This article has multiple issues. Please helpimprove it or discuss these issues on thetalk page.(Learn how and when to remove these messages) (Learn how and when to remove this message)
|
| A 4 | ||||
|---|---|---|---|---|
| Bundesautobahn 4 | ||||
| Route information | ||||
| Length | 616 km[citation needed] (383 mi) | |||
| Existed | 1934–present | |||
| Location | ||||
| Country | Germany | |||
| States | North Rhine-Westphalia,Hesse,Saxony,Thuringia | |||
| Highway system | ||||
| ||||
| ||||

Bundesautobahn 4 (translates fromGerman asFederal Motorway 4, short formAutobahn 4, abbreviated asBAB 4 orA 4) is anautobahn in two discontinuous segments that crossesGermany in a west–east direction. The western segment has a length of 156 km (97 mi), while the part in the east is 429 km (267 mi) long.
The western A 4 starts north-west ofAachen, where theDutch A76 enters Germany. Initially it is 2 lanes each way with no speed limit. From Kreuz Aachen toDüren and fromKerpen to Refrath (between Refrath and Köln-Merheim) westbound the hard shoulder becomes the third lane at peak times. Between Kreuz Köln-West and Kreuz Heumar it forms the southern part of theCologne Beltway (Kölner Autobahnring). The rest of the section between Kreuz Aachen and Kreuz Köln-West has a variable speed limit. Between Merzenich and Elsdorf, the speed limit is 130 km/h.[1] Between Kreuz Köln-West and Kreuz Heumar the speed limit is 120 km/h. From Kreuz Köln-Ost to Refrath the maximum speed is 100 km/h. The westbound section between Köln-Merheim and Kreuz Köln-Ost is restricted to 80 km/h. The section between Refrath and the terminus at Krombach has no speed limit. Between Untereschbach and Refrath westbound the limit is 100 km/h weekdays. It is mostly 2 lanes each way, but between Untereschbach and Wiehl, several climbing lanes operate in both directions.
The eastern part starts at the Kirchheim intersection (with theA 7) and goes throughEisenach,Gotha,Erfurt,Weimar,Jena,Gera,Chemnitz,Dresden andBautzen toGörlitz, where it crosses to Poland and continues asA4.
The westernmost 11 kilometers of the A4 form the most easterly stretch of theEuropean route E314: continuing east from the Aachen interchange (Kreuz Aachen), the A4 is part ofEuropean route E40. European routes don't have gaps and E 40 followsA 45 andA 5, which is a suitable route past the gap of A4.
In 1927, the first ideas planned connections between Aachen and Cologne, and additional connections between Erfurt and Breslau (Silesia). The first sections were built from 1934 to 1937 (between Chemnitz and Dresden).
Just west ofEisenach was theWartha-Herleshausen border checkpoint betweenEast andWest Germany. Eight kilometers down the road, after the Wommen interchange, the road crosses back into the former East Germany intoGerstungen (today inThuringia) for seven kilometers before crossing back to the former West Germany atWildeck. Because of that, the section between Wommen and Wildeck-Obersuhl interchanges was closed and fell into decay during theCold War. It was bypassed by B 400. Ironically, that section, built in 1943, was the lastReichsautobahn section built before the end of World War II.[2]
The Wildeck-Obersuhl interchange was built only after the war, due to the Gerstungen interchange being exactly on the border.[3] Repairs of those parts were scheduled to be completed in 2007.
In 1999, the new tunnel atKönigshain Hills (near Görlitz) was opened. In 2014, the section of A 4 between Cologne and Aachen was rerouted on a new 17 km highway section near Kerpen. The abandonment of the old route was due to the expansion of coal mining in the Hambach open-pit mine.[4]
Reconstruction of the last section inThuringia between Eisenach and Gotha near the formerInner German Border began in 2007 and required building 25 km (16 mi) of new road.[5]

The "Wiehltalbrücke" is a bridge that carries the A4 across the valley of the riverWiehl. The A4 nearGummersbach,North Rhine-Westphalia was the site of the then-most expensive traffic accident in German history: On 26 August 2004, aBMW M3, whose driver had no driving license and was later found to bedriving under the influence, collided with a truck carrying 33,000 litres ofgasoline. The truck crashed through a guardrail, fell off the Wiehltalbrücke and exploded, killing the driver. The subsequent fire caused severe structural damage to the bridge. The BMW driver was jailed for 22 months.[6]
The bridge was closed for weeks until temporary repairs were completed. Permanent repairs finished on 22 August 2006, using a method never before used in Germany.[7] Among other things a 20 m × 31 m segment was replaced while the bridge was closed. The repairs cost €7.2 million.