Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

96th Street station (Second Avenue Subway)

Coordinates:40°47′03″N73°56′50″W / 40.7841°N 73.9472°W /40.7841; -73.9472
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
New York City Subway station in Manhattan

For other uses, see96th Street.
New York City Subway station in Manhattan, New York
 96 Street
 "Q" train
Platform level
Station statistics
Address96th Street &Second Avenue
New York, New York
BoroughManhattan
LocaleUpper East Side (Carnegie Hill andYorkville);East Harlem
Coordinates40°47′03″N73°56′50″W / 40.7841°N 73.9472°W /40.7841; -73.9472
DivisionB (IND)[1]
LineIND Second Avenue Line
Services  N limited rush hour service only (limited rush hour service only)
  Q all times (all times)
  R one weekday a.m. rush hour trip in the northbound direction only (one weekday a.m. rush hour trip in the northbound direction only)
TransitBus transportNYCT Bus:M15,M15 SBS,M96
Bus transportMTA Bus:BxM1,BxM7,BxM10[2]
Ferry transportNYC Ferry: Soundview route (at East 90th Street and East End Avenue)
StructureUnderground
Platforms1island platform
Tracks2
Other information
OpenedJanuary 1, 2017; 8 years ago (2017-01-01)[3][4]
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990ADA-accessible
Traffic
20243,995,561[5]Increase 4.3%
Rank79 out of 423[5]
Services
Preceding stationNew York City SubwayNew York City SubwayFollowing station
Terminus86th Street
N limited rush hour service onlyQ all times
Future services
106th Street86th Street
N limited rush hour service onlyQ all times
Location
96th Street station (Second Avenue Subway) is located in New York City Subway
96th Street station (Second Avenue Subway)
Show map of New York City Subway
96th Street station (Second Avenue Subway) is located in New York City
96th Street station (Second Avenue Subway)
Show map of New York City
96th Street station (Second Avenue Subway) is located in New York
96th Street station (Second Avenue Subway)
Show map of New York
Track layout

Tunnel continues to 105th Street
End of tail tracks
Tail tracks each
store two trains
Street map

Map

Station service legend
SymbolDescription
Stops all timesStops all times
Stops rush hours only (limited service)Stops rush hours only (limited service)
Stops rush hours in the peak direction only (limited service)Stops rush hours in the peak direction only (limited service)
Stops weekends and weekday eveningsStops weekends and weekday evenings

The96th Street station (also known as the96th Street–Second Avenue station) is astation on theIND Second Avenue Line of theNew York City Subway. Located at the intersection ofSecond Avenue and96th Street on the border of theUpper East Side/Yorkville andEast Harlem neighborhoods inManhattan, it is the northernterminus for the first phase of the Second Avenue Line. The station is served by theQ train at all times, as well as limitedN trains and one northbound a.m.R train during rush hours; all three routes terminate at the station. There are two tracks and anisland platform.

The station was not originally proposed as part of theProgram for Action in 1968, but a later revision to that plan entailed building a Second Avenue Subway with one of its stops located at 96th Street. Construction on that project started in 1972, but stalled in 1975 due to lack of funding. In 2007, a separate measure authorized a first phase of the Second Avenue Line to be built between 65th and 105th Streets, with stations at 72nd Street, 86th Street and 96th Street. The station opened on January 1, 2017, as a terminal station, with provisions to extend the line north toHarlem–125th Street in Phase 2. Since opening, the presence of the Second Avenue Subway's three Phase 1 stations has improved real estate prices along the corridor. The 96th Street station was used by approximately 6.2 million passengers in 2019.[6]

The station, along with the other Phase 1 stations along the Second Avenue Subway, contains features not found in most New York City Subway stations. It is fully compliant with theAmericans with Disabilities Act of 1990, containing two elevators for disabled access. Additionally, the station containsair conditioning and is waterproofed, a feature only found in newer stations. The artwork at 96th Street is "Blueprint for a Landscape", a mural bySarah Sze.

History

[edit]

Background

[edit]
Mezzanine level

The Second Avenue Line was originally proposed in 1919 as part of amassive expansion of what would become theIndependent Subway System (IND).[7][8]: 203  Work on the line never commenced, as theGreat Depression of 1929 crushed the economy.[9] Numerousplans for the Second Avenue Subway appeared throughout the 20th century, but these were usually deferred due to lack of funds. In anticipation of the never-built new subway line, theSecond andThird Avenueelevated lines were demolished in 1942 and 1955, respectively.[10][11] The Second Avenue Elevated had one station at92nd Street and another at99th Street,[12] and the Third Avenue Elevated had a stop on nearby Third Avenue at99th Street.[13]

Unrealized proposals

[edit]

As part of theNew York City Transit Authority's 1968Program for Action, the construction of the full-lengthSecond Avenue Subway was proposed. It was to be built in two phases—the first phase from 126th to 34th Streets, the second phase from 34th to Whitehall Streets.[14][15] The line's planned stops in Manhattan, spaced farther apart than those on existing subway lines, proved controversial; the Second Avenue line was criticized as a "rich man's express, circumventing theLower East Side with its complexes of high-rise low- and middle-income housing and slums in favor of a silk stocking route."[8]: 218  People protested for almost a year over the lack of stations at 72nd and 96th Streets; while a Lenox Hill (72nd Street) station[16] was added in October 1970, the 96th Street station was still not in the official plans, despite the proximity of theMetropolitan Hospital Center to the proposed station.[8]: 220  In response to public outcry, the MTA announced the addition of a station at 96th Street in 1971.[17]

Many community representatives requested that a station, in addition to those already proposed, be constructed in the vicinity of 96th Street and Second Avenue, principally to serve theMetropolitan Hospital which provides medical service to large numbers of low-income patients.
After considering the testimony presented at the hearing, the New York City Transit Authority adopted a resolution providing for the construction of a station at 96th Street at a cost of approximately $10,000,000.[15]

All Second Avenue Subway stations built under the Program for Action would have included escalators, high intensity lighting, improved audio systems, platform edge strips, and non-slip floors to accommodate the needs of the elderly and people with disabilities, but no elevators. Space at each station would have been used for ancillary facilities.[18] The stations were to be made with brick walls andpavers alongside stainless steel, and would have relatively small dimensions, with 10-foot (3.0 m) mezzanine ceilings. Damaz & Weigel received a contract for the design of the 96th Street station.[19]: 110 

Work above ground, November 2012

A combination of Federal and State funding was obtained, and despite the controversy over the number of stops and route, a groundbreaking ceremony was held on October 27, 1972, at Second Avenue and 103rd Street.[20][21][22] Construction began shortly thereafter on what was to be the 99th–105th Streets segment, which was projected to cost $17.48 million (worth about $131,399,000 today).[23] However, the city soon experienced its most direfiscal crisis yet, due to the stagnant economy of the early 1970s, combined with themassive outflow of city residents to the suburbs, and in September 1975 construction on the line stopped, and the tunnels were sealed.[22][24] Over the next few decades, the MTA regularly inspected and maintained the tunnel segments (spending $20,000 a year by the early 1990s), to maintain the structural integrity of the streets above, and in case construction would ever resume. Trespassers would often camp in the tunnels until the MTA increased security.[25]

In 1999, theRegional Plan Association considereda full-length Second Avenue Subway, which include 96th Street as one of its planned 31 stations. The station would serve the Metropolitan Hospital at 97th Street and the then-new high-rise buildings south of 96th Street.[26]

Construction

[edit]

In March 2007, plans for theconstruction of the Second Avenue Subway were revived.[27][28] The line's first phase, the "first major expansion" to the New York City Subway in more than a half-century,[29] included three stations in total (at 72nd, 86th, and 96th Streets), which collectively cost $4.45 to $4.5 billion.[30][31] Its construction site was designated as being from 105th Street and Second Avenue to 63rd Street and Third Avenue.[32] The MTA awarded a $337 million contract—one that included constructing the tunnels between 92nd and 63rd Streets, building a launch box for thetunnel boring machine (TBM) at 92nd to 95th Streets, and erecting access shafts at 69th and 72nd Streets—to Schiavone Construction,Skanska USA Civil, and J.F. Shea Construction.[33] The line's construction commenced on April 15, 2007,[27][28][34] In April 2007, the second round of planning for the station was finalized.[35][36]

Station cavern construction in December 2014

A ceremonial ground-breaking for the Second Avenue Subway was held on April 12, 2007, three blocks north of the station.[28][27][34][37][38] The contractor prepared the initial construction site at 96th Street on April 23, 2007.[39] A TBM was originally expected to arrive six to eight months after construction began, but the utility relocation and excavation required to create its "launch box" delayed its deployment from 96th Street down to 63rd Street until May 2010.[40] The forced evacuation of two buildings near the 96th Street station delayed the contractor's plan to use controlled blasting to remove bedrock in the southern section of the launch box.[41] The station itself could not be bored because of the soft soil there.[42] Instead,slurry ordiaphragm walls, 1.1 meters (3.6 ft) wide and 6.1 meters (20 ft) long and about 35 meters (115 ft) deep, were built alongside the sections between East 93rd and 95th Streets. Between East 91st and 93rd Streets, where the rock becomes shallower, 1.1-meter-diameter (3.6 ft)secant piles did the same work at shallower depths.[42][43] Earth excavation was conducted between walls once they were installed, and box structures were built using a bottom-up construction method. Temporarydecking constituted the top of the boxes, and the decking both braced the excavation and supported the walls and Second Avenue traffic.[43]

By the beginning of 2012, the slurry wall for the station site was being taken down.[44] On June 25, 2012, a $324.6 million contract was awarded to E.E. Cruz and Company and Tully Construction Company for the station's plumbing, electricity, ancillaries, and entrances.[45] In March 2013, the bulkhead separating the new construction from the 1970s-era tunnel at 99th Street was completed.[46]

On March 19, 2013, a construction worker got stuck in waist-deep muck at the station site;[47][48] he was extricated after four hours of rescue efforts, but nearly died after the incident.[49][50]

In mid-2013, work had resumed in the tunnel segment between 99th Street and 105th Street, involving the addition of track and signals, mechanical and plumbing equipment, and upgrading the tunnels to meet modern fire code standards.[51][52] As of November 2013[update], the station was 65% excavated. Rails for the line had arrived and were being stored in the station cavern;[53] about one-third of the rails for the line had arrived by then, enough for tracks to be laid from 105th to 87th Streets.[54] By spring 2014, the mezzanine was completed, and roof slabs were being installed; tracks and signal brackets were also installed north of the station.[55] By April 2015, the station was 67% complete,[56] and by April 2016, the station was 91% complete.[57] The station was scheduled to be completed by June 2016,[58] but this was later pushed back to fall 2016.[59]

On December 22 and 23, as part of an open house hosted by the MTA, the public was invited to tour the 96th Street station before it opened, to generally positive acclaim.[60][61] The station opened on January 1, 2017.[3][4]

Phase Two

[edit]

Phase 2, which does not have a set timetable for construction,[62][63] is planned to extend service from 96th Street toHarlem–125th Street. During Phase 2, both East Harlem segments, between 99th Street and 105th Street, and between 110th Street and 120th Street will be connected, modified, and used for normal train service. In 2007, the MTA reported that the segments were in pristine condition.[64] Under the approved plan, the MTA estimates to complete Phase 2 between 2027 and 2029, by which the Q and rush-hour N trains will be extended to Harlem–125th Street.[65]

Station layout

[edit]
GroundStreet levelExits/entrances
MezzanineMezzanineFare control, station agent,MetroCard andOMNY machines
Disabled accessElevator in plaza on west side of Second Avenue between 95th Street and 96th Street
Platform levelTrack 2"Q" train towardConey Island–Stillwell Avenue viaBrighton(86th Street)
"N" train toward Coney Island–Stillwell Avenue viaSea Beach (select rush hour trips)(86th Street)
Island platformDisabled access
Track 1"Q" train toward Coney Island–Stillwell Avenue viaBrighton(86th Street)
"N" train toward Coney Island–Stillwell Avenue viaSea Beach (select rush hour trips)(86th Street)

The 96th Street station is served byQ trains at all times as well as limitedN trains and one northbound a.m.R train during rush hours.[66] This station is the northern terminus of the Second Avenue Subway;[67][68] the next stop to the south is86th Street.[69] It has two tracks and anisland platform.[28] The station is built so that it is more wide open than most other underground subway stations in the system.[70] Its design was likened to aWashington Metro station by Michael Horodniceanu, President ofMTA Capital Construction.[71] The platform is approximately 49 feet (15 m) below ground, making the station the shallowest of the three Phase 1 stations.[72][73] The platform for the 96th Street station, like the otherSecond Avenue Subway stations, is 27.8 feet (8.5 m) wide.[74][75] As with other stations on the first phase of the Second Avenue Subway, it was designed and engineered by ajoint venture ofArup andAECOM.[76]

The station has air-cooling systems to make it at least 10 °F (6 °C) cooler than other subway stations during the summer.[77] This requires the station to have large ventilation and ancillary buildings, rather than traditional subway grates.[78] The station is also compliant with current fire codes, whereas most existing stations are not.[79] Additionally, the station is waterproofed with concrete liners and fully drained.[80] In early plans, the Second Avenue Subway was supposed to haveplatform screen doors to assist with air-cooling, energy savings, ventilation, and track safety,[81] but this plan was scrapped in 2012 as cost-prohibitive.[82] According to an internal study prepared for the MTA in 2020, the 96th Street station could theoretically accommodate half-height platform edge doors. Full-height platform screen doors would be possible but would necessitate the installation of structural bracing and relocation of several mechanical systems.[83]

Track layout

[edit]

South of the station, underneath 92nd Street, is adiamond crossover allowing northbound trains from track S2 to terminate on either track, then go into the storage tracks or proceed south on track S1.[84][85][86] A section of tunnel north of the station, built in the 1970s between 99th and 105th Streets, was renovated.[87] The tail tracks north of the station, which currently end at 99th Street, can store four trainsets, two on each track.[88]

Artwork

[edit]

In 2009,MTA Arts & Design selectedSarah Sze from a pool of 300 potential artists to create the artwork for the station.[89][90] Her work, which was created by Spanish artisans Alcalagres,[90] consists of blue, violet, and lavender landscapes,[91][89] as well as depictions of wind blowing things around.[90] The artwork is located on 4,300 porcelain wall panels.[92][93][94] The installation is permanent.[95]

The piece is called "Blueprint for a Landscape" and consists of a dark-blue landscape of things being blown around as if by an incoming train.[92][90] ANew York Times reporter described it as "fragmented images of scaffolding, birds, chairs and leaves, digitally collaged."[90] Another piece, in simple blue-and-white colors, consists of depictions of billowing sheets of paper. The work also serves the practical purpose of helping navigation, as the sheets are more closely packed together near the exits than in the middle of the station.[90] The work features familiar objects—sheets of paper, scaffolding, birds, trees and foliage—caught up in a whirlwind. Each entrance features a different shade of blue and a blueprint-stylevector line design, a visual theme that is integrated with the architecture.[96][97]

Exits and ancillary buildings

[edit]

There are 3 entrances and exits, comprising 6 escalators and one elevator.[85][98]

Entrance 3, with blue LEDs lighting up the canopy's supports
Location[98]Exit TypeNumber of exits
Entrance 1
Within building, SW corner of Second Avenue and 94th Street[99]
Staircase
Escalator
1 staircase
1 escalator
Entrance 2
Plaza, NE corner of Second Avenue and 94th Street[99]
Escalator3 escalators
Entrance 3
Second Avenue, west side between 95th Street and 96th Street[99]
ElevatorDisabled access1
Entrance 3
Plaza, SW corner of Second Avenue and 96th Street[99]
Staircase
Escalator
1 staircase
2 escalators

There are also two ancillary buildings that store station equipment.[100][101] Ancillary 1 is at the northeast corner of Second Avenue and 93rd Street, while ancillary 2 is at the SW corner of Second Avenue and 97th Street.[100][101] TheMetropolitan Hospital Center is one block to the north of the station's northernmost entrance.[102]

The locations of the station entrances are all south of96th Street.[103] In 2009, there was a debate over the placement of the location of the street entrances. Because 96th Street divides the neighborhoods of theUpper East Side to the south andEast Harlem to the north, some residents of East Harlem stated that their neighborhood was not served by the Second Avenue Subway.[104][105]

Effects

[edit]

The surrounding area's real estate prices had been in decline.[106] However, the value of real estate in the area has risen since 2013,[107][108] with new construction charging a "subway premium."[106] Some businesses near the station's construction site lost profits,[109] but with the opening of the new station, business owners hope to see an increase in patronage.[110][111]

A writer forThe New Yorker called the station area a partially gentrified "traditional dividing line between East Harlem and the Upper East Side". Unlike for the other two Phase 1 stations, rents for buildings in the station area had not reached their maximum. To illustrate the area's transitional condition, the writer stated that the 96th Street station was situated within a few blocks of a high-crime housing development on First Avenue, an old ice-skating rink frequented by "squeegee men" who would demand money from drivers, a tenement where future PresidentBarack Obama lived in the 1980s, theIslamic Cultural Center of New York, as well as the Mayor of New York City's residence atGracie Mansion.[42]

Nearby places

[edit]

References

[edit]
  1. ^"Glossary".Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS)(PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived fromthe original(PDF) on February 26, 2021. RetrievedJanuary 1, 2021.
  2. ^"Manhattan Bus Map"(PDF).Metropolitan Transportation Authority. July 2019. RetrievedDecember 1, 2020.
  3. ^abMcCowan, Candace (December 31, 2016)."Decades in the making, Second Avenue Subway set to open to the public".ABC7 New York. RetrievedJanuary 1, 2017.
  4. ^abFitzsimmons, Emma G.; Wolfe, Jonathan (January 1, 2017)."Second Avenue Subway Opening: What to Know".The New York Times. RetrievedJanuary 1, 2017.
  5. ^ab"Annual Subway Ridership (2018–2023)".Metropolitan Transportation Authority. 2023. RetrievedApril 20, 2024.
  6. ^"Annual Subway Ridership (2018–2023)".Metropolitan Transportation Authority. 2023. RetrievedApril 20, 2024.
  7. ^"www.nycsubway.org: Second Avenue Subway: The Line That Almost Never Was". nycsubway.org. 1972. RetrievedSeptember 30, 2015.
  8. ^abcRaskin, Joseph B. (2013).The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. New York, New York: Fordham University Press.doi:10.5422/fordham/9780823253692.001.0001.ISBN 978-0-82325-369-2.
  9. ^"IND Second System 1929 Plan". nycsubway.org. RetrievedMarch 25, 2016.
  10. ^"Second Avenue Subway Project – History". October 19, 2002. Archived fromthe original on October 19, 2002. RetrievedFebruary 15, 2016.
  11. ^"Last Train Rumbles On Third Ave. 'El'; An Era Ends With Final Run of Third Avenue 'El' LAST TRAIN ROLLS ON THIRD AVE. 'EL'"(PDF).The New York Times. RetrievedAugust 23, 2016.
  12. ^See:
  13. ^See:
  14. ^"The New York Transit Authority in the 1970s".nycsubway.org. RetrievedOctober 27, 2016.
  15. ^ab"DRAFT ENVIRONMENTAL STATEMENT, SECOND AVENUE SUBWAY, ROUTE 132-A".Urban Mass Transportation Administration. nycsubway.org. August 1971. RetrievedMay 22, 2014.
  16. ^"Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Appendix B Development of Alternatives"(PDF).mta.info. Metropolitan Transportation Authority. May 2004. RetrievedAugust 7, 2016.
  17. ^"DRAFT ENVIRONMENTAL STATEMENT, SECOND AVENUE SUBWAY, ROUTE 132-A".Urban Mass Transportation Administration. nycsubway.org. August 1971. RetrievedFebruary 13, 2016.
  18. ^"Notice of Public Hearing Southern Extension of the Second Avenue Line for the New York City Transit System".New York Daily News. February 16, 1973. RetrievedDecember 8, 2018.
  19. ^Stern, Robert A. M.; Mellins, Thomas; Fishman, David (1995).New York 1960: Architecture and Urbanism Between the Second World War and the Bicentennial. New York: Monacelli Press.ISBN 1-885254-02-4.OCLC 32159240.OL 1130718M.
  20. ^"Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Appendix B Development of Alternatives"(PDF).mta.info. Metropolitan Transportation Authority. May 2004. RetrievedAugust 7, 2016.
  21. ^"Second Avenue Subway: Timeline". nycsubway.org. Retrieved April 7, 2014.
  22. ^ab"Second Avenue Subway". Metropolitan Transportation Authority. Archived fromthe original on April 8, 2014. RetrievedApril 7, 2014.
  23. ^Burks, Edward C. (October 25, 1973)."GROUND IS BROKEN FOR 2D AVE. LINK; Downtown Subway Section Begins With Ceremony Led by Lindsay and Ronan Projects Are Listed Interest in French Train".The New York Times. p. 51. RetrievedOctober 4, 2015.
  24. ^Burks, Edward C. (September 26, 1975)."WORK IS STOPPED ON SUBWAY LINE; City Lacks Funds to Finish Part of 2d Ave. Project".The New York Times. p. 41. RetrievedOctober 4, 2015.
  25. ^Finder, Alan (April 19, 1994)."A Tunnel Waiting Two Decades for a Train; Shafts for the Second Avenue Subway Are Maintained, in Case the Line Is Ever Built".The New York Times. p. B1. Archived fromthe original on March 7, 2016. RetrievedOctober 4, 2015.
  26. ^MetrolinkArchived August 2, 2010, at theWayback Machine, p.20
  27. ^abcNeuman, William (April 9, 2007)."Is That Finally the Sound of a 2nd Ave. Subway?".The New York Times. RetrievedJune 28, 2011.
  28. ^abcd"Tunneling Begins Under Second Avenue". Metropolitan Transportation Authority. May 14, 2010. Archived fromthe original on June 6, 2011. RetrievedJune 28, 2011.
  29. ^"The Second Avenue subway explained".am New York. RetrievedOctober 27, 2016.
  30. ^*Putzier, Konrad (May 14, 2014)."Real Estate Weekly » Blog Archive » Light at end of tunnel for Second Ave. subway". Rew-online.com. Archived fromthe original on September 7, 2017. RetrievedJune 5, 2014.
  31. ^"Drone takes tour of NYC's 2nd Avenue subway line".CBS News. September 16, 2015. RetrievedOctober 27, 2016.
  32. ^Nonko, Emily (January 30, 2014)."Updates on NYC's Biggest Subway Projects: Second Avenue and East Side Access". NewYork.com. Archived fromthe original on May 17, 2014. RetrievedJune 5, 2014.
  33. ^"Top Projects"(PDF). NY Construction. February 8, 2017. p. 1.
  34. ^ab"Excavation of West Tunnel for Second Avenue Subway Complete". Metropolitan Transportation Authority. February 4, 2011. Archived fromthe original on October 27, 2016. RetrievedJune 28, 2011.
  35. ^"Second Avenue Subway Project 96th Street Station"(PDF).MTA.info.Metropolitan Transportation Authority.
  36. ^Rubinstein, Dana (October 23, 2013)."Where is the Second Avenue Subway going?". Capital New York. Archived fromthe original on March 22, 2016. RetrievedMay 15, 2014.
  37. ^Jen Chung (April 12, 2007)."Second Avenue Subway Groundbreaking Day!". Gothamist. Archived fromthe original on November 3, 2011. RetrievedMay 15, 2014.
  38. ^"MTA | Press Release | MTA Headquarters | Second Avenue Subway Breaks Ground". New.mta.info. April 12, 2007. Archived fromthe original on December 21, 2015. RetrievedMay 15, 2014.
  39. ^Roess, Roger P.; Sansome, Gene (2013).The Wheels That Drove New York: A History of the New York City Transit System. Springer. p. 370.ISBN 978-3-642-30484-2. RetrievedOctober 4, 2015.[permanent dead link]
  40. ^"Second Avenue Subway – A Status Report"(PDF). Archived fromthe original(PDF) on July 21, 2011. RetrievedAugust 2, 2009.
  41. ^Rivoli, Dan (September 2, 2009)."2nd Ave. Subway Delays". Our Town. Archived fromthe original on July 15, 2011. RetrievedFebruary 20, 2010.
  42. ^abcPaumgarten, Nick (February 6, 2017)."The Second Avenue Subway Is Here!".The New Yorker. RetrievedFebruary 24, 2017.
  43. ^abWynne, Alexandra (January 20, 2009)."Fairytale of New York – Second Avenue Subway takes shape".New Civil Engineer. Archived fromthe original on May 15, 2009. RetrievedAugust 2, 2009.
  44. ^"Newsletter February 2014"(PDF).MTA.info.Metropolitan Transportation Authority. February 2014.
  45. ^Newman, Philip (June 23, 2012)."2nd Ave. subway project to receive $1.3B from gov't". Times Ledger. RetrievedMay 15, 2014.
  46. ^"Newsletter March 2013"(PDF).MTA.info.Metropolitan Transportation Authority. March 2013.
  47. ^Creag, Katherine (March 20, 2013)."Worker Trapped in Mud Beneath MTA Site Rescued After 4 Hours". NBC New York. RetrievedMay 15, 2014.
  48. ^"'The mud just grabbed me and wouldn't release me': Rescued Second Ave. subway worker who spent four hours in cold upper East Side muck recovering". New York: NY Daily News. March 20, 2013. RetrievedMay 15, 2014.
  49. ^"MTA subway worker trapped in tunnel rescued – News". METRO Magazine. RetrievedMay 15, 2014.
  50. ^Most, Doug,The race underground : Boston, New York, and the incredible rivalry that built America's first subway, First edition, New York : St. Martin's Press, February 2014.ISBN 978-0-312-59132-8.
  51. ^"96th Street Station Area"(PDF). Second Avenue Subway Newsletter. October 2013. RetrievedFebruary 14, 2016.
  52. ^"96th Street Station Area"(PDF). Second Avenue Subway Newsletter. November 2013. RetrievedFebruary 14, 2016.
  53. ^Lauren Evans (November 5, 2013)."Photos: 2nd Avenue Subway Line Shows Shocking Signs Of Progress". Gothamist. Archived fromthe original on February 5, 2014. RetrievedMay 15, 2014.
  54. ^Kastrenakes, Jacob (November 6, 2013)."Watch the gap: see New York's biggest subway projects take shape".The Verge. RetrievedMay 15, 2014.
  55. ^"2014 Q1 Quarterly Report"(PDF).MTA.info.Metropolitan Transportation Authority.
  56. ^"New Photos Show Second Avenue Subway Stations Nearing Completion".Gothamist. April 27, 2015. Archived fromthe original on May 1, 2015. RetrievedMay 2, 2015.
  57. ^"Community Board 8 Second Avenue Subway Task Force Update"(PDF).MTA.info.Metropolitan Transportation Authority. April 21, 2016.
  58. ^"May 2014 Newsletter"(PDF).MTA.info.Metropolitan Transportation Authority. May 2014.
  59. ^"June 2016 Newsletter"(PDF).MTA.info.Metropolitan Transportation Authority. June 2016.
  60. ^"Riders get sneak preview of 96th Street stop on Second Avenue Subway".ABC7 New York. December 22, 2016. RetrievedDecember 23, 2016.
  61. ^"Get a first look at the 2nd Avenue subway".am New York. RetrievedDecember 23, 2016.
  62. ^"MTA to propose $1.5B to Phase 2 of 2nd Ave. subway construction".Daily News. New York. August 7, 2014.
  63. ^Fitzsimmons, Emma G. (October 29, 2015)."Anger in East Harlem Over New Delays in 2nd Ave. Subway Plans".The New York Times. RetrievedNovember 3, 2015.
  64. ^"Video: Explore The Abandoned Second Avenue Subway Tunnels". Gothamist. February 1, 2012. Archived fromthe original on March 9, 2017.
  65. ^"New York City 2nd Ave Subway Phase 2 Profile"(PDF).FTA. December 27, 2016. Archived fromthe original(PDF) on January 5, 2017. RetrievedJanuary 4, 2017.
  66. ^"SUB-DIVISION B TRAIN OPERATOR/CONDUCTOR ROAD & NON-ROAD WORK PROGRAMS IN EFFECT: NOVEMBER 6, 2016"(PDF).progressiveaction.info. New York City Transit. July 29, 2016. RetrievedAugust 19, 2016.
  67. ^Putzier, Konrad."Real Estate Weekly » Blog Archive » Light at end of tunnel for Second Ave. subway". Rew-online.com. Archived fromthe original on September 7, 2017. RetrievedMay 15, 2014.
  68. ^"Exclusive: Progress Moves Ahead For Phase One Of Second Avenue Subway « CBS New York". Newyork.cbslocal.com. May 1, 2014. RetrievedMay 15, 2014.
  69. ^"Subway Map"(PDF).Metropolitan Transportation Authority. April 2025. RetrievedApril 2, 2025.
  70. ^Hession, Michael (May 2, 2014)."A Subterranean Stroll Through NYC's Newest Train Tunnel".Gizmodo. RetrievedMay 13, 2014.
  71. ^Rivoli, Dan (May 1, 2014)."Second Avenue Subway progress: Dec. 2016 end date on track".AM New York. RetrievedMay 14, 2014.
  72. ^Metropolitan Transportation Authority."Second Avenue Subway March 2014 Public Workshop Follow-Up Report, page 23"(PDF). RetrievedApril 21, 2016.
  73. ^Wynne, Alexandra (January 20, 2009)."Fairytale of New York – Second Avenue Subway takes shape | Features | New Civil Engineer". Nce.co.uk. Archived fromthe original on May 15, 2009. RetrievedAugust 2, 2009.
  74. ^"A Tour of NYC's Newest Subway Station With Its Architect".Curbed NY. September 21, 2015. RetrievedSeptember 24, 2015.
  75. ^"Second Avenue Subway — Past, Present & Future"(PDF).apta.com.MTA Capital Construction. Archived fromthe original(PDF) on September 23, 2015.
  76. ^Thorpe, Harriet (January 19, 2017)."AECOM-Arup completes the first phase of New York's Second Avenue Subway expansion".Wallpaper*. RetrievedJuly 31, 2024.
  77. ^Donohue, Pete (August 4, 2006)."Cooler Subways Coming Eventually".New York Daily News.Archived from the original on October 10, 2007. RetrievedDecember 12, 2008.
  78. ^Roberts, Sam (September 30, 2013)."No Heel Hazards (or Gusts) as Subway Expands".New York Times. New York. RetrievedMay 5, 2014.
  79. ^Nolan, Caitlin (May 16, 2014)."Second Avenue subway line construction is progressing: officials".NY Daily News. RetrievedMay 19, 2014.
  80. ^"NEW YORK CITY—Second Avenue Subway: MTA's Second Avenue Station and Tunnels Project"(PDF). Society for Mining, Metallurgy and Exploration.
  81. ^Neuman, William (April 5, 2007)."2nd Ave. Subway Platforms May Get Glass Walls and Sliding Doors".The New York Times.ISSN 0362-4331. RetrievedJanuary 12, 2017.
  82. ^Rubinstein, Dana (December 7, 2012)."No Seoul-style platform doors for New York subways, even in new stations".Politico.
  83. ^Stv Inc. (February 2020)."New York City Transit System-wide Platform Screen Door Feasibility Study Summary of Conclusions".Metropolitan Transportation Authority. p. 3384. RetrievedJanuary 28, 2022.
  84. ^"Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Figure 2-4 Track Diagram, North of 55th Street"(PDF).mta.info. Metropolitan Transportation Authority. May 2004. RetrievedAugust 7, 2016.
  85. ^ab"Second Avenue Subway Community Board 8 Second Avenue Subway Task Force Update"(PDF).mta.info. Metropolitan Transportation Authority. February 1, 2016. RetrievedFebruary 13, 2016.
  86. ^Dougherty, Peter (2006) [2002].Tracks of the New York City Subway 2006 (3rd ed.). Dougherty.OCLC 49777633 – viaGoogle Books.
  87. ^"The Line That Time Forgot – Second Avenue Subway". Nymag.com. April 5, 2004. RetrievedApril 10, 2014.
  88. ^"96th Street Station Area"(PDF). Second Avenue Subway Newsletter. February 2013. RetrievedJune 9, 2013.
  89. ^abLynch, Marley (January 23, 2014)."The future Second Avenue subway line will have cool art (slide show)". Timeout.com. RetrievedMay 15, 2014.
  90. ^abcdefKennedy, Randy (December 19, 2016)."Art Underground: A First Look at the Second Avenue Subway".The New York Times.ISSN 0362-4331. RetrievedDecember 19, 2016.
  91. ^"Subway Art on the Future Second Avenue Subway Line Revealed". Untapped Cities. April 28, 2014. RetrievedMay 15, 2014.
  92. ^ab"MTA - Arts & Design | NYCT Permanent Art".web.mta.info. RetrievedMay 19, 2022.
  93. ^Ben Yakas (January 22, 2014)."Here's What The Second Avenue Subway Will Look Like When It's Filled With Art". Gothamist. Archived fromthe original on March 30, 2014. RetrievedMay 5, 2014.
  94. ^Halperin, Julia (June 2, 2012)."A Preview of the MTA's Ultra-Contemporary Public Art for New York's Second Avenue Subway Line".Blouin Art Info. RetrievedMay 15, 2014.
  95. ^Oh, Inae (May 14, 2012)."Second Avenue Subway Public Art Project Commissions Chuck Close, Sarah Sze, Jean Shin".Huffington Post. RetrievedOctober 3, 2012.
  96. ^"From Chuck Close to Sarah Sze, a Ride Through the Art of the Second Avenue Subway".Hyperallergic. January 3, 2017. RetrievedJanuary 13, 2017.
  97. ^"Big art in the Second Avenue Subway will enliven the daily slog - Archpaper.com".archpaper.com. RetrievedJanuary 13, 2017.
  98. ^ab"MTA Neighborhood Maps: Upper East Side"(PDF).mta.info.Metropolitan Transportation Authority. 2016. RetrievedDecember 30, 2016.
  99. ^abcd"Introducing the Second Avenue Subway Make Second Avenue Q subway service, your first choice".mta.info. Metropolitan Transportation Authority. December 30, 2016. RetrievedDecember 30, 2016.
  100. ^ab"July 2015 Task Force Presentation"(PDF).MTA.info.Metropolitan Transportation Authority. July 2015. p. 37.
  101. ^ab"August 2015 Newsletter"(PDF).MTA.info.Metropolitan Transportation Authority. August 2015.
  102. ^"Our Location". Metropolitan Hospital Center. Archived fromthe original on December 12, 2011. RetrievedJune 11, 2014.The new Second Avenue subway line, which is currently under construction, will have a station in front of the hospital's entrance.
  103. ^"SECOND AVENUE SUBWAY PROJECT"(PDF). February 21, 2012. p. 20. RetrievedOctober 24, 2016.
  104. ^"Second Ave. station entrance sagas hit 96th St". Second Avenue Sagas. December 22, 2009. RetrievedMay 15, 2014.
  105. ^"Construction Creeps Downtown".New York Press. Our Town. October 7, 2009. Archived fromthe original on June 13, 2014. RetrievedJune 12, 2014.
  106. ^abHughes, C.J. (April 8, 2016)."Yorkville Bets on the Second Avenue Subway".The New York Times. RetrievedApril 13, 2016.
  107. ^"Shops along Second Ave. subway line construction sites want big bucks in 2014". New York: NY Daily News. January 7, 2014. Archived fromthe original on March 16, 2014. RetrievedMay 5, 2014.
  108. ^Acitelli, Tom (March 1, 2014)."Upper East Side sees boost from Second Avenue subway progress".The Real Deal. RetrievedMay 13, 2014.
  109. ^Schlossberg, Tatiana (October 2, 2014)."Promise of New Subways Has West Siders Excited and East Siders Skeptical".The New York Times. RetrievedOctober 26, 2014.
  110. ^"Businesses hope for boost with 2nd Avenue subway launch".ABC7 New York. December 20, 2016. RetrievedDecember 23, 2016.
  111. ^Barone, Vincent (December 20, 2016)."UES community, officials excited for 2nd Ave. subway".am New York. RetrievedDecember 23, 2016.

External links

[edit]
Wikimedia Commons has media related to96th Street (IND Second Avenue Line).
"q" trainSecond Avenue/
 Broadway Express/
 Brighton Local
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Note: Service variations, station closures, and reroutes are not reflected here.
    Stations with asterisks have no regular peak, reverse peak, or midday service on that route. See linked articles for more information.
Second Ave. Line
"N" train"Q" train"R" train
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Stations and line segments initalics are closed, demolished, or planned (temporary closures are marked with asterisks). Track connections to other lines' terminals are displayed in brackets.Struck through passenger track connections are closed or unused in regular service.
Buildings
59th–72nd Sts
72nd–86th Sts
86th–96th Sts
Former
Culture
Shops, restaurants
Museums
Theaters/performing arts
Galleries
Hotels
Social clubs
Former
Green spaces/recreation
Education
Libraries
Primary and secondary
Post-secondary
Other institutions
Religion
Churches, chapels
Synagogues
Other
Health
Defunct
Transportation
Subway stations
Streets
Other
Related topics
Retrieved from "https://en.wikipedia.org/w/index.php?title=96th_Street_station_(Second_Avenue_Subway)&oldid=1322556838"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp