Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Borderlands line

From Wikipedia, the free encyclopedia
Railway line between Bidston, England and Wrexham, Wales
Not to be confused withBorders Railway.
"Mid Wirral line" redirects here; not to be confused withWirral line.

Borderlands line
AClass 150DMU on the Borderlands line near Bidston
Overview
Other names
  • Bidston–Wrexham line
  • Wrexham–Bidston line
  • Wrexham–Liverpool line (since 2025)
Native name
  • Llinell y Gororau
  • Lein y Gororau
  • Llinell Wrecsam–Bidston
  • Llinell Wrecsam–Lerpwl (since 2025)
StatusOpen to passenger and freight use
OwnerNetwork Rail
Locale
Termini
Connecting lines
Stations15, withWrexham General andShotton as interchanges with mainline services, andBidston connecting withMerseyrail
Service
TypeHeavy rail
SystemNational Rail
Wales and Borders franchise
Operator(s)Transport for Wales
Rolling stock
Technical
Line length27 mi (43 km)
Number of tracksDouble track throughout except Wrexham General to Wrexham Central
Track gauge4 ft 8+12 in (1,435 mm)standard gauge
Route map
BidstonMerseyrail
Bidston Sidings
Upton
Woodchurch(proposed)
Storeton
Heswall
Neston
Burton Point
England
Wales
border
Sealand Rifle Range Halt
Birkenhead Junction Golf Club Platform
 
Shotton Paper
Deeside Parkway(proposed)
Deeside Industrial Park
Chester Golf Club Halt
Hawarden Bridge
Shotton
North Wales Coast Line
Hawarden
Buckley
Castle Cement
Hope Exchange
Chester–Denbigh line
Penyffordd Sidings
Penyffordd
Hope
Caergwrle
Cefn-y-Bedd
Cegidog Viaduct
overRiver Cegidog
Gwersyllt
Gwersyllt Junction
WM&CQ Brymbo branch
Rhosddu Halt
Wrexham General
Wrexham Central
Show route diagram

TheBorderlands line (Welsh:Llinell y Gororau[2] orLein y Gororau), also known as theBidston–Wrexham orWrexham–Bidston[i] line, is a railway line betweenBidston on theWirral Peninsula in England andWrexham Central in thenorth-east of Wales. Passenger train services are part of theWales & Borders franchise and are operated byTransport for Wales Rail. The line connects to theMerseyrail network at Bidston, theNorth Wales Coast Line atShotton and theShrewsbury–Chester line atWrexham General. Parts of the line in Wales are used by freight trains, serving Deeside Industrial Park and theHanson Cement works to the south ofBuckley.

The line is part of Transport for Wales'North Wales Metro improvement programme and is also referred to in England as theMid Wirral line,[3] as part of the line runs in the middle of the Wirral peninsula.

The line is operated by theClass 230[4] and theClass 197.[5]

There have been various proposals for the line to be fully or partially integrated with the electrified Merseyrail network to increase services towards Liverpool. Past proposals for electrification on the line were deemed unfeasible due to costs. The potential introduction of Merseyrail'sClass 777 on the line could expand services on the line into Liverpool.

In May 2025, as part of the announced Network North Wales programme, the Welsh government announced they would refer to the line as theWrexham–Liverpool line (Welsh:Llinell Wrecsam–Lerpwl).

Operations

[edit]
Logo for the line displayed outside Wrexham General

Freight services

[edit]

The line is used byfreight trains at its southern end in Wales, serving Deeside Industrial Park and theHanson Cement works south ofBuckley. Amongst the biggest users of freight was theShotton steelworks which received imported iron ore from Birkenhead'sBidston Dock, until the closure of the steelworks in 1980.[6][7]

Passenger rail franchise

[edit]

Uponprivatisation,passenger services were transferred fromRegional Railways toNorth West Trains, later known as First North Western. In 2003, a review led to the creation of theAll-Wales Franchise, meaning services were transferred toWales & Borders Trains.Arriva Trains Wales succeeded Wales & Borders on 8 December 2003, and operated all passenger services on the line until October 2018.KeolisAmey Wales (trading as Transport for Wales) then began its franchise until February 2021, when publicly-ownedTransport for Wales Rail took over. Potential electrification plans could see the line transfer toMerseyrail.[8]

Passenger services

[edit]

Transport for Wales is currently the only passenger train operator on the line. There are proposals for Merseyrail to fully or partly operate on the line.

In their December 2021 to May 2022 timetable,[9] Transport for Wales operated 1 train per hour (tph) Monday to Saturday, and on Sundays services were mainly hourly with some every 1 hour and 30 minutes. Not all services terminated at Wrexham Central; some terminated at Wrexham General to enable cab cleaning, service turnaround time, or recovering delays.[10] In the May to December 2022 timetable,[11] the frequency remained at mainly 1tph, with all but the first morning and last evening service on weekdays, and two morning and two evening services on Sundays, stopping at Wrexham Central.

There are three interchange stations on the line, connecting to other railway lines and services. They are (north to south):

Holders of theTransport for Wales Concessionary Travel Pass can travel free along part of the line, from Wrexham Central toHawarden Bridge.[12] Holders of theMerseytravel Concessionary Travel Pass can travel free along the section of the line that runs through Merseyside, fromHeswall to Bidston.

In December 2021, more than 500 people signed aChange.orgpetition calling for a direct service between Heswall and Liverpool.[13][14]

The line is designated as acommunity rail partnership.[15]

In spring 2023, some services were suspended after Transport for Wales transferred trains to other parts of their network. In June 2023, Transport for Wales committed to improve services on the line, withLee Waters, Welsh minister responsible for transport, apologising for the issues. Class 230s were introduced in April 2023, although they were not running on-time and experiencing "teething" problems.[16]

Recent service developments
[edit]

It was initially proposed in 2018, that Transport for Wales would double the line's frequency to 2tph, starting from December 2021,[10] using the newly-introduced Class 230 trains. In September 2021, this was delayed to May 2022.[10] In May 2022, the planned timetable with the increased service was revised with the additional services removed,[11] therefore any increase in frequency was scrapped for May 2022[17] and services remained largely unchanged from the existing timetable at roughly 1tph until December 2022.

In March 2021, Transport for Wales pledged toFlintshire councillors that the line's services would increase to 4tph and extend into Liverpool.[18][19] The line's ageing track and signalling would also be replaced to allow for faster and more frequent trains. TfW also pledged to upgrade the facilities at the "fairly basic" stations on the line.[18]

GB Railfreight (GBRf) operate freight trains to Hanson Cement nearPenyffordd. GBRf formally objected to the increase in passenger train services on the line as it would conflict with the freight operator's new daytime freight traffic to and fromPadeswood.[17][20] The operator claimed that the new freight service would block the northbound line between Penyffordd and Buckley for 30 minutes due to the splitting of trains into and out of the shortsidings.[17][21]

Both TfW and GBRf have applied to theOffice of Rail and Road (ORR) for use of capacity on the line.[17] Transport for Wales Rail was seeking additional rights to operate a 2tph service on the line.[21] Analysis by Network Rail taken in June 2020 concluded that a 2tph service could not be operated regularly in conjunction with freight services, therefore they would not support the awarding of access rights to TfW.[21]Local councillors in Wrexham and the Wrexham-Bidston Rail Users' Association voiced concerns that the conflicting applications could jeopardise the planned increase in frequency to 2tph.[22][23]

On 30 November 2022, the ORR approved TfW's 2tph passenger service increase.[24]

In May 2025,Ken Skates, theWelsh GovernmentCabinet Secretary for Transport, announced theirNetwork North Wales programme to develop the line. As part of the plans, it was announced they would refer to the line as the "Wrexham–Liverpool line" over the "Borderlands line", as well as developing its services. The programme aims to increase train services on the line from Wrexham to Bidston to 2tph within three years following the completion of rail line works at Padeswood. They further aim to increase direct services to Liverpool and up to 4tph by 2035. "Pay as You Go" systems are be introduced along the entire line, with stations improved over 12 months and trains "wrapped" to reflect local communities and football clubs along the line. They also plan to advance development of thestation at Deeside Industrial Park to determine its feasibility and test demand.[25][26]

Infrastructure history

[edit]
Further information:Wrexham, Mold and Connah's Quay Railway
Borderlands line diagram

The southern part of the line was built by theWrexham, Mold and Connah's Quay Railway (WMCQR) in 1864 and the northern part by theNorth Wales and Liverpool Railway, a joint committee of the WMCQR and theManchester, Sheffield and Lincolnshire Railway in 1896. The North Wales and Liverpool Railway northern terminus was at Bidston with the southern terminus atHawarden Bridge[27] Both railways were acquired by theGreat Central Railway on 1 January 1905.

Two Wirral stations on the line closed in the 1950s;Storeton in 1951 andBurton Point in 1955. No trace of the station at Storeton remains, yet Burton Point station is still almost entirely intact, the station buildings currently forming part of a garden centre.[28] Further south, the high level platforms ofHope Exchange closed in 1958.[29]

The northern terminal of the Borderlands Line has been at four stations at various times: Bidston,Birkenhead North,Birkenhead Park (briefly in the late 60s),New Brighton andSeacombe.[30][31]

Development

[edit]

The doubling of the journey frequency on the line is one of the aims of the Growth Track 360 group, a consortium of business, politicians and public sector leaders. The group aims to improve transport and create jobs in the North Wales, Merseyside and Cheshire area over the next 20 years.[32] In the 2017 Autumn budget, ChancellorPhilip Hammond stated that part of the additional £1.2 billion funding Wales was receiving would be used to look into proposals to improve journey times on the line and developing a business case.[33]

In October 2019, Transport for Wales announced £280,000 had been allocated to revamp stations along the line in north Wales, Cheshire and Merseyside, as part of TfW's £194 million station improvement programme.[34][35]

Proposed new stations

[edit]

New stations at Deeside Industrial Park (to be calledDeeside Parkway),Woodchurch andBeechwood have been proposed.[36] The route was mentioned in Merseytravel's proposed 30-year plan of 2014.

"New stations at Beechwood and Woodchurch in Birkenhead (the latter "would be around junction 3 of theM53, thePrenton/Oxton side") and Deeside Industrial Park. These changes would "Incorporate the line into the Merseyrail Wirral line to provide direct connectivity with Liverpool city centre."[37]

The draft of the Network Rail Welsh Route Study in March 2015 contained several suggestions for improving services on the line, including:.[38]

  • Replacing the High and Low levels at Shotton station with a dedicated interchange station, improving connectivity between the North Wales Coast Main Line & the Borderlands line
  • The removal of level crossings to improve line speed.

Proposed electrification

[edit]

There have been proposals for the full or partial electrification of the line since 1999 with participation ofMerseytravel and thedevolved institutions in Wales.[ii] Such electrification is usually intertwined with proposals for the full incorporation of the line into the electrified Merseyrail network, allowing for services from either Wrexham Central or partway along the line to travel all the way to Birkenhead and Liverpool Central.[36][39]

In 2008, aNetwork Rail study estimated the cost forthird-rail electrification of the entire line to be £207 million.[40] To lower costs, Merseytravel suggestedoverhead-wire electrification as an alternative, bringing estimates down to £66 million. However, this would mean trains running between Wrexham and Liverpool would have to be compatible with both electric systems, therefore incompatible with the third-rail only trains in use at the time.[41][42][43]

There is political support to electrify the line from both Welsh and Merseyside authorities, but the responsibility of rail infrastructure lies with theUK Government'sDepartment for Transport.[44] TheWelsh Government aims to increase services betweenNorth Wales and Merseyside, in particular Wrexham andDeeside with Liverpool andLiverpool John Lennon Airport.[45] Whereas Merseyside authorities would like to increase services to stations on the line on theWirral Peninsula in particular, as well as the rest of the line.

In 2016, a working group was set up to examine improving the line, including proposals to increase the frequency of trains on the line. It was hoped that an increase in the number of passengers would improve the case for electrification.[46][47]

Alternatives to electrification

[edit]

In 2017, Merseyside councillor Liam Robinson stated that passenger use on the line had increased 75% over the previous decade but electrification was still a long-term aspiration. He also stated that the newClass 777 rolling stock, which can operate on overhead wires, third rail or batteries was being procured for Merseyrail, and could run on the line. The Class 777 trains could extend the line into the Liverpool and Birkenhead tunnels and stations.[48]

Welsh Government minister,Lee Waters, revealed in April 2023 that Transport for Wales have a Memorandum of Understanding with theLiverpool City Region Combined Authority to work collaboratively to increase connectivity between the two regions.[49]

Rolling stock

[edit]

The line was operated usingClass 150DMUs, howeverBi-modal battery electric dieselClass 230s operated by Transport for Wales entered passenger service on the line on 3 April 2023.[50][51][52] They were originally set to enter service in May 2022 in conjunction with a possible increase in service frequency.[iii][17][53][54][55] On 1 July 2022, TfW announced that theClass 197s would be used on the line.[56][57][58] The long-delayed 230s had its staff training suspended following a battery-related incident in April 2022, TfW stated they had targeted a late 2022 introduction as they aimed to restart the 230s' staff training programme in August 2022.[59][60]

Battery trains

[edit]
British Rail Class 230 battery-diesel hybrid atStourbridge Junction, was introduced on the line by TfW

It had been proposed to use trains that receive energy from batteries and an electric pick-up on both unelectrified and electrified sections of the track. This would reduce the need for full line electrification.[38]

A trial of a convertedElectrostar train using energy from overhead wires and batteries when on non-electrified sections of track was undertaken in January and February 2015 on theMayflower line. The train travelled up to 60 miles on energy stored in the batteries also recharging the batteries via the overhead wires when on electrified track, at stations and via brake regeneration.[61] A month later in March 2015, the introduction ofbattery powered trains was proposed for the Borderlands line by Network Rail.[38]

The Network Rail document suggested that consideration had been given to electrification and to extending the terminus from Bidston further into Birkenhead for greater connectivity. However these options were expressed as offering low value for money. The document proposes that using battery powered rolling stock precluding full electrification of the line, provides a cheaper method of increasing connectivity and extending the service into the electrified Birkenhead and Liverpool sections of the Wirral line. From the document:

"In the longer term, potential deployment of rolling stock with the ability to operate on battery power for part of their journey may provide the ability in an affordable manner to improve the service offering between the Wrexham – Bidston route and Liverpool."[38]

Class 230

[edit]

It was announced in June 2018 that refurbishedClass 230 trains, which use formerLondon Underground D78 Stocktrain bogies and aluminium bodyshells with battery power plants and a diesel engine as a failsafe, were to be introduced between Wrexham and Bidston.[54][55] Initially hoped for a mid-2019,[62] then a December 2019[62] introduction, the trains were delivered byVivarail to Transport for Wales in July 2020.[17][63] The trains were later passed for passenger use for a 2020 introduction, but delayed initially to May 2022.[53] In July 2021, one unit caught fire near Wrexham Central.[64] In April 2022, Transport for Wales stated it continued to aim for a May 2022 introduction,[17][23] but by mid-May, no Class 230 trains were introduced and the extra services planned to use Class 230s were later removed from the May 2022 timetable.[17][11] Transport for Wales states that earlier delays to the introduction of the new trains were due to (aside the COVID-19 pandemic) "technical issues" such as fires on some of the tested trains and battery-related issues (such as a battery-related "thermal" issue in April 2022) impacting staff training, with the sheer length of a pause in training meant staff would have to re-do training.[17][65][59] Asocial media interaction onTwitter resulted in Transport for Wales' Twitter manager stating that the trains are set to be introduced "in the next year" (2023).[17] Deeside.com and Wrexham.com, local news websites, stated there is speculation that Transport for Wales have bought or leasedClass 150s from anothertrain operating company for the planned increase in services on the line.[17]

The trains were scheduled to start operating on the line in May 2022, however, on 24 May 2022, the newClass 197s were spotted for compatibility testing on the line.[65] Class 197s were not announced to be on the Borderlands line prior to the missed May 2022 introduction of the Class 230s.[65] Class 197s were intended to only run long-distance services on the whole Wales & Borders network, which the Borderlands line does not interact with.[65]

On 4 July 2022, TfW admitted battery-related "thermal issues" were the cause of the train's delayed introduction. TfW stated they have largely rectified the problem. The pausing of the staff training programme for a prolonged period of time, due to the incident, has led to staff being required to redo training.[59] The class 230 trains were introduced in fare paying service in April 2023.[66]

Following their introduction, the trains by June 2023, were still not running to their timetabled times, experiencing "minor technical issues" and "teething" problems.[16][67] This was later stated to be due topollen blocking engine filters.[68] Following the issues with the services,Mark Isherwood, North Wales MS, had called for an operator other than Transport for Wales to operate the line, criticising TfW's management of services on the line.[69]

There are aspirations to extend services from Bidston onto the Merseyrail Wirral Line taking trains into the Birkenhead and Liverpool underground sections.[70]

Alternative future trains

[edit]
A Class 197 at Llandudno Junction, on theNorth Wales Coast Line, north-west Wales in October 2021

Class 197s

[edit]

On 1 July 2022, Transport for Wales announced that the Class 197s would be operating on the line when they are eventually introduced to the widerWales and Borders rail network.[56][57] The class were not initially announced to be operating on the line when they first entered testing in late 2021, with Transport for Wales stating, at the time, that the 230s would be the line's main rolling stock.[58] The Class 197s were spotted being tested on the line in May 2022,[65] after the initial deadline for the 230s' May introduction had passed when the May–December 2022 timetable commenced.[17][11]

Class 777 of Merseyrail, proposed for use on the line

Merseyrail trains

[edit]

The Liverpool City Region Combined Authority announced that trials of the sevenbattery electric multiple unit (BEMU) versions of their newClass 777 had shown that they were capable of travelling up to 20 miles (32 km) between charges.[71] Further trials by Stadler reached a range of 84 miles (135 km).[72] This would allow the line to be served without full electrification.

Notes

[edit]
  1. ^Welsh:Llinell Wrecsam–Bidston, also stylised asBidston to Wrexham orWrexham to Bidston
  2. ^National Assembly for Wales (now Senedd),Welsh Government andTransport for Wales
  3. ^delayed from 2020 due to the COVID-19 pandemic

References

[edit]
  1. ^"Borderlands Line Route"(PDF).Borderlands Line. Archived fromthe original(PDF) on 19 May 2014. Retrieved9 June 2013.
  2. ^"TfW Network Map"(PDF).Transport for Wales. Retrieved8 December 2021.
  3. ^Usage of the term "Mid Wirral line" or "Mid-Wirral line"
  4. ^Longhorn, Danny (3 April 2023)."Wales' first hybrid train enters service on Borderlands Line".RailBusinessDaily. Retrieved10 June 2024.
  5. ^"Wrexham-Bidston line boosted with new Class 197 'made in Wales' trains".Deeside.com. Retrieved10 June 2024.
  6. ^"Events that shook North Wales: Closure of Shotton Steelworks". 21 July 2018.
  7. ^"CAPACITY CRUNCH AT CHESTER".www.modernrailways.com. 22 June 2017.
  8. ^"The Wrexham to Bidston railway (The Borderlands line): Electrification plans". Retrieved17 February 2007.
  9. ^Train Times – 12 December 2021 – 14 May 2022; Bidston (Birkenhead) – Wrexham Central(PDF).Transport for Wales. 2021.
  10. ^abc"Borderlands frequency increase deferred to May".www.modernrailways.com. 17 September 2021. Retrieved16 May 2022.
  11. ^abcdTrain Times – 15 May 2022 – 10 December 2022 – Bidston (Birkenhead) – Wrexham Central(PDF).Transport for Wales. 2022.
  12. ^"Over-60 Rail Concessions | Transport for Wales".
  13. ^"Hundreds call for direct line rail service from Heswall to Liverpool".Wirral Globe. 21 December 2021. Retrieved17 May 2022.
  14. ^Morgan, George (19 December 2021)."Hundreds sign petition for new train line to Liverpool".Liverpool Echo. Retrieved17 May 2022.
  15. ^"ACORP Summary map"(PDF). Association of Community Rail Partnerships. 28 July 2014. Archived fromthe original(PDF) on 18 November 2015. Retrieved28 October 2015.
  16. ^ab"Welsh Government commits to improve Wrexham-Bidston (Borderlands) line".RailAdvent. Retrieved8 July 2023.
  17. ^abcdefghijkl"Still no sign of TfW's new Class 230 trains after three years of delays".Wrexham.com. Retrieved16 May 2022.
  18. ^ab"Four trains an hour pledge for Wrexham-Bidston rail line".BBC News. 10 March 2021. Retrieved16 May 2022.
  19. ^"Major upgrades on cards for train services on 'Cinderella Route' from Wrexham to Bidston".The Leader. 9 March 2021. Retrieved16 May 2022.
  20. ^"After three years of delays, there is still no sign of TfW's new Class 230 trains".Deeside.com. Retrieved16 May 2022.
  21. ^abcHickman, Claire (21 December 2021).Proposed amendment to the Track Access Contract between Network Rail Infrastructure Limited & Transport for Wales Rail Limited (TfWRL) Under Section 22a of the Railways Act 1993(PDF).Network Rail.
  22. ^"Concerns raised over train service between Wrexham and Bidston".The Leader. 25 February 2022. Retrieved16 May 2022.
  23. ^ab"New trains could be operating through Flintshire from May but no green light for two an hour service".Deeside.com. Retrieved17 May 2022.
  24. ^"Regulator gives green light for two trains per hour on Wrexham to Bidston railway line".Deeside.com. Retrieved30 November 2022.
  25. ^""METRO IS GO" with Network North Wales | GOV.WALES".www.gov.wales. 22 May 2025. Retrieved22 May 2025.
  26. ^"£2.1bn north Wales rail overhaul plans unveiled by Welsh government".BBC News. 22 May 2025. Retrieved22 May 2025.
  27. ^Mitchell, Vic; Smith, Keith (2013).Wrexham to New Brighton. West Sussex: Middleton Press. map XXXIII.ISBN 9781908174475.OCLC 859543196.
  28. ^"Station Name: BURTON POINT".Disused Stations. Retrieved9 June 2013.
  29. ^"Station Name: Hope High Level Station".Disused Stations. Retrieved11 February 2016.
  30. ^"Disused Stations: Seacombe Station".www.disused-stations.org.uk. Retrieved20 July 2021.
  31. ^"Disused Stations: Railways at Bidston".www.disused-stations.org.uk. Retrieved20 July 2021.
  32. ^"About Growth Track 360".www.growthtrack360.com. Growth Track 360. Retrieved1 December 2016.
  33. ^"Budget gives extra £1.2bn to Wales".BBC News. 22 November 2017. Retrieved22 November 2017.
  34. ^"Borderlands line rail stations set for £280k revamp".BBC News. 24 October 2019. Retrieved16 May 2022.
  35. ^"£194m railway stations upgrade revealed by Transport for Wales".BBC News. 16 September 2019. Retrieved16 May 2022.
  36. ^ab"Merseytravel's plans to carry out further studies into the electrification of the railway track".Wirral Globe. 29 September 1999. Retrieved16 February 2016.
  37. ^Shennan, Paddy (28 August 2014)."Merseytravel plan to open or reopen host of new stations".Liverpool Echo. Retrieved30 August 2014.
  38. ^abcd"Welsh Route Study – Draft for Consultation".Network Rail. Archived fromthe original on 12 October 2016. Retrieved6 March 2015.
  39. ^"The Wrexham to Bidston railway (The Borderlands line): Electrification plans". Retrieved9 June 2013.
  40. ^"Merseytravel fury over £207m price tag for Bidston-Wrexham rail link".Wirral News. Liverpool. 5 November 2008. Archived fromthe original on 8 January 2009.
  41. ^"The Wrexham to Bidston railway (The Borderlands line): Electrification plans".Penmorfa. Retrieved17 April 2015.
  42. ^"The Wrexham to Bidston railway (The Borderlands line): Electrification plans".Penmorfa. Retrieved17 February 2007.
  43. ^"Network RUS Electrification"(PDF). October 2009. Archived fromthe original(PDF) on 12 October 2014. Retrieved20 October 2013.
  44. ^Hughes, Owen (29 January 2013)."Plea for £2bn windfall for Wales after high speed rail announcement".Daily Post. Retrieved9 June 2013.
  45. ^"Progress on Liverpool-North Wales rail link".North Wales Weekly News. Conwy. 25 October 2012.[permanent dead link]
  46. ^"Loop line renewal is 'short-term pain worth long-term gain of rail boost' writes MerseyTravel chief".Wirral Globe. 16 November 2016. Retrieved1 December 2016.
  47. ^"Agenda item – Rail Schemes Development and Delivery".Merseytravel. 3 November 2016. Archived fromthe original on 2 December 2016. Retrieved1 December 2016.
  48. ^"The Halton Curve: Small piece of track, big rail ambitions".www.railtechnologymagazine.com. Retrieved9 September 2017.
  49. ^Ash, Emily (4 April 2023)."Talks are ongoing for regular direct trains from Wrexham to Liverpool".The Leader. Retrieved10 April 2023.
  50. ^"No new trains on Wrexham Bidston line this year – Current trains to be moved to South Wales and replaced with … 'Scuds'".Deeside.com. Retrieved1 July 2022.
  51. ^"Delayed Class 230 train finally begins passenger service on Wrexham – Bidston line".Wrexham.com. Retrieved3 April 2023.
  52. ^"Wales' first battery-electric train enters service on Borderlands Line".RailAdvent. Retrieved3 April 2023.
  53. ^ab"Vivarail certifies UK's first battery-powered train | RailTech.com".RailTech.com | Online News for the Railway Industry. 27 January 2020. Retrieved20 July 2021.
  54. ^ab"What's Happening in North Wales | Transport for Wales".trc.cymru. 17 May 2021. Retrieved20 July 2021.
  55. ^ab"Refurbed London Underground trains for Wrexham to Bidston service + Keolis UK to move HQ to Wales".Wrexham.com. Retrieved20 July 2021.
  56. ^ab"New Transport for Wales confirm the new Class 197 trains will operate on the Wrexham to Bidston line".Deeside.com. Retrieved1 July 2022.
  57. ^abHughes, Owen (30 June 2022)."New Transport for Wales trains unveiled – when and where they will be running".North Wales Live. Retrieved1 July 2022.
  58. ^abHughes, Owen (1 December 2021)."New Transport for Wales carriages filmed rolling into town – this is when and where they'll be used".North Wales Live. Retrieved1 July 2022.
  59. ^abc"TfW opens up on 'thermal incidents' delaying introduction of recycled tube trains on Wrexham to Bidston line".Wrexham.com. Retrieved4 July 2022.
  60. ^"Testing of TfW's troubled Class 230 trains back underway following three month suspension".Wrexham.com. Retrieved20 August 2022.
  61. ^Clinnick, Richard (13 January 2015)."Battery-powered Electrostar enters traffic".Rail. Retrieved17 April 2015.
  62. ^ab"New trains set to come into service on Wrexham to Bidston line in December".Deeside.com. Retrieved17 May 2022.
  63. ^"New Wrexham to Bidston hybrid trains first journey to North Wales is a 'Champagne moment' for manufacturer".Deeside.com. Retrieved17 May 2022.
  64. ^"Firefighters called deal with 'small fire' on new Class 230 trains due to come into service later this year".Deeside.com. Retrieved4 July 2022.
  65. ^abcde"New train type spotted on Wrexham to Bidston line being tested to see if "capable of operating" on route".Wrexham.com. Retrieved25 May 2022.
  66. ^"Much delayed Class 230 train enters passenger service on Wrexham – Bidston line for first time".Deeside.com.
  67. ^"New hybrid trains in Wales experience 'minor technical issues' and vandalism".The Leader. 11 April 2023. Retrieved8 July 2023.
  68. ^"Blooming Problem: Pollen blamed for causing technical issues with new Borderlands Line trains".Deeside.com. Retrieved15 July 2023.
  69. ^"Calls made for Wrexham-Bidston rail line to be transferred to another operator".The Leader. 18 May 2023. Retrieved8 July 2023.
  70. ^"Wrexham to Bidston railway line will be 'greatly improved' under new plans".The Leader. 7 June 2018. Retrieved20 July 2021.
  71. ^"Battery breakthrough will see Merseyrail network extended". 21 July 2021.
  72. ^"New Merseyrail train runs 135km on battery". 19 December 2022.

External links

[edit]
Wikimedia Commons has media related toBorderlands Line.
InterCity lines
Main lines
Valleys & Cardiff
Local Routes
Other lines
Service routes
Primary to London
Other
Inter-regional
Intra-regional
Heritage
Disused
Retrieved from "https://en.wikipedia.org/w/index.php?title=Borderlands_line&oldid=1313745157"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp