sleeper Car

  • car door
    car door
  • First Class Coach.
    First Class Coach.
  • Interior of a second class coach.
    Interior of a second class coach.
  • second class coach/buffet car (ZEC)
    second class coach/buffet car (ZEC)

CRH1A & CRH1A–A

[edit]

CRH1A-1081~1085, 1091~1093, 1105, 1110~1116, 1120, and CRH1A-1121~1166, information is currently missing.

Coach No.12345678
Type13ZYZEZECZEZY
Type2ZYSZEZECZEZYS
Type4ZYZEZECZYEZEZY
Type5
(CRH1A–A)
ZYZEZECZE
Power ConfigurationMcTPMTMTPMc
Power UnitsUnit 1Unit 2Unit 3
Capacity1721012410172
Capacity2571012410168
Capacity36492249264
Capacity4649224779264
Capacity5
(CRH1A–A)
489077639065
  • ^1 Set Nº. 1001~1012、1014~1016、1018、1167、1168
  • ^2 Set Nº. 1013、1017、1019~1020
  • ^3 Set Nº. 1021~1040
  • ^4 Set Nº. 1086~1090、1094~1104、1106~1109、1117、1119
  • ^5 Set Nº. 1169~1228、1234~1260

CRH1B

[edit]
Coach No.12345678910111213141516
TypeZEZECZEZY
Power ConfigurationMCTPMTPMTMTMTPMTPMC
Power UnitsUnit 1Unit 2Unit 3Unit 4Unit 5Unit 6
Capacity17992(56)927264
Capacity26893(58)93797554
  • ^1 Set Nº. 1041~1060
  • ^2 Set Nº. 1076~1080

CRH1E

[edit]
Coach No.12345678910111213141516
Type1ZEWRZECWGWRZE
Type2ZECWR
Type3
(CRH1E-NG)
WRCWGWR
Power ConfigurationMcTPMTPMTMTMTPMTPMc
Power UnitsUnit 1Unit 2Unit 3Unit 4Unit 5Unit 6
Capacity16140(58)164061
Capacity2(58)40
Capacity3
(CRH1E-NG)
551255
  • ^1 Set Nº. 1061~1072
  • ^2 Set Nº. 1073~1075
  • ^3 Set Nº. 1229~1233 (This model is based on the CRH1A-A and sometimes informally called "CRH1E-NG" or "CRH1E-250".)

CRH380D

[edit]
Coach No.12345678
Type1ZYTZEZECZEZEZET
Type2ZYSZEZECZES
Power ConfigurationMcTPMTMTPMc
Power UnitsUnit 1Unit 2Unit 3
Capacity16+328445+148481846+50
Capacity25+2885756385855+40
  • ^1 Set Nº. 1501~1510
  • ^2 Set Nº. 1511~1585

Distribution

[edit]

As of April 2018, 260 CRH1 series EMU and 85 CRH380D series EMU are in service.

OperatorQuantitySerial numberDepotLines servingNotes
CRH1A
CR Guangzhou221001~1020, 1167~1168Guangzhou EastGuangzhou–Shenzhen Railway,Guangzhou–Zhuhai Intercity Railway,

Guangshengang XRL

311086~1090, 1094~1104, 1106~1109, 1117~1119, 1123~1124, 1141~1143, 1154, 1165~1166Shenzhen NorthHangzhou–Fuzhou–Shenzhen High-Speed Railway
CR Nanchang181121, 1122, 1125~1140FuzhouHangzhou–Fuzhou–Shenzhen High-Speed Railway,Longyan–Xiamen Railway,Xiangtang–Putian Railway
171147~1153, 1155~1164Fuzhou South
171081~1085, 1091~1093, 1105, 1110~1116, 1120Xiamen North
CR Chengdu231021~1040, 1144~1146Chengdu EastChengdu–Dujiangyan Intercity Railway,Dazhou–Chengdu Railway,Shanghai–Wuhan–Chengdu High-Speed Railway,Chongqing–Lanzhou Railway
CRH1A-A
CR Guangzhou41169, 1234~1236Guangzhou EastGuangzhou–Shenzhen Railway
91170~1176, 1217, 1218Shenzhen NorthHangzhou–Fuzhou–Shenzhen High-Speed Railway
161177, 1179~1181, 1183, 1184, 1209~1216, 1248, 1250SanyaHainan Eastern Ring High-Speed Railway,Hainan Western Ring High-Speed Railway
331182, 1219~1228, 1237~1247, 1249, 1251~1260FoshanGuiyang–Guangzhou High-Speed Railway,Nanning–Guangzhou High-Speed Railway,Chongqing–Guiyang high-speed railway,Shanghai–Wuhan–Chengdu high-speed railway,Chengdu–Chongqing intercity railway
CR Nanchang241185~1208Fuzhou SouthHangzhou–Fuzhou–Shenzhen High-Speed Railway,Longyan–Xiamen Railway,Hefei–Fuzhou High-Speed Railway
CRH1B
CR Shanghai131052~1059, 1076~1080NanxiangShanghai–Hangzhou High-Speed Railway,Hangzhou–Fuzhou–Shenzhen High-Speed Railway,Shanghai–Wuhan–Chengdu High-Speed Railway
111041~1045, 1047~1051, 1060HangzhouNanjing–Hangzhou High-Speed Railway,Shanghai–Wuhan–Chengdu High-Speed Railway,Shanghai–Hangzhou High-Speed Railway,Hangzhou–Fuzhou–Shenzhen High-Speed Railway
China Railway11046RetiredWritten off afterWenzhou train collision, Cars 1-12 are used as a training train whereas Cars 13-16 were scrapped due to derailment.
CRH1E
CR Shanghai201061~1075, 1229~1233NanxiangShanghai–Wuhan–Chengdu High-Speed Railway,Shanghai–Hangzhou High-Speed Railway,Hangzhou–Fuzhou–Shenzhen High-Speed Railway,Guangzhou–Shenzhen–Hong Kong Express Rail Link,Nanning–Guangzhou High-Speed Railway
CRH380D
CR Chengdu131538~1545, 1550, 1552, 1553, 1555, 1557Chongqing NorthChengdu–Chongqing Intercity Railway
221546~1549, 1554, 1556, 1558~1560, 1563, 1564, 1567, 1568, 1571, 1572, 1578~1584Chengdu East
21537, 1551Guiyang NorthChengdu–Chongqing Intercity Railway,Chongqing–Guiyang high-speed railway,Shanghai–Kunming High-Speed Railway
CR Shanghai481501~1536, 1561, 1562, 1565, 1566, 1569, 1570, 1573~1577, 1585Shanghai NanxiangNanjing–Hangzhou High-Speed Railway,Shanghai–Nanjing Intercity Railway,Hangzhou–Fuzhou–Shenzhen High-Speed Railway,Shanghai–Kunming High-Speed Railway

See also

[edit]
Wikimedia Commons has media related toChina Railway CRH1.

References

[edit]
  1. ^Briginshaw, David (15 July 2015)."Latest Chinese high-speed train enters service".International Railway Journal. Retrieved29 February 2016.
  2. ^"Transportation documents"(PDF).bombardier.com. Archived fromthe original(PDF) on 2017-04-21. Retrieved2016-02-29.
  3. ^ab"Sleeper EMU to be developed under co-operation deal".Railway Gazette International. 2007-08-01. Retrieved2007-12-14.
  4. ^"China orders another 40 CRH1 high-speed trains - International Railway Journal". 2010-07-22. Retrieved2010-07-22.an additional 40 CRH 1 eight-car
  5. ^ab"High speed trainsets take shape".Railway Gazette International. 2005-08-01. Retrieved2009-10-20.
  6. ^2006年8月30日 BSP 第一列EMU 动车组出厂Archived 2011-07-08 at theWayback Machine
  7. ^"Successful completion of the type test for BST's first 250km/h 8-consist EMU". BST. 2010-11-10. Archived fromthe original on 2011-07-07.
  8. ^abLtd, DVV Media International."Zefiro 250NG included in revised high speed train contract".
  9. ^abStaff (2007-11-01)."Bombardier JV awarded contract for 40 high-speed trainsets in China".oneindia.com. Retrieved2020-06-08.
  10. ^The New High Speed Superpowerwww.eurotrib.com
  11. ^"添加插座、新增母婴设施 成渝高铁380D动车尽显人性化 - 四川网络广播电视台 - 四川广播电视台". 2016-04-21. Archived fromthe original on 2016-04-21. Retrieved2020-06-08.

External links

[edit]
High-speed demonstrativemaglev
Coastal
Hangshen
parallel
other branches
Beijing–Shanghai
West route
East route
branches
Beijing–Hong Kong (Taipei)§
ToHong Kong
ToTaipei
Harbin–Hong Kong (Macau)§
Hohhot–Nanning
Beijing–Kunming
Branch lines
Baotou (Yinchuan)–Hainan
Lanzhou (Xining)–Guangzhou
Suifenhe–Manzhouli
Beijing–Lanzhou
Qingdao–Yinchuan
Eurasia Continental
Yangtze River
Old line
Shanghai–Kunming
Xiamen–Chongqing
Guangzhou–Kunming
Intercity and
long-distance
North China
Northeast China
East China
Central and South China
Northwest China
Southwest China
Intercity railway
networks
Upgraded lines with
operating speeds
≥ 200 km (120 mi)
  • Italics: under construction or currently not operational
  • (-), Place A-: section under construction or currently not operational
  • §: in/related to Hong Kong, Macau, Taiwan
  • (Place A–Place B): share tracks with other lines
Technologies
Proposed
High-speed trains
by service speed
or planned service speed
400 km/h
(249 mph)
or more
350–399 km/h
(217–248 mph)
300–349 km/h
(186–217 mph)
250–299 km/h
(155–186 mph)
200–249 km/h
(124–155 mph)
High-speed railway line
By countries and territories

planned networks in italics
Africa
Americas
Asia
Europe
Oceania
Multiple units of China Railway
Centralized Power
Pre-CRH era
Fuxing EMU
Distributed Power
Pre-CRH era
CRH
200-250km/h
350-380km/h
Others
Intercity multiple units
CJ-series intercity units
CRH intercity EMU
Fuxing EMU
200-300km/h
300-400km/h
400-450km/h
Centralized Power
Distributed Power
S = single set
Retrieved from "https://en.wikipedia.org/w/index.php?title=China_Railway_CRH1&oldid=1280171095#CRH380D"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp