From Wikipedia, the free encyclopedia
Planned private space station
For the company behind this project, seeAxiom Space.

Axiom Station
Artist's rendering of an early concept design for Axiom Station berthed at the forward port ofHarmony
Station statistics
Launch2027 (planned)
Carrier rocketUndecided
Launch padUndecided
Mission statusUnder construction[1]

Axiom Station is a plannedmodular space station designed by Houston, Texas-basedAxiom Space forcommercial space activities. Axiom Space gained initialNASA approval for the venture in January 2020. Axiom Space was later awarded a NASA contract on February 28, 2020.[2] Axiom Station is a NASACommercial LEO Destinations (CLD) project to build a successor to theInternational Space Station (ISS) before its decommissioning in 2030.

External image
image iconAxiom Station modules infographic

Axiom Segment

[edit]

Between 2020 and 2024, Axiom Space intended to assemble four modules in a dedicated segment docked to the ISS before detaching them to form the free-flying Axiom Station.[3]

Axiom renderings illustrate how the four modules might attach to the ISS as they are berthed and relocated by theMobile Servicing System using the robotic armCanadarm2.[4][5]

The company released preliminary plans in February 2020 for how the Axiom Orbital Segment could form the basis for the Axiom Station, constructed out of the Axiom Segment and additional elements upon ISS retirement and separation, including a power and thermal module with anairlock.[6][non-primary source needed] The company planned to launch its first four modules in consecutive years starting from the mid-2020s.[7][8][9]

The interior concept of the crew quarters of Axiom Orbital Segment was conceived in 2018 by French architect and designerPhilippe Starck. Renderings of the habitat show a chamber with walls that are covered with tufted padding and studded with hundreds of color-changing LEDs.[10] The Axiom Orbital Segment is intended to have amenities including high-speed Wi-Fi, video screens, picture windows and a glass-walled cupola – which Axiom calls "the largest window observatory ever constructed for the space environment".[11]

In December 2024, Axiom Space announced a change in their station assembly plans. Instead of assembling the Axiom Orbital Segment at the ISS, the station was now planned to fly independently after the launch of the Habitat One (Hab-1) module. The Payload Power Thermal Module would be launched first and dock with the ISS while awaiting the launch of Hab-1, after which it would detach from the ISS and form the Axiom Station upon connecting with Hab-1.[3]

Planned modules

[edit]

Each Axiom Station module is an independent spacecraft equipped with all the systems needed to maneuver in orbit, including propulsion.[12]

PPTM

[edit]

Axiom's first module, the Payload Power Thermal Module (PPTM), is scheduled to be launched to the ISS no earlier than 2027.[3] PPTM is expected to provide power and thermal capacity equivalent to that of the ISS via solar array.[13][14] The module will initially be attached to one of two ports currently used by cargo spacecraft before detaching from the ISS to dock with Hab-1 in 2028.[3]

Hab-1

[edit]

Axiom's second module, Habitat One (Hab-1), is expected to be launched no earlier than 2028.[3] It is planned to provide quarters for four crew members and volume to accommodate research and manufacturing applications. Each personal crew quarter is equipped with a large Earth-viewing window and touch-screen communications panel. A docking adapter allows visiting vehicles to dock to the Axiom Station; four radial ports on Hab-1 provide for the addition of future modules and increase the station's docking capability.[14][13] It will have propulsion, guidance, navigation and station control systems. The first windowed pressurized module is approximately 11 meters long and 4.2 meters in diameter at the widest part.[9]Thales Alenia Space reported significant progress on the fabrication of the module in early 2024.[15]

When Hab-1 is launched into orbit, PPTM will undock from the ISS and dock with Hab-1, forming the initial two-module free-flying Axiom Station.[3]

AL

[edit]

Axiom's third module, the Airlock Module (AL), is expected to be launched in the late 2020s.[3] The addition of an airlock module will enableextravehicular activities, making Axiom Station a fully capable space station.[3]

Hab-2

[edit]

Axiom's fourth module, Habitat Two (Hab-2), is expected to be launched after the Airlock Module.[3] It will provide quarters for an additional four crew members allowing the station to support up to eight crew.[14][13] It provides completeECLSS support, commercial high data satellite communications and aCanadarm 3 styledremote manipulator system for the Axiom Station.[16]

RMF

[edit]
Axiom Earth Observatory interior.

Axiom's fifth module, the Research and Manufacturing Facility Module with Earth Observatory (RMF), is expected to be launched in the early 2030s.[14][13] It would provide access to the unique microgravity environment as a platform to enable research, product development, process improvement, and space manufacturing.[17] The Earth Observatory is a glass-walled cupola attached to the RMF.[3]

SEE-1

[edit]
External image
image iconAnimation of docked and inflated AxSEE-1.

Axiom Space plans to manufacture the SEE-1 module for the British companySpace Entertainment Enterprise (or S.E.E.).[18][19] It is planned to be a six meter sphericalinflatable module[20] that fulfills the purpose of a first entertainment studio in space. SEE-1 is expected to launch after Hab-1.[21]

The directors of SEE,Dmitry Lesnevsky andElena Lesnevsky, have been pursuing film shootings for a future movie withTom Cruise at the station.[20]

MPLM

[edit]

TheRaffaello Multi-Purpose Logistics Modules (MPLM) is planned to be modified and installed on Axiom Station after theISS is decommissioned.[22]

Construction

[edit]

Manufacturing

[edit]

Axiom Space signed a contract withThales Alenia Space for Thales Alenia to manufacture and test the primary structure and theMicrometeoroid &Debris Protection System (or MDPS) for both Hab-1 and Hab-2.[23] Thales Alenia Space is in the process of machining the primary structure of Hab-1. With the completion of the Manufacturing Readiness Review on September 21, 2021, Thales Alenia began welding the cone panels of Hab-1. The primary structure for Hab-1 is expected to be delivered from Italy to Houston, Texas in early 2023 where Axiom Space will complete assembly and integration of all systems before launch.[9]

Assembly

[edit]
Axiom station – the first three steps of building a station – proposal 2024[24]

There have been no announcements as to which rocket will carry the Axiom Station modules intoLow Earth orbit. The first module, PPTM, is planned to attach to one of two ISS ports currently used by cargo spacecraft. PPTM will separate from the ISS and berth to Hab-1 once that module is launched. The Airlock Module (AL), Hab-2 and RMF will then follow in that order.[3] As Axiom Station is amodular space station, the modules may be moved to different ports as needed.

Axiom is, under agreements between the US and India, looking into diversifying its launch providers and possibly using Indian or European launch systems.[25]

Purpose

[edit]

Scientific research

[edit]

Axiom Station is planned to have a lab module, RMF, to provide opportunities forLow Earth orbitresearch andmanufacturing.

Commercial station

[edit]

Axiom Station is planned to have space for general commercial use, such as the SEE-1 entertainment module.

See also

[edit]

References

[edit]
  1. ^"A step closer to the Axiom Commercial Space Station".Thales Group. 13 October 2021. Retrieved6 April 2022.
  2. ^Northon, Karen (27 January 2020)."NASA Selects First Commercial Destination Module for Space Station".NASA. Retrieved6 April 2022.
  3. ^abcdefghijkFoust, Jeff (18 December 2024)."Axiom Space revises space station assembly plans".SpaceNews. Retrieved18 December 2024.
  4. ^"Assembly Sequence: Watch the Axiom Segment of the ISS constructed module-by-module". Axiom Space. 26 January 2020. Retrieved12 June 2020.
  5. ^"A Private Space Station Might Be Born From the ISS".seeker.com. Retrieved26 September 2021.
  6. ^"Axiom Commercial Space Station". Axiom Space. Retrieved14 February 2020.
  7. ^Foust, Jeff (14 October 2022)."Commercial space station developers seek clarity on regulations".SpaceNews. Retrieved21 November 2022.
  8. ^Corbett, Tobias (28 January 2020)."NASA selects Axiom Space to build commercial space station segment".NASASpaceFlight.com. Retrieved16 November 2021.
  9. ^abc"A step closer to the Axiom Commercial Space Station".Thales Group. 13 October 2021. Retrieved16 November 2021.
  10. ^"French designer creates womblike habitat for space tourists". NBC News. Retrieved1 July 2018.
  11. ^Corbett, Tobias (27 January 2020)."NASA selects Axiom Space to build commercial space station segment". NASASpaceFlight.com.
  12. ^@Axiom_Space (31 August 2021)."Each Axiom Station module is an independent spacecraft equipped with all the systems needed to maneuver in orbit – propulsion among them. Progress on the thrusters, developed in-house, continues apace with this test unit undergoing new and progressively longer hotfire cycles" (Tweet) – viaTwitter.
  13. ^abcd"News & Media".Axiom Space. Retrieved6 April 2022.
  14. ^abcd"Axiom Commercial Space Station".Axiom Space. Retrieved6 April 2022.
  15. ^"The welding of the forward cone to the cylinder bulkhead marks a significant evolution of the primary structure of Ax- H1".
  16. ^Boucher, Marc (4 May 2022)."Canadarm3 technology to be included on Axiom commercial space station".SpaceQ. Retrieved15 August 2022.
  17. ^"Axiom Space Builds World's First Commercial Space Station". Retrieved11 November 2022.
  18. ^"Press – Space Entertainment Enterprise".www.seespacearena.com. Retrieved6 April 2022.
  19. ^"SEE – Space Entertainment Enterprise".www.seespacearena.com. Retrieved6 April 2022.
  20. ^ab"Bigelow Aerospace transfers BEAM space station module to NASA".SpaceNews. 21 January 2022. Retrieved14 June 2022.
  21. ^"RELEASE – Axiom selected to build inflatable microgravity media venue".Axiom Space. 20 January 2022. Retrieved6 April 2022.
  22. ^Leinfelder, Andrea (27 April 2023)."NASA's Super Guppy delivers space shuttle module for reuse on Axiom Space's commercial station".Houston Chronicle. Houston, Texas. Retrieved27 April 2023.
  23. ^"Thales Alenia Space to provide the first two pressurized modules for Axiom Space Station".Thales Group. 14 July 2021. Retrieved6 April 2022.
  24. ^"Axiom Space Accelerates Axiom Station Assembly".Axiom space. Axiom space, December 18, 2024. Retrieved6 August 2025.
  25. ^Kuthunur, Sharmila (8 November 2024)."Axiom Space looks to India and Europe for rockets to help build its private space station".Space.com. Retrieved9 November 2024.

External links

[edit]
Orbiting
Russian Segment
US Segment
Subsystems
Experimental
devices
ISS components
Former
Major
components
Future
Planned
Spare
hardware
Cancelled
Related
Organizations
Active
Defunct
Denis Tito, Talgat Musabayev, and Yury Baturin
Vehicles
Living in space
Space competitions
Space tourists
Past
Space tourism
missions
Past
Cancelled
Related
Current
Past
Russia /
Soviet Union
United States
China
Private
Canceled
Individual projects
Incorporated intoISS
In development
Russia
Private
International
Proposed
Concepts
Related
Notes: † Never inhabited due to launch or on-orbit failure, ‡ Part of theAlmaz military program, ° Never inhabited, lacks docking mechanism.