Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

COWI A/S

From Wikipedia, the free encyclopedia
(Redirected fromCOWI)
Danish consulting group
This articlecontainspromotional content. Please helpimprove it by removingpromotional language and inappropriateexternal links, and by adding encyclopedic text written from aneutral point of view.(June 2023) (Learn how and when to remove this message)
COWI A/S
COWI headquarters
Company typePrivate
IndustryConsulting
Founded1930; 95 years ago (1930)
FounderChristen Ostenfeld
Headquarters,
Key people
Jens Højgaard Christoffersen (CEO)
ServicesEngineering,environmental science andeconomics
Revenue 985 million (2022)[1]
€ 33 million (2022)[1]
€ 22 million (2022)[1]
Total assets€ 498 million (2022)[1]
Total equity€ 203 million (2022)[1]
OwnerCOWIfonden (the COWIfoundation) (85%)[2]Present and Former Employees (15%)[3]
Number of employees
7,156 (2022)[3]
Websitewww.cowi.com

COWI A/S is an internationalconsulting group, specializing inengineering,environmental science andeconomics, with headquarters located inLyngby,Denmark.

It has been involved in more than 50,000 projects in 175 countries and has approximately 7,300 employees, includingengineers,biologists,geologists,economists,surveyors,anthropologists,sociologists andarchitects.[4]

History

[edit]

COWI was founded in 1930 bycivil engineer Christen Ostenfeld inCopenhagen.[5][6] Prior to establishing the business, Ostenfeld had spent several years in both France and Switzerland, during which time he developed an international outlook, independence and close cooperation with the research community that helped shape the future business.[6] During 1931, Ostenfeld was hired to reconstruct Copenhagen's run-down Scala Theatre; having only a short timeframe to conduct the work, he opted to useprefabricated steel elements that did not need anyscaffolding to speed up construction. The company's first international project was undertaken in 1935 with the design of the Danish pavilion for theBrussels International Exposition of 1935, which made extensive use of prefabricated locally-harvestedpinewood.[6]

Throughout the 1930s, the firm specialised in construction projects with prefabricated elements and long-span roofs.[6] It was also involved in the design of various bridges; the company's first major undertaking in this sector was theAggersund bridge. Built for the Danish state under aprivate tender and opened in 1942, the bridge's design was influenced by modern techniques acquired inCzechoslovakia.[6] Other innovative techniques and technologies were acquired throughout the 1940s, one such innovation beingprestressed concrete; the original techniques, acquired from France, were further improved by the company and adapted to suit the colder Danish climate. Countless future undertakings by the firm made use of prestressed concrete construction, such as the world's first prestressed concretesilo (1956).[6][7] Another innovation, created by Ostenfeld and Lauritz Bjerrum, was a telescopic drill that measured ground pressure to work out the bearing capacity of deep soil layers.[8]

The business was heavily impacted by theInvasion of Denmark byNazi Germany.[8] The company's resources wererationed as the Danish government placed all design work on hold, placing the company's future at jeopardy. Ostenfeld personally travelled across the nation, lobbying for the most important projects to be kept going.[8] Governmentsubsidies were granted for the design of various civil engineering projects in preparation for thepostwar years, which permitted the business to continue its engineering activities as well to get a valuable lead on planning work. As soon as theconflict ended, various construction projects were quickly launched and contact was re-established with the company's international colleagues as it became safe to freely communicate and travel once again.[8]

During 1946, Wriborg W. Jønson became an equal partner in the business.[6] The initials of the two senior partners lent the company its name; between 1946 and 1973, the company operated as a partnership under the name ofChr. Ostenfeld & W. Jønson (often shortened toO&J. During the 1950s, the company began to expand internationally; by 1953, a quarter of all turnover was being generated outside Denmark.[6][9] Its first international office was established inParis in response to the large and lucrative market opportunities for silos in France. During 1957, O&J designed theFredrikstad Bridge in Norway, which was the company's first large bridge outside Denmark.[6][9]

An increasing variety of projects were undertaken by the company throughout the 1960s following a considerable uptick in orders. In addition to regular silo work, it was involved in the building ofTamale Airport in Ghana, the Danish Embassy in Paris, a nuclear research facility in Geneva, theLittle Belt Bridge in Denmark, renovated government facilities inBahrain, numerous dams and bridges across the Middle East, and residential housing onpermafrost inGreenland.[10] One scheme, a motorway project betweenBaghdad and the Turkish border, had to be abandoned following the outbreak of theIran-Iraq War. By the end of the decade, the firm had no less than 400 employees, a quarter of which were based outside Denmark.[10]

During 1972, Ostenfeld retired from the firm; in the following year, the company's ownership was transferred to a foundation chaired by Wriborg Jønson and a new name was adopted "COWIconsult, Rådgivende Ingeniører A/S", ("COWIconsult, Consulting Engineers and Planners A/S") that was based on the two senior partners’ initials.[11] Across the 1970s, in response to theenergy crises of this decade, the company broadened its horizon from specialising primarily in bridges and structural engineering to building in the fields of energy and environment, such ascombined heat and power. Among other environmental issues, it moved into withwater treatment,waste management andair pollution, gradually becoming an established environmental consultant, working with local authorities, utility companies, and businesses alike in this capacity.[11] In collaboration with theWorld Bank and theUnited Nations Development Programme, it has worked on numerous projects in developing countries such as Nigeria, Kenya and Swaziland.[11] By 1979, COWIconsult has more than 800 staff, and a third of its turnover is generated outside of Denmark.[11]

In 1995, the company was renamed once again to the current COWI A/S. By this point, it had developed into a full-service consultant in social analysis, urban development, transport and welfare.

During the new millennium, a number of strategic acquisitions were made in Scandinavia and the UK, significantly increasing the number of employees and undertakings of the business. In 2008, the firm boughtFlint & Neill, a UK civil and structural engineering consultancy specialising in bridges.[12] In November 2014, the firm acquired Donaldson Associates Ltd, a UK base tunneling specialist company; at the time of acquisition, Donaldson Associates Ltd had 150 staff, operating from five UK offices and one international office in Hong Kong.[13][14] In November 2018, the firm acquired the Danish architecture firmArkitema Architects; it was the largest acquisition by COWI at that time.[15][16][17]

In early 2022, COWI acquired US-basedFinley Engineering Group.[18][19] That same year, COWI announced that the company will no longer participate in tenders for newfossil energy projects.[20][21]

Ownership

[edit]

COWI Holding A/S is an unlisted Danish public limited liability company jointly owned by the COWIfonden (the COWIfoundation) holding 85% of shares with the remaining 15% of company shares held by current and former employees from eight countries where COWI operates. The company regards employee shareholders as co-owners. The current company structure was adapted in 2010.[2]

Sustainability

[edit]

With the rise of awareness about the climate crisis, COWI prioritised the need for action through overall organisational change.[22] In 2022, COWI developed and adopted a new vision and strategy called FUTURE-NOW[23] that puts sustainability at the centre of the company. The strategy works to accelerate the green transition and means that COWI became the first among engineering consultancies to stop taking on fossil fuel projects. Instead, COWI now allocates all resources to projects that move its customers towards sustainability. The goal is that 100 per cent of COWI's revenue must come from projects driving sustainability. COWI has established sustainability targets.[24]

See also

[edit]

References

[edit]
  1. ^abcde"Annual Reports and Key Figures". COWI. Retrieved26 April 2023.
  2. ^ab"Organisation, ownership, and investor relations". COWI A/S. Retrieved1 June 2023./
  3. ^ab"Meet our employees". COWI A/S. Archived fromthe original on 9 July 2021. Retrieved8 June 2023./
  4. ^"Facts and figures - the quick version". COWI. Archived fromthe original on 12 January 2018. Retrieved22 September 2016.
  5. ^"1930 - 1940: A nightclub – the first step towards an international company". COWI. Archived fromthe original on 15 March 2008. Retrieved3 February 2009.
  6. ^abcdefghi"Who we are". COWI. Retrieved6 July 2024.
  7. ^"1945 - 1950: New technology secures leading international position". COWI. Archived fromthe original on 17 March 2008. Retrieved3 February 2009.
  8. ^abcd"1940 - 1945: New Development Shelved". COWI. Archived fromthe original on 17 March 2008. Retrieved3 February 2009.
  9. ^ab"1950 - 1960: The silos continue their triumphal march". COWI. Archived fromthe original on 17 March 2008. Retrieved3 February 2009.
  10. ^ab"1960 - 1970: Rapid growth and worldwide challenges". COWI. Archived fromthe original on 17 March 2008. Retrieved3 February 2009.
  11. ^abcd"1970 - 1980: Focus on the environment". COWI. Archived fromthe original on 17 March 2008. Retrieved3 February 2009.
  12. ^Barber, Marc (5 December 2008)."COWI builds bridges with engineering deal".
  13. ^"Rebrand creates one COWI in the UK". Infrastructure Intelligence. Retrieved12 May 2020.
  14. ^"Cowi renames Donaldson and Flint & Neill".theconstructionindex.co.uk. 6 January 2017.
  15. ^"Cowi Acquires Arkitema: "It Does Not Stop Here"".nordicpropertynews.com. Retrieved6 July 2024.
  16. ^Goodale, Morrissey (30 November 2018)."Weekly merger, acquisition, deal update: November 29".csemag.com.
  17. ^"Cowi satisfied with H1 progress; eyes 'booming' UK market".environment-analyst.com. 11 September 2020.
  18. ^"COWI acquires award-winning FINLEY Engineering Group". COWI.
  19. ^"Cowi acquires complex bridge specialists Finley Engineering Group". New Civil Engineer. 26 April 2022.
  20. ^Buljan, Adrijana (27 January 2022)."COWI Puts Its Foot Down on New Fossil Fuel Projects, Welcomes Offshore Wind and Green Hydrogen".offshorewind.biz.
  21. ^HORGAN, ROB (25 January 2022)."Cowi follows Arup's lead and shuns all fossil fuel projects". New Civil Engineer.
  22. ^"Sustainability in COWI".COWI. COWI A/S. RetrievedJune 1, 2023./
  23. ^"Our Strategy FUTURE-NOW".COWI. COWI A/S. RetrievedJune 1, 2023./
  24. ^"Sustainability reports".COWI. COWI A/S. RetrievedJune 1, 2023./

External links

[edit]
Wikimedia Commons has media related toCOWI.
Authority control databasesEdit this at Wikidata
Retrieved from "https://en.wikipedia.org/w/index.php?title=COWI_A/S&oldid=1315894849"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp