Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Baku Metro

Coordinates:40°21′59.7″N49°5′7″E / 40.366583°N 49.08528°E /40.366583; 49.08528
Metro map
From Wikipedia, the free encyclopedia
Rapid transit system in Baku, Azerbaijan
This article has multiple issues. Please helpimprove it or discuss these issues on thetalk page.(Learn how and when to remove these messages)
This article needs to beupdated. Please help update this article to reflect recent events or newly available information.(April 2023)
icon
This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Baku Metro" – news ·newspapers ·books ·scholar ·JSTOR
(April 2023) (Learn how and when to remove this message)
(Learn how and when to remove this message)

Baku Metro
Icherisheher Metro Station
Overview
Native nameBakı metropoliteni
OwnerBaku Metro CJSC (Parent Company AZCON Holding)
LocaleBaku,Azerbaijan
Transit typeRapid transit
Number of lines3[1]
Number of stations27[2]
Daily ridership627,279 (daily average, 2024)[3]
Annual ridershipIncrease 229.6 million (2024)[3]
Chief executiveVusal Aslanov
WebsiteBaku Metro
Operation
Began operationNovember 6, 1967; 58 years ago (1967-11-06)[2]
Operator(s)Baku Metro Bakı Metropoliteni
Number of vehicles228
Technical
System length40.7 km (25.3 mi)[2]
Track gauge1,520 mm (4 ft 11+2732 in)Russian gauge
ElectrificationThird rail, 825VDC
System map

Baku Metro map

Baku Metro (Azerbaijani:Bakı metropoliteni) is arapid transit system servingBaku, the capital ofAzerbaijan. First opened on 6 November 1967[2] when Azerbaijan was part of theSoviet Union, its features are typical of formerSoviet systems, including very deep central stations and exquisite decorations that blend traditional Azerbaijani national motifs withSoviet ideology. At present, the system has 40.7 kilometres (25.3 mi)[2] of bidirectional tracks, made up of three lines[2] served by 27 stations.[2] The metro is the only one in Azerbaijan. Baku Metro was thefifth metro in the Soviet Union and thethirty-fourth in the world. In 2015, it carried 222.0 million,[4] passengers,[5] an average daily ridership of approximately 608,200. In 2024, it carried 229.6 million, an average daily ridership of 627,279.[3]

Baku Metro Closed Joint-Stock Company (Baku Metro CJSC) or (LLC Limited Liability Company), the company which runs the Baku Metro, was founded according Decree No. 289 Of thePresident of the Republic of Azerbaijan on February 27, 2014, as a legal successor to Baku Metro and Azertunelmetrotikinti Joint Stock Company. Property along with rights and obligations of Baku Metro and Azertunelmetrotikinti Joint Stock Company were transferred to the newly established Baku Metro CJSC.[6]

Baku Metro
Hazi Aslanov
Ahmedli
Halglar Doslugu
Neftchilar
Gara Garayev
Koroğlu
Ulduz
Bakmil
Nariman Narimanov
Ganjlik
Shah Ismail Khatai
28 May
Jafar Jabbarly
Nizami Ganjavi
Sahil
Elmler Akademiyasi
Icheri Sheher
Inshaatchilar
20 Yanvar
8 Noyabr
Memar Ajami
Avtovağzal
Nasimi
Khojasan
Azadliq prospekti
Darnagul

History

[edit]

During the final decades of theRussian Empire the port city of Baku became a large metropolis due to the discovery of oil in theCaspian Sea. By the 1930s, it was the capital of theAzerbaijani SSR and the largest city in SovietTranscaucasia. The first plans for a rapid-transit system date to the 1930s, with the adoption of a new general plan for city development. After World War II, the population passed the one million mark, a requirement of Soviet law for construction of a metro system. In 1947, theSoviet Cabinet of Ministers issued a decree authorizing its construction, which began in 1951. On November 6, 1967, Baku Metro became the Soviet Union's fifth rapid-transit system when the first 6.5 kilometres (4.0 mi) of track and a depot were inaugurated, in honor of the fiftieth anniversary of theOctober Revolution.

Baku Subway System 1970

Due to the city's unique landscape, Baku Metro did not have the typical Soviet "triangle" layout of development, and instead had two elliptical lines which crossed each other in the center of the city at theBaku railway station. Thus, one line would begin at the southwestern end of the city, and cross on a northeastern axis to follow the residential districts on the northern edge of the city and then snake along to the southeastern and ultimately southern end. This was inaugurated in three stages: Ulduz (1970) and Neftçilər (1972), followed by Ahmedli (1989) and finally Hazi Aslanov (2002), completing the first line. Additionally, in 1970 a branch was opened to a station built in a depot, Bakmil.

The second line was to parallel the Caspian coast from Hazi Aslanov through Baku's industrial districts, meeting the first line again at the Baku Railway Terminal, and then continuing westwards before turning north to join Baku's northwestern districts. To accelerate construction, a branch was opened from May 28 station to Khatai in 1968, and in 1976 in the opposite direction towards Nizami. The second and first line used the same station (May 28). This posed no serious problems initially, as the line was two stations long, but when the second stage opened in 1985, lengthening the line to 8 stations (Memar Ajemi), construction of a transfer was desperately needed.

Baku Metro Map 2002

In 1993, the first stage of the transfer station Jafar Jabbarli came in operation, but theend of the Soviet Union, political unrest, theFirst Nagorno-Karabakh War and the financial collapse which followed effectively paralyzed any construction attempts in Baku. Furthermore, during the mid-1990s, threemass casualty incidents took place: on March 19 and July 3, 1994,terrorist attacks killed 27 people and injured another 91, and on October 28 of the following year afire in a crowded train killed 289 and injured 265 others, the world's deadliest subway disaster.

In the late 1990s, construction restarted. The first project was the completion of Hazi Aslanov station, partly sponsored by theEuropean Union. In the mid-2000s, construction of the northern end of the second line, abandoned since 1994, was restarted with Nasimi station opening on October 9, 2008.

Network

[edit]
Evolution of Baku Metro

Lines

[edit]
LineSegmentDate openedLast extensionLengthStations
RedIcheri SheherHazi Aslanov196710 December 200220.1 km13
GreenDarnagulHazi Aslanov197629 June 201112.2 km8
GreenShah Ismail KhataiJafar Jabbarly196827 October 19932.3 km2
PurpleKhojasan8 Noyabr201623 December 20226.1 km4

Timeline

[edit]
SegmentDate openedLength
Icheri SheherNariman NarimanovNovember 6, 19676.5 km
28 MayShah Ismail KhataiFebruary 22, 19682.3 km
Nariman NarimanovUlduzMay 5, 19702.1 km
Nariman NarimanovBakmilSeptember 25, 1970 (reconstructed in 1978–79)0.5 km
UlduzNeftchilarNovember 7, 19725.3 km
28 MayNizami GanjaviDecember 31, 19762.2 km
Nizami GanjaviMemar AjamiDecember 31, 19856.5 km
NeftchilarAhmedliApril 28, 19893.3 km
Jafar Jabbarly -Shah Ismail KhataiDecember 27, 19932.3 km
AhmedliHazi AslanovDecember 10, 20021.4 km
Memar AjamiNasimiOctober 9, 20082.1 km
NasimiAzadliq prospektiDecember 30, 20091.3 km
Azadliq prospektiDarnagulJune 29, 20111.5 km
AvtovağzalMemar AjamiApril 19, 20162.1 km
Memar Ajami8 NoyabrMay 29, 20211.6 km
AvtovağzalKhojasanDecember 23, 20222.4 km
Total27 stations40.7 km

Renaming of stations

[edit]
OldNewDate of renaming
ŞaumyanXətaiMay 11, 1990
26 Bakı KomissarıSahilApril 9, 1992
XI Qızıl Ordu Meydanı20 YanvarApril 27, 1992
28 Aprel28 MayApril 9, 1992
AvroraQara QarayevApril 27, 1992
ElektrozavodBakmilJanuary 1, 1993
Bakı SovetiİçәrişәhәrApril 25, 2007
Məşədi ƏzizbəyovKoroğluDecember 30, 2011

Expansion plans

[edit]

At present, there are several expansion projects planned, two of which are under construction. In 2011, the Chief Executive of the Baku Metro, Taghi Ahmadov, announced plans to construct up to 53 new stations by 2030. Currently, eight stations and one train depot is under construction for Green Line.[7][8][9] These will serve the new bus complex as well asHeydar Aliyev International Airport.[10]

The signalling, supervision and telecommunication systems for Phase 1 of the Purple Line will be upgraded[when?] byThales.[citation needed]

Three new stations were planned to open by 2015, according to Ahmadov; Avtovağzal Bus Terminal was scheduled to open in late 2012 (delayed to 2016), while Old Gunashli and New Gunashli were planned to begin operating before 2015 (not yet open).[11]

Construction of the intermediate section of the Green Line, betweenKhatai andHazi Aslanov along Nobel Avenue, began in August 2013 by a French–Ukrainianconsortium.[12][13]

The Baku Metro will be refitted with modern technologies. The new stations will be able to handle trains with up to seven cars. The stations will feature modern platforms, lobbies, and escalators as well as new signalling and control systems.[7]

Most recent updated expansion plan consists of 5 lines, 77 stations and about 119 km total length of network.

Current construction

[edit]
Baku Metro Map with under construction stations

Lines

[edit]
LineSegmentDate to openLengthStations
GreenY-17 ↔ Y-18before 20401
GreenShah Ismail Khatai ↔ Y-17~2030~7.0 km4
GreenDarnagul ↔ Darnagul Depot20271
Purple8 November ↔ B-420261.2 km1

Under planning

[edit]

Lines

[edit]
LineSegmentDate to openLengthStations
RedIcheri Sheher ↔ Q-3~20402
RedQ-3 ↔ Q-1Badamdarafter 20402
RedHazi Aslanov ↔ Q-19Zykhafter 20402
GreenDarnagul ↔ Y-1after 20303
GreenY-1 ↔ Y-18~20405
GreenY-14 ↔ Y-17~20313
PurpleB-4 ↔ B-8~20304
PurpleB-8 ↔ B-12after 20404
BlueM-1 Yeni Yasamal ↔ M-11after 204011
YellowS-1Binagadi ↔ S-11Bibiheybatafter 204011

Structural units

[edit]

Baku Metro Closed Joint-Stock Company embracing such important areas like subway operation and construction, has the following structural units:[14]

  • Traffic service
  • Depot Department
  • Tunnel Facilities Services
  • Traffic Services
  • Electricity Supply Services
  • Electromechanical Service
  • Overhaul Services
  • Alarm and Communication Services
  • Automototransportation Services
  • United workshops
  • Construction Department
  • Human Resources and Services Department
  • Department of Perspective Development and Capital Construction Supervision
  • Department of Finance[14]

Depots

[edit]
Baku Metro depot

Operation

[edit]

Officially Baku Metro has two lines, however due to problems with opening the second part of Cəfər Cabbarlı, Baku instead operates as a large four branch system, with trains travelling from Həzi Aslanov to either İçərişəhər or Dərnəgul, branching at May 28 (beneath the main train station). Rare services from both Dərnəgul and İçərişəhər also terminate at Bakmil, but only twice per hour. There is a one-stopsecond line that operates separately between Cəfər Cabbarlı (essentially different platforms within the same station as May 28) and Şah İsmail Xətai, a shuttle service using only one of the two tracks due to low demand. The second interchange station is “Memar Əcəmi" where Green and Violet Lines cross.[6]

Due to the city's uneven landscape, some stations are very deep, that could double as bomb shelters in case of a nuclear war attack, given that the system was built at the height of theCold War in the 1950s/early 1960s. All seven of these deep level stations have a standardpylon design. The majority of the system's stations, 13, areshallow pillar-trispans. In addition, one station, Bakmil, is a single platform surface level.

Like many other former Soviet systems, most of the stations of the system are exquisitely decorated; many features advanced Soviet motives in artwork (including mosaics, sculpture and bas-reliefs) and architecture such as those of progress and international culture, whilst others focus on traditional Azeri culture and history. After the collapse of the Soviet Union, several stations were renamed, and some of their decoration was altered to comply with the new ideology.

Ticketing

[edit]

The system works on a flat fare of 60gapiks (0.60AZN) per trip, following a price hike on October 1, 2025. Some Baku residents were reportedly unhappy with the price hike, citing the age of the metro system's infrastructure.[15] Until 2006, metro users accessed the stations with metal (later plastic) tokens placed into turnstiles. In 2006, the Baku Metro introduced anRFID card system using rechargeable fare cards, which require a 2-manat deposit (plus travel credit).[citation needed]

BakuCard is a single Smart Card for payment on Baku Metro andBakuBus.[16] The intercity buses and metro use this type of card-based fare-payment system.[17][18]

Wi-fi and mobile phone coverage

[edit]

Work to install free wi-fi service at Koroğlu station is now underway.[19]

Local mobile service providerNar Mobile has started to provide 3G coverage at Sahil, Nəsimi, 28 May, Memar Əcəmi, Azadlıq prospekti and Dərnəgül. Service will expand to all stations as well as to tunnels by May.[20][21]

Rolling stock

[edit]

As of the beginning of 2020,81-717/714 (including later modifications .5 .5B and .5M) and their modernized version81-717M/714M,81-760B/761B/763B "Oka" and 81-765.B/766.B stock trains are operating on the metro. 81-710 («Еж3») and 81-704/81-705/81-706 («Ем, Ема, Емх») stock trains were also operating on the metro until they were retired in 2008. As well as 81-703 («Е») and 81-707 («Еж») which were retired in 2001. All rolling stock on the Baku Metro has been produced byMetrowagonmash jointly withAlstom.

81-717M/714M Type with old front. (Modernized in Tbilisi, Georgia)
81-717M/714M Type with new front (Modernized locally by Baku Metro)
81-760B/761B/763B "Oka" Type.
81-765.B/766.B "Moscow" Type.

Since 2014, the refurbishment of81-717/714 (and their modifications .5 .5B and .5M) has been underway inTbilisi's branch of ZREPS.[22] During the refurbishment, the front car is fitted with a newfibreglass cab end similar to those operating on thePrague Metro. Inside the train, it is fitted with new cab instruments as well as new seats, although the interior is kept relatively the same. Aside from the visual changes, the train is also fitted with new electrical equipment. Since the beginning of the programme the design of the front ends has been altered and now features a different headlamp design and the shape has been slightly changed.[23]

Baku Metro has redesigned Soviet-era trains to make them more modern and efficient. Also the new-generation metro trains ( 81-765 B/766B series) recently accepted by Baku Metro assembled locally by Baku Metro LLC on October 31, 2024.

At the end of 2012, Baku Metro loaned one81-760/761 "Oka" type train to decide whether they will renew the fleet with a new model of train. On January 21, 2013, the train entered service on the Red Line ("Icheri-Sheher" to "Hezi Aslanov"/"Bakmil"). During the trial runs several breakdowns and failures occurred and in July 2013, the train was returned to Moscow.[24] Later, the Baku Metro decided to purchase three five car "Oka" type trains with modified carriages fitted with through passage gangways. But, quickly abandoned the project and switched focus to a redesigned "Oka" type train built byMetrowagonmash andAlstom. The train was classified as 81-760B/761B/763B "Oka" with a modified front end, newer interior equipment and electrical equipment. In April 2015, all three trains were delivered to Baku and began service on the Red line.[25]

  • 81-760A "Oka" Type planned for service with Baku Metro.
    81-760A "Oka" Type planned for service with Baku Metro.
  • Modified 81-760B "Oka" Type in service on Red line.
    Modified 81-760B "Oka" Type in service on Red line.
  • Khojasan depot of Baku Metro - 81-765-B trains
    Khojasan depot of Baku Metro - 81-765-B trains

In February 2018, Baku Metro signed a contract with Metrovagonmash for the supply of two new 81-765 "Moscow" type trains. The first train was manufactured and shipped to Azerbaijan in March 2018 and from April 20, 2018, it began commercial operation. The trains are classified as 81-765.B/766.B and operate with only motor and head cars, no trailers, in order to increase traction. The second train was shipped in the same year. They are painted in a purple livery similar to the colour of the "Oka" type, just without the gray. As of December 2024, there are 27 81-765.B/766.B trains in Baku Metro.

  • Front view of 81-765.B "Moscow" Train.
    Front view of 81-765.B "Moscow" Train.
  • Trains feature interconnecting gangway.
    Trains feature interconnecting gangway.
  • Modern and spacious interior.
    Modern and spacious interior.

Incidents

[edit]

1994 bombings

[edit]
Main article:1994 Baku Metro bombings

On March 19 and July 3, 1994,bombs killed 27 people and injured 91 others.[26] ThreeArmenians were later arrested, charged and imprisoned in connection with the incident.[27]

1995 fire

[edit]
Main article:1995 Baku Metro fire

On October 28, 1995, a fire broke out between the Ulduz and Nariman Narimanovstations, killing 289 people and injuring 265 others.[28][29] The fire was deemed to have been caused by electrical malfunction, but the possibility ofsabotage was not excluded. The fire remainsthe world's deadliestsubway disaster.[30]

See also

[edit]

References

[edit]
  1. ^Cəmiyyəti, About the lines | "Bakı Metropoliteni" Qapalı Səhmdar."About the lines".metro.gov.az. RetrievedMarch 22, 2025.
  2. ^abcdefg"Baku Metro - History". Bakı Metropoliteni. Archived fromthe original on August 18, 2013. RetrievedSeptember 16, 2013.
  3. ^abc"Ötən il Bakı metrosundan istifadə edən sərnişinlərin sayı artıb".azertag.az (in Azerbaijani). RetrievedMarch 2, 2025.
  4. ^"Conveyance of passengers in transport sectors".The State Statistical Committee of the Republic of Azerbaijan.Archived from the original on May 10, 2017. RetrievedMay 4, 2017.
  5. ^"Ötən il Bakı metrosu ilə 222 mln. sərnişin daşınıb".ANN (in Azerbaijani). Azerbaijan News Network (ANN). 2016.Archived from the original on November 10, 2018. RetrievedNovember 9, 2018.
  6. ^ab"About "Baku Metropolitan" CJSC".railway-strategies.com. December 2016.Archived from the original on November 10, 2018. RetrievedNovember 9, 2018.
  7. ^abNigar, Orujova (August 11, 2014)."Good news for Baku Metro's users".Archived from the original on January 8, 2015. RetrievedNovember 9, 2018.
  8. ^"Over 70 underground stations to be built in Baku". news.az. November 4, 2010.Archived from the original on November 7, 2010. RetrievedNovember 9, 2018.
  9. ^Mammadov, Anar (February 18, 2011).""Memar Əcəmi" stansiyasında yeni metro xəttinə keçid açılır – FOTO" (in Azerbaijani). Milli.az.Archived from the original on November 10, 2018. RetrievedNovember 9, 2018.
  10. ^"41 new underground stations to be constructed in Azerbaijani capital in the next 17 years".APA. October 10, 2008.Archived from the original on September 9, 2009. RetrievedNovember 9, 2018 – viaDay.az.
  11. ^"Number of subway stations in Baku rises". Archived fromthe original on 16 April 2014. Retrieved20 December 2011.
  12. ^"Construction of new Baku metro line launched". Azeri Press Agency. August 22, 2013.Archived from the original on November 10, 2018. RetrievedNovember 9, 2018.
  13. ^Orujova, Nigar (August 22, 2013)."Construction of new section in Green Line of Baku Metro starts".Azernews.Archived from the original on February 4, 2021. RetrievedNovember 9, 2018.
  14. ^ab"About "Baku Metropolitan" CJSC". Archived fromthe original on July 18, 2017. RetrievedMay 17, 2017.
  15. ^"Public transit fares raised in Azerbaijan". JAM News. July 31, 2018. Archived fromthe original on July 25, 2019. RetrievedMay 22, 2019.
  16. ^"Vehicles available with "BakiKart"".bakikart.az.Archived from the original on September 25, 2018. RetrievedNovember 9, 2018.
  17. ^"How to pay your fare-Bakı Metropoliteni".www.metro.gov.az. Archived fromthe original on November 1, 2017. RetrievedApril 2, 2017.
  18. ^"Ticket and Prices".www.bakubus.az.Archived from the original on April 3, 2017. RetrievedNovember 9, 2018.
  19. ^"Baku Metro installs Wi-Fi at stations". APA. 16 December 2011. Archived fromthe original on 7 April 2012. Retrieved20 December 2011.
  20. ^Srikapardhi 0."Nar Strengthens Baku Metro Network and Expands 4G Coverage".telecomtalk.info/. RetrievedApril 18, 2024.{{cite web}}: CS1 maint: numeric names: authors list (link)
  21. ^"Azerfon launched 3G in Baku Metro and announced global launch of 4G for May". Archived fromthe original on 4 March 2016. Retrieved10 March 2012.
  22. ^"На линии бакинского метро выпустят отремонтированные вагоны - ФОТО".Archived from the original on February 4, 2021. RetrievedSeptember 18, 2020.
  23. ^"Baku, car # 2826".Archived from the original on February 4, 2021. RetrievedSeptember 18, 2020.
  24. ^"Azerbaijan Business Center - В Бакинском метро будут работать вагоны четвёртого поколения". Archived fromthe original on December 9, 2012. RetrievedApril 20, 2013.
  25. ^"Баку запускает в эксплуатацию новые метровагоны совместного производства Alstom и "Метровагонмаш" » Ресурс машиностроения. Машиностроение: новости машиностроения, статьи. Каталог: машиностроительный завод и предприятия".Archived from the original on February 4, 2021. RetrievedSeptember 18, 2020.
  26. ^Atwell, Elizabeth; Khanlou, Pirouz (1995)."Baku's Metro Accident". Azer International Magazine. pp. 46–47.Archived from the original on January 21, 2011. RetrievedFebruary 18, 2011.{{cite magazine}}:Cite magazine requires|magazine= (help)
  27. ^"Azerbaijani Terrorism Suspect Extradited to Baku". RFE/RL NEWSLINE. December 2, 1997.Archived from the original on November 10, 2018. RetrievedFebruary 18, 2011.
  28. ^I.J. Duckworth."Fires in vehicular tunnels"(PDF). 12th U.S./North American Mine Ventilation Symposium 2008. Archived fromthe original(PDF) on December 16, 2010. RetrievedApril 4, 2010.
  29. ^Terje Andersen, Børre J. Paaske."Railroad and Metro Tunnel Accidents". Lotsberg.net.Archived from the original on October 29, 2013. RetrievedNovember 9, 2018.
  30. ^Phil Reeves (October 31, 1995)."Sabotage fear over metro fire".The Independent.Archived from the original on December 16, 2013. RetrievedNovember 9, 2018.

External links

[edit]
Wikimedia Commons has media related toBaku Metro.
Baku Metro

Future

  •   Blue Line
  •   Yellow Line
Trams
Trolleybuses
Azerbaijan Railways
Tourist
Bus
Major terminals
Coat of arms of BakuBaku landmarks
Famous and historic structures
Places of worship
Mosques
Former
Other
Nature and parks
Entertainment and recreation
Cultural and art
Science and education
Sport venues
Transportation
Squares and streets
Government and
financial institutions
Rapid transit in Europe
Italics: under construction.
 Armenia
 Azerbaijan
 Bangladesh
 China (PRC)
 Georgia
 India
 Indonesia
 Iran
 Israel
 Japan
 Kazakhstan
 Mongolia
 North Korea
 Malaysia
 Pakistan
 Philippines
 Qatar
 Russia
 Saudi Arabia
 Singapore
 South Korea
 Taiwan (ROC)
 Thailand
 Turkey
 United Arab Emirates
 Uzbekistan
 Vietnam
* Under construction.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Baku_Metro&oldid=1322389577"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp