From Wikipedia, the free encyclopedia
New York City Subway expansion

7 Subway Extension
"7" train"7" express train
The 7 and 7 Express (designated as <7> on rolling stock) services serve the entire 7 Subway Extension.
Overview
OwnerCity of New York
LocaleManhattan,New York City
Termini
Stations1constructed
(1proposed)
Service
TypeRapid transit
SystemNew York City Subway
Operator(s)New York City Transit Authority
History
OpenedSeptember 13, 2015; 10 years ago (2015-09-13)
Technical
Line length1.5 mi (2.4 km)
Number of tracks2
CharacterUnderground
Track gauge4 ft 8+12 in (1,435 mm)
Electrification625VDCthird rail

The7 Subway Extension is asubway extension of theNew York City Subway'sIRT Flushing Line, which is served by the7 local and<7> express services. The extension stretches 1.5 miles (2.4 km) southwest from its previous terminus atTimes Square, at Seventh Avenue and 41st Street, toone new station at 34th Street and Eleventh Avenue. A second station at10th Avenue and 41st Street was dropped from the plans in October 2007. The entirety of the extension is located within theNew York City borough ofManhattan. The extension, a key part of theHudson Yards Redevelopment Project, is expected to bring business and entertainment into the area, as well as aid redevelopment of nearbyChelsea andHell's Kitchen, located around theLong Island Rail Road'sWest Side Yard. The extension also serves the nearbyJacob K. Javits Convention Center.

The project was originally proposed in 2005 as part of the Hudson Yards project, which included the failed attempt to build theWest Side Stadium for theNew York Jets andthe city's bid for the2012 Summer Olympics. Although the stadium plan was rejected by the state legislature, the rest of theHudson Yards rail yard development, including the 7 Subway Extension, went forward. Construction on the extension started in 2007.

The extension's opening was postponed multiple times from its original target of December 2013. The delays were attributed to a variety of problems, mostly involving the 170-foot-long (52 m)incline elevators that were custom-designed for the new station. The extension finally opened to the public on September 13, 2015.

Historical context

[edit]
A map of the subway extension, showing that the extension goes from Times Square to the intersection of 11th Avenue and 34th Street.
Map of the Manhattan portion of the Flushing Line, and nearby subway lines. The unbuilt10th Avenue station is shown. The solid purple segment represents the pre-existing portion of the Flushing Line, while the dashed purple segment represents the new portion of the Flushing Line, and the dashed blue segment represents storage tracks south of34th Street–Hudson Yards.

Proposals to extend the transit system to the Far West Side to support massive redevelopment were floated as early as 1969, when theNew York City Planning Commission's (CPC's) master plan proposed to expand midtown westward along a 48th Street transit line to replace what the plan described as "blocks of antiquated and deteriorating structures of every sort" between Eighth and Twelfth avenues.[1] That proposal for the West 40s and 50s failed after voters rejected a state bond issue that would have financed the proposed new east–west transit line or "people mover."[2] Subsequently, attention shifted to the West 30s and theIRT Flushing Line.

In response to the CPC's 1993 proposal to improve access to the Manhattan Central Business District,[3] theMetropolitan Transportation Authority (MTA) began exploring the possibility of a 7 extension to New Jersey.[4] In June 2001, a business and civic group convened by SenatorCharles Schumer argued that a westward extension of the Midtown office district could not be accomplished without a subway extension, saying:[5]

The long blocks along the avenues make the walk as long as 20 minutes to the westernmost parts of the area. In addition, there is no convenient link fromGrand Central Station or elsewhere on the east side of Manhattan, making the Far West Side a difficult commute for workers from parts ofManhattan,Queens,Westchester andConnecticut.[5]

In December 2001, theNew York City Department of City Planning issued a study entitledFar West Midtown: A Framework for Development that recommended zoning changes and an extension of the Flushing Line to revitalize Far West Midtown. Thegovernment of New York City devised a rezoning plan for the Hudson Yards area and proposed two new subway stations to serve that area, with the extension of the subway to be financed by $2.1 billion of city-issued bonds. The project also included an expansion of theJavits Center and a proposedWest Side Stadium, the latter of which was to serve as the venue of the opening and closing ceremonies and track and field events in theNew York City bid for the 2012 Summer Olympics.[6][7][8] The City wanted to get funding before July 2005, at which time theInternational Olympic Committee would vote on funding. However, due to shortfalls in the MTA's Capital Program, as well as preexisting funding for theSecond Avenue Subway andEast Side Access, the MTA could not pay to fund the extension.[4] After the proposal for the West Side Stadium was rejected in 2005,[9] New York City quickly lost their Olympic bid.[10] The subway extension was approved[4] following the successful rezoning of about 60 blocks from 28th to 43rd Streets, which became theHudson Yards neighborhood.[11]

MayorMichael Bloomberg's December 12, 2006, address to the New YorkLeague of Conservation Voters noted that in November 2006, the government began issuing bonds to fund the extension of the 7 subway to Eleventh Avenue and 34th Street.[12] The $2.4 billion extension was funded with New York City funds from municipalTax Increment Financing (TIF) bond sales that are expected to be repaid with property tax revenues from future developments in areas served by the extension.[13]

Construction progress

[edit]

In October 2007, theMetropolitan Transportation Authority (MTA) awarded a $1.145 billion contract to build 7,000 feet (2,100 m) of twin-tube tunnel from the 7 train's then-terminus at Times Square to the then-planned shell of the 34th Street–Hudson Yards station. The contract was awarded to S3, a joint venture of J.F. Shea,Skanska USA Civil, and Schiavone.[14][15][16] The extension's construction was overseen by the MTA'sCapital Construction division.[8] Dattner Architects, designed the 34th Street station.[17] After excavating the new terminal's shell and creating the first 1,000 feet (300 m) of tunnel using the drill-and-blast method, S3 placed twotunnel-boring machines (TBMs) in the ground to dig the remaining 6,000 feet (1,800 m); as it dug, each TBM placed precast concrete liner segments to create the tunnel interior.[17]

Early on in the project, it was announced that the new stations would featureplatform screen doors.[18] The stations (along with the newSouth Ferry station on theIRT Broadway–Seventh Avenue Line and the three Phase 1Second Avenue Subway stations on theUpper East Side) would include special air-cooling systems to reduce the temperature along platforms.[19] Due to its depth, the extension has ventilation towers, rather than the ventilation grates ubiquitous in the rest of the subway system.[20]

However, in October 2007, soon after the announcement of the new extension, the 10th Avenue station was canceled due to an overrun of the $2.4 billion budget,[14] and the MTA did not have an extra $500 million to build the 10th Avenue station.[21][22] On December 3, 2007, the MTA conducted a ceremony at the Times Square subway station marking the launch of construction of the 7 train extension. The contractor began excavating the station cavern adjacent to the Javits Convention Center.[23] One physical hindrance to the construction of the extension was the lower-level platform at42nd Street–Port Authority Bus Terminal on theIND Eighth Avenue Line. The abandoned platform was partially razed to allow the 7 train extension to be built.[24] In order for the TBMs to meet up with the existing lay-up tracks west of Times Square, the Eighth Avenue Line had to be underpinned to support the existing line.[25]

An aerial view of a construction site for the extension, with buildings surrounding it.
Overview of subway construction area with arrows pointing to the entrances. (Left arrow points to main 34th Street entrance; right arrow, secondary 35th Street entrance.)

In June 2008, construction on the tunnels began along Eleventh Avenue in Manhattan.[26] In February 2009, S3 lowered the first of two tunnel-boring machines into a giant shaft at the corner of 25th Street and Eleventh Avenue. The two boring machines dug parallel 7,100-foot (2,200 m) long tunnels north along Eleventh Avenue to the current terminus of the 7 service at 41st Street and Times Square.[27] The MTA posted a construction update with photographs on its website in November 2008, showing substantial progress.[28]

The MTA completed excavation of a 150-foot (46 m) long cavern in June 2009. The cavern was dug below the bus entrance ramp to the lower level of thePort Authority Bus Terminal and formed part of the eastern end of the new extension and connected it to the Times Square station. At the same time, tunnels were being dug northward from the machine shaft at 26th Street; soft ground at 27th and 28th Street required 300 feet (91 m) of ground to be frozen so that the tunnel-boring machines could easily dig through the soil.[29] On December 21, 2009, it was announced that a tunnel-boring machine broke through the 34th Street station cavern wall.[29][30] Both tunnel-boring machines were scheduled to finish the required tunneling in the spring of 2010.[31]

In June 2010, one of the TBMs completed its tunnel at the cavern.[32] The second TBM broke through the wall of the cavern on July 15, 2010, completing its tunneling operation.[33] The TBMs were partially disassembled and backed up to the 25th Street shaft, where they were lifted out.[32][33][34] In April 2011, the MTA announced that the contract covering the tunnels, the 34th Street station mezzanine and passenger platform was 85% complete, and that the systems contract, covering mechanical and electrical systems, electric power, lighting and train tracks would be awarded by July 2011. A second entrance to the station is planned.[35] In May 2012, the MTA announced that the extension, now 65% complete, had received the installation of the first set of rails.[36]

People speaking at a ceremonial speech at the 34th Street station on December 20, 2013
Mayor Bloomberg at the 34th Street station on December 20, 2013

On August 21, 2013, the MTA announced that the 7 Subway Extension was 90% complete.[37] On December 20, 2013, MayorMichael Bloomberg took a ceremonial ride on a train to the new terminal, celebrating a part of his legacy as Mayor; at the time, the proposed opening date was June 2014.[38][39]

Delays

[edit]

Soon after Bloomberg's ceremonial ride, the opening date of the subway extension was postponed from June to early fall 2014,[40] then to November 2014,[41] then to February 2015,[42] and then to May 2015.[43] Most of the problems were attributed to theincline elevators being installed in the station,[44] and to the ventilation fans along the tunnel.[42]

On October 1, 2014, the MTA told theNew York Daily News that the agency had signed a new agreement with the prime contractor, offering up to $4.75 million in incentive payments if the new station was finished and ready to open to the public by February 24, 2015.[45]

Just two and a half months later, though, the MTA stated that it was unable to open the subway extension for service until April to July 2015, due to the failure to get the inclined elevators to work properly.[43][46] Problems with the security and fire alarm systems were also blamed for the delays.[47] A December 2014New York Post article attributed the delay to theHudson Yards rail yard development's developer,The Related Companies', need to digcaissons for the foundations, just above the subway station, and the foundation work needed to be complete before the MTA could open the station.[48] Continuing trouble with the fire and security alarms in March 2015 would delay the opening until summer.[49][50]

The use of inclined elevators was intended to provide wheelchair-using patrons with a shorter, easier path to the train platform, as well as to reduce tunneling costs.[40] The two elevators were manufactured by Maspero Elevatori, inAppiano Gentile, Italy, using a controller made on Long Island, speed governors made inOhio, and buttons and other parts in Queens.[40] The software for the elevator was written in the United States. Maspero Elevatori assembled the elevators in Italy, and they failed an operational test there, prior to being shipped to the United States.[40] The MTA said the manufacturer chose to use American subcontractors in place of local Italian suppliers after reading the specifications the transit agency submitted. The MTA had been working with the manufacturer to try to resolve the problems caused by a very high level of customization.[40]

On June 1, 2015, a representative for the MTA described the extension as "99% complete". That day, test runs of 7 trains started running to 34th Street–Hudson Yards in preparation for the summer 2015 opening of the extension.[51] However, on June 15, the extension was postponed again to "before the end of the third quarter".[52] On July 20, 2015, it was reported that the MTA planned to open the extension to the public on September 13, 2015.[53][54] The opening date was confirmed on August 28, 2015.[55][56] The station was opened at a ribbon-cutting ceremony on September 13 at about 1 p.m.[57][58][59][60]

Gallery

[edit]
  • Digging the station cavern
    Digging the station cavern
  • Construction Site P, 11th Avenue and 33rd Street in May 2010
    Construction Site P, 11th Avenue and 33rd Street in May 2010
  • Extension work during night time
    Extension work during night time
  • Tunnel under construction on January 26, 2012
    Tunnel under construction as of January 26, 2012[update]
  • Mezzanine and trackways under construction
    Mezzanine and trackways under construction
  • Tunnel portals at end of station cavern
    Tunnel portals at end of station cavern
  • Construction of tracks connecting Times Square Station to the line extension in March 2012
    Building tracks connectingTimes Square to the line extension in March 2012
  • Tunnel progress in September 2012
    Tunnel progress in September 2012
  • Ventilation structure at 11th Avenue and 36th Street, near construction site K
    Ventilation structure at 11th Avenue and 36th Street, near construction site K
  • Tunnel on the 7 Subway Extension, under construction
    Tunnel on the 7 Subway Extension, under construction
  • Tracks in the station, April 2013
    Tracks in the station, April 2013
  • The 7 Subway Extension, as viewed from Times Square Station on November 25, 2013
    Extension, as viewed fromTimes Square on November 25, 2013. The fake wall has been removed
  • Station entrance under construction in May 2014
    Station entrance under construction in May 2014
  • Rendering of Site A building between 25th and 26th Street, June 2013
    Rendering of Site A building between 25th and 26th Street, June 2013

Construction areas

[edit]

34th Street–Hudson Yards station

[edit]
Station mezzanine progress in 34th Street Station in June 2011
Progress on constructing the34th Street–Hudson Yards station mezzanine as of June 2011
Main article:34th Street–Hudson Yards station

The 34th Street–Hudson Yards station is under the intersection of11th Avenue and34th Street. It is the only station on the extension, and it opened on September 13, 2015.[57][58][59] The MTA says that the new station will "make it possible for new housing, restaurants and entertainment to grow" in the surrounding neighborhoods, includingHell's Kitchen andChelsea.[61] The station is also close to theJacob K. Javits Convention Center.[62]

Passenger access to the station includes a pair of incline elevators.[44] The project has been plagued by delays because of the mishaps involved in the installation of the custom-made elevators.[63] In June 2012, the extension's opening was delayed to June 2014, with the rest of the 34th Street–Hudson Yards station to open at the end of 2015;[64][65] As of December 15, 2014[update], the opening date was changed to mid-2015.[43][46] In April 2014, the first of the 170-foot-long (52 m) incline elevators was installed in the station.[44] The 80-foot (24 m) high incline elevators[25][66] are the first of their kind in the system.[44] The station is the third station in the New York City Subway to have low vibration tracks installed. These tracks provide a smoother, quieter ride for passengers, and eliminate the need for wooden track blocks.[25]

Above-ground structures

[edit]

The extension contains five street-level structures:[67]

  • Site A, a ventilation building at 11th Avenue between 25th and 26th Streets[67]
  • Site J, a ventilation building at 11th Avenue between 33rd and 34th Streets next to the main entrance and elevator entrance,[67] which was originally a free-standing structure and subsequently incorporated into55 Hudson Yards.[68]
  • Site K, a ventilation building at 11th Avenue between 35th and 37th Streets[67]
  • Site L, a ventilation building at 41st Street andDyer Avenue[67]
  • Site P, the secondary station entrance between 11th Avenue between 34th and 35th Streets[67]

Proposals

[edit]
The diamond crossover north of 34th Street

10th Avenue station

[edit]
Further information:10th Avenue (IRT Flushing Line)

Although a new station at 10th Avenue and 41st Street was part of the original plan, the intermediate station was eliminated in October 2007 due to cost overruns, leaving the terminal station at Eleventh Avenue and 34th Street as the only new station on the extension. The MTA indicated that the 10th Avenue station could be included in the project if funding were found.[14] The station was not included in the original (2007) contract award, but was listed as a $450 million option. In late December 2007, reports indicated that the postponed station might be partially built if the City of New York and the MTA agreed on the additional financing for the station shell.[69] In February 2009, the MTA announced that it would build the station if the agency received sufficient funds from thefederal economic stimulus package.[70] In June 2010, the city announced it was seeking funding to assess the feasibility of constructing the station at a later date using a two-platform, two-entrance model without an underground connecting passage.[71][72][73][74][75]

Construction of the line proceeded to its completion in 2014 without the station or its shell.[76][77] In January 2016, theNew York City Economic Development Corporation released arequest for proposal (RFP) for a site of a proposed development at 41st Street and Tenth Avenue,[78][79] including a study into the 10th Avenue station's feasibility.[80] The new station was projected to cost $1 billion at the time.[81]New York City Council candidateErik Bottcher proposed completing the station in mid-2021,[82] and elected officials again pushed for the station's construction in August 2022.[83][84] By 2023, the MTA predicted that the station could cost $1.9 billion.[85]

Extensions to New Jersey

[edit]

In 2010,The New York Times reported that MayorMichael Bloomberg's administration had been considering an extension toHoboken and toSecaucus Junction inNew Jersey, allowing commuters from that state to more easily accessGrand Central Terminal and other subway routes.[86] If opened, the extension would take the New York City Subway outside the borders of both New York City andNew York state for the first time.[87] The planned extension would have cost less than the canceledAccess to the Region's Core project, but travel times would be longer than the ARC project.[88] The project, which could require five additional years to develop, would not be automatically entitled to the federal funding allotted to the ARC tunnel.[89][90][91]

On February 2, 2011, the city's Economic Development Corporation voted to budget up to $250,000 for afeasibility study of the proposed New Jersey extension, carried out by engineering firmParsons Brinckerhoff.[92][93] Amtrak's February 2011 announcement of theGateway Project, which entailed two new commuter rail tunnels under the Hudson River, included a proposal to extend the 7 service three blocks east of Eleventh Avenue toNew York Penn Station, instead of five miles west to Secaucus.[94]Congress allocated $15 million for studies for the project in November 2011, with the likelihood that Gateway and the subway extension would be in competition for funding.[95] In April 2012, citing budget considerations, the director of theMTA,Joe Lhota, said that it was doubtful the extension would be built in the foreseeable future.[96] After the Parsons Brinckerhoff feasibility study was released in April 2013,[97][98] Bloomberg said: "Extending the 7 train to Secaucus is a promising potential solution ... and is deserving of serious consideration."[97][99] In November 2013, theNew Jersey Assembly passed Resolution 168[100] supporting the extension of the line toHoboken and Secaucus.[101]

In 2017, a further extension of the 7 train to New Jersey was suggested once again, this time as an alternative to constructing a replacement for the Port Authority Bus Terminal.[102] An alternative would include a new terminal at Secaucus Junction in connection with the 7 extension.[103] In February 2018, it was revealed that the Port Authority had advertised for consultants to write an 18-month feasibility study for such an extension, and that it had received bids from several companies. This extension was being planned along with the Gateway Project and, if built, would be able to accommodate a projected 38% increase in the number of people commuting between the two states.[104][105] If the New Jersey subway extension were constructed, it could complement the Gateway Project, which was predicted to become overcrowded by 2040.[105][106] At the time, the Port Authority was upgrading thePATH system, the only rapid transit link between New York and New Jersey, to accommodate more frequent trains.[105]

Extension to 14th Street

[edit]

TheRegional Plan Association, in its Fourth Plan in 2017, proposed extending the 7 subway down the tail tracks and the Hudson waterfront to a new station at 14th Street and Tenth Avenue, with an intermediate stop at 23rd Street and Eleventh Avenue. If constructed, the new Tenth Avenue station would feature a pedestrian connection to the14th Street/Eighth Avenue station, with transfers to theA, ​C, ​E​, and L trains, and the tunnel would be configured to allow for a New Jersey extension.[107]

Awards and innovations

[edit]

The New York State Society of Professional Engineers awarded the first construction phase, "Running Tunnels and Underground Structures," its 2013 Construction Project of the Year. According to the society, the project team won the award "for outstanding professional engineering efforts in developing creative solutions and innovative technologies in construction of an infrastructure project. The No. 7 project used the first double-shieldedtunnel boring machines (TBMs) to tunnel under New York City while placing precast concrete segments to form the tunnels' walls. For the first time in the world, aground freezing method was used to harden soil to act as rock to allow TBMs to maintain proper course while boring and placing the tunnel liners."[108] While the extension extends 1 mile (1.6 km), the tunnels are actually 1.5 miles (2.4 km) long.[109]

See also

[edit]

References

[edit]
  1. ^Stern, Michael (December 8, 1970)."6TH AND LAST PART OF MASTER PLAN ON CITY RELEASED; Volume on Manhattan Urges Building of Offices Along 48th St. Transit Line WESTWARD PATTERN SET Condemnation of Big Tracts Intended to Insure Public Use of Some of Area".The New York Times. RetrievedSeptember 20, 2015.
  2. ^Witkin, Richard (November 4, 1971)."State Will Cancel Some Road Projects".The New York Times.
  3. ^Department of City Planning,"Shaping the City's Future," 1993.
  4. ^abcMoss, Mitchell L. (November 2011)."HOW NEW YORK CITY WON THE OLYMPICS"(PDF).Rudin Center for Transportation Policy and Management, Robert F. Wagner Graduate School of Public Service.New York University. RetrievedSeptember 11, 2015.
  5. ^abPreparing for the Future: A Commercial Development Strategy for New York City : Final Report. Group of 35. June 11, 2001. p. 56. RetrievedSeptember 12, 2015.
  6. ^"No. 7 Subway Extension—Hudson Yards Rezoning and Development Program FGEIS"(PDF). nyc.gov. 2004. pp. 1–1,1–11,1–14,1–15. RetrievedMarch 11, 2025.
  7. ^"No. 7 Subway Extension".Hudson Yards Development Corporation. Archived fromthe original on February 9, 2015. RetrievedJuly 3, 2013.
  8. ^abDobnik, Verena (February 7, 2013)."NYC Transit Projects: East Side Access, Second Avenue Subway, and 7 Train Extension".Huffington Post. Archived fromthe original on October 21, 2013. RetrievedJuly 24, 2013.
  9. ^Bagli, Charles V.; Cooper, Michael (June 7, 2005)."Olympic Bid Hurt as New York Fails in West Side Stadium Quest".The New York Times. RetrievedSeptember 12, 2015.
  10. ^Bernstein, Andrea (July 6, 2005)."New York Comes in a Disappointing Fourth Place".WNYC. RetrievedSeptember 12, 2015.
  11. ^Purnick, Joyce (January 2, 2005)."What Rises in the West? Uncertainty".The New York Times. RetrievedMarch 6, 2010.
  12. ^Hinderer, Katie (December 13, 2006)."NYC Mayor Outlines Long-Term Growth Plan".GlobeSt.com. Archived fromthe original on May 13, 2009. RetrievedFebruary 28, 2010.
  13. ^Cuza, Bobby (December 7, 2006)."City Raises $2 Billion In Bonds For No. 7 Line Extension".NY1. Archived fromthe original on October 11, 2007. RetrievedFebruary 28, 2010.
  14. ^abc"Transit Board Approves Funding For 7 Line Extension".NY1. October 25, 2007. Archived fromthe original on March 25, 2008. RetrievedFebruary 28, 2010.
  15. ^"Top New York Projects"(PDF).New York Construction. June 2008. p. 27. Archived fromthe original(PDF) on July 8, 2011. RetrievedFebruary 28, 2010.
  16. ^"Mayor Bloomberg and Governor Spitzer Announce Start of Construction on #7 Subway Extension" (Press release).New York City Mayor's Office. December 3, 2007. RetrievedFebruary 28, 2010.
  17. ^ab"No. 7 Subway Line Extension".Dattner Architects. Archived fromthe original on March 15, 2012. RetrievedFebruary 28, 2010.
  18. ^"MTA Plans To Install Platform Doors On 7 Line Extension".NY1. September 8, 2007. Archived fromthe original on March 25, 2008. RetrievedFebruary 28, 2010.
  19. ^Donohue, Pete (August 4, 2006)."Cooler Subways Coming – Eventually".Daily News. New York.Archived from the original on December 27, 2016. RetrievedFebruary 28, 2010.
  20. ^Roberts, Sam (September 30, 2013)."No Heel Hazards (or Gusts) as Subway Expands".New York Times. New York. RetrievedMay 5, 2014.
  21. ^Neuman, William (October 20, 2007)."Higher Costs Force Cutback in Extension of the No. 7 Line".The New York Times. RetrievedSeptember 28, 2015.
  22. ^Olshan, Jeremy (October 21, 2007)."MTA: IT'S WESTWARD HO(LD ON A $EC) FOR NO. 7 TRAIN".Internet Archive. Archived fromthe original on October 21, 2007.
  23. ^"MTA starts work on No. 7 train extension".AM New York. December 14, 2007. Archived fromthe original on December 14, 2007.
  24. ^Mindlin, Alex (April 20, 2008)."No Whoosh, No 'All Aboard'".The New York Times. RetrievedFebruary 28, 2010.
  25. ^abc"mta.info | Capital Programs 7 Line Extension".web.mta.info. Archived fromthe original on March 4, 2016. RetrievedAugust 30, 2016.
  26. ^"Easy-to-Install CertainTeed Certa-Lok Yelomine Offers Ideal Solution for Temporary Water Lines for Metropolitan Transportation Authority's No. 7 Subway Extension" (Press release). CertainTeed. January 25, 2011.
  27. ^"Metropolitan Transportation Authority And Mayor Bloomberg Preside Over Lowering Of Tunnel Boring Machine For 7 Line Subway Extension" (Press release).Metropolitan Transportation Authority. February 19, 2009. Archived fromthe original on December 18, 2010. RetrievedFebruary 28, 2010.
  28. ^"Construction Update — November 2008".Metropolitan Transportation Authority. Archived fromthe original on October 5, 2009. RetrievedAugust 27, 2009.
  29. ^ab"Mayor Bloomberg And Mta Announce Completion Of First Phase Of Number 7 Subway Extension".NYC.gov. December 21, 2009. Archived fromthe original on June 20, 2015. RetrievedJune 9, 2014.
  30. ^"West Side Development Project Gets The Green Light".NY1. December 21, 2009. Archived fromthe original on April 7, 2012. RetrievedFebruary 28, 2010.
  31. ^Cuza, Bobby (February 19, 2009)."Crews Lower Giant Drill Into 7 Line Tunnel".NY1. Archived fromthe original on May 5, 2009. RetrievedFebruary 28, 2010.
  32. ^ab"New Milestone for No. 7 Subway Extension Project".Metropolitan Transportation Authority. June 11, 2010. Archived fromthe original on June 13, 2010. RetrievedJune 12, 2010.
  33. ^ab"New Milestone for No. 7 Subway Extension Project".Metropolitan Transportation Authority. July 15, 2010. Archived fromthe original on July 24, 2010. RetrievedJuly 16, 2010.
  34. ^"7 Train Extension Celebrates Major Breakthrough".NY1. July 15, 2010. Archived fromthe original on September 29, 2012. RetrievedJuly 16, 2010.
  35. ^"Work on Extending the No. 7 Line Continues to Progress".MTA. April 4, 2011. Archived fromthe original on August 20, 2011. RetrievedApril 4, 2011.
  36. ^Miller, Luther S. (May 10, 2012)."NYCT's No. 7 extension gets first rails".Railway Age. Archived fromthe original on May 13, 2012. RetrievedMay 14, 2012.
  37. ^"7 Line Extension 90 Percent Complete". MTA Press Release. Archived fromthe original on July 2, 2018. RetrievedAugust 22, 2013.
  38. ^"Three cheers for the No. 7 extension".New York Post. December 20, 2013.
  39. ^Fermino, Jennifer (October 21, 2013)."Mayor Bloomberg gets ride on No. 7 subway line extension he championed".NY Daily News. New York. Archived fromthe original on December 22, 2013. RetrievedDecember 22, 2013.
  40. ^abcdeFlegenheimer, Matt (January 27, 2014)."More Delays and Rising Cost for Project Connecting L.I.R.R. to Grand Central Terminal".New York Times.
  41. ^Lynch, Marley (February 26, 2014)."Subway update: 7-train extension to now open in November".Time Out New York. Archived fromthe original on March 6, 2016. RetrievedSeptember 13, 2015.
  42. ^abMueller, Benjamin (June 23, 2014)."Transit Hub and Work on No. 7 Line Face Delays".New York Times.
  43. ^abcDonohue, Pete (December 15, 2014)."New York will have to wait till spring for No. 7 subway extension".NY Daily News. RetrievedDecember 15, 2014.
  44. ^abcdDonohue, Pete (April 28, 2014)."Metropolitan Transportation Authority building New York City subway system's first inclined elevator".New York Daily News. RetrievedApril 29, 2014.
  45. ^Donohue, Pete (October 1, 2014)."No. 7 subway line extension to West Side on track to open in February: official".New York Daily News. Archived fromthe original on October 1, 2014.
  46. ^abSill, Andrew (December 15, 2014)."Hudson Yards subway extension delayed again".NBC New York.
  47. ^Goldberg, Barbara (December 21, 2014)."NYC subway extension may transform Manhattan neighborhood". McCall.com. Archived fromthe original on December 30, 2014. RetrievedDecember 30, 2014.
  48. ^Harshbarger, Rebecca (December 15, 2014)."7 train opening delayed".New York Post.
  49. ^"7 subway line extension delayed yet again, eyes summer opening".New York Business Journal. March 24, 2015.
  50. ^Fitzsimmons, Emma G. (March 24, 2015)."More Delays for No. 7 Subway Line Extension".The New York Times. RetrievedMarch 29, 2015.
  51. ^"MTA Begins Training Employees On No. 7 Line Extension".CBS News. June 1, 2015. RetrievedJune 1, 2015.
  52. ^Martinez, Jose (June 15, 2015)."MTA: 7 Line Extension to Open Up Before End of Third Quarter".NY1. RetrievedJune 20, 2015.
  53. ^Whitford, Emma (July 20, 2015)."7 Line Extension Will Open "By September 13th"".Gothamist. Archived fromthe original on July 22, 2015.
  54. ^Siff, Andrew (July 2015)."Hudson Yards Subway Extension to Open in September: MTA".NBC New York.
  55. ^Tangel, Andrew (August 28, 2015)."At Last: New Station for 7 Train Set to Open".WSJ. RetrievedSeptember 10, 2015.
  56. ^Newman, Philip (September 10, 2015)."No. 7 station to open at last on 11th Ave. in Manhattan".TimesLedger. Archived fromthe original on September 25, 2015. RetrievedSeptember 10, 2015.
  57. ^abFitzsimmons, Emma G. (September 10, 2015)."Subway Station for 7 Line Opens on Far West Side".The New York Times. RetrievedSeptember 13, 2015.
  58. ^ab"New 7 line subway extension to the West Side opens".ABC7 New York. September 13, 2015. RetrievedSeptember 13, 2015.
  59. ^abTangel, Andrew (September 13, 2015)."New Subway Station Opens on NYC's Far West Side".WSJ. RetrievedSeptember 13, 2015.
  60. ^"New 34 St-Hudson Yards7 Station Opens".Building for the Future. New York, New York:Metropolitan Transit Authority. Archived fromthe original on March 4, 2016. RetrievedMarch 10, 2016.The new station opened September 13, 2015
  61. ^Staff writer(s)."7 Line Extension".Metropolitan Transportation Authority. RetrievedJuly 3, 2013.
  62. ^Green, Dennis (April 29, 2015)."A series of delays have kept a now fully completed subway station under Manhattan from opening".Business Insider. RetrievedSeptember 13, 2015.The troubled extension ... will eventually extend the 7 train one station west to serve a new development over the West Side Yard train tracks (known as Hudson Yards) and finally provide a rail link to the Jacob Javits Convention Center.
  63. ^Flegenheimer, Matt (May 29, 2014)."With New Slant on Subway Elevators, Expect Delays".The New York Times. RetrievedMay 29, 2014.
  64. ^"MTA's 7 Line Extension Project Pushed Back Six Months".NY1. June 5, 2012. Archived fromthe original on July 11, 2012. RetrievedJune 5, 2012.
  65. ^Cuozzo, Steve (June 5, 2012)."No. 7 train 6 mos. late".New York Post. RetrievedJune 5, 2012.
  66. ^Flegenheimer, Matt (December 20, 2013)."For a Mayor on His Way Out, a Subway Station on Its Way In".The New York Times. RetrievedDecember 24, 2013.
  67. ^abcdef"Capital Program 7 Line Extension". MTA.info. December 20, 2013. Archived fromthe original on March 4, 2016. RetrievedJanuary 30, 2014.
  68. ^"Infrastructure Week: Constructability".Dattner Architects. May 17, 2018. RetrievedMarch 11, 2025.
  69. ^Naanes, Marlene (December 20, 2007)."7 Line Extension May Get 41st Street Stop".amNewYork. Archived fromthe original on May 13, 2009. RetrievedFebruary 28, 2010.
  70. ^Kabak, Benjamin (February 2, 2009)."Will the Stimulus Save 7 Extension Stop?".Second Ave. Sagas. RetrievedFebruary 28, 2010.
  71. ^Agovino, Theresa (February 16, 2010)."Outcry Emerges for 41st St. Stop on New 7-Line".Crain's New York Business.Archived from the original on February 18, 2010. RetrievedApril 3, 2010.
  72. ^Urban, Jill (April 2, 2010)."West Side Developers Fight For 7 Line Extension".NY1. Archived fromthe original on April 17, 2010. RetrievedApril 3, 2010.
  73. ^"City Officials Seek Federal Assistance For 7 Subway Extension".NY1. April 27, 2010. Archived fromthe original on May 31, 2010. RetrievedApril 27, 2010.
  74. ^"City Considering 10th Avenue Stop For 7 Train".NY1. June 10, 2010. Archived fromthe original on September 27, 2012. RetrievedJune 10, 2010.
  75. ^"Mayor Applies For Funds To Redesign 7 Train Extension".NY1. June 30, 2010. Archived fromthe original on July 14, 2011. RetrievedJune 30, 2010.
  76. ^MTA.info—Video Release: Mayor Bloomberg Rides First 7 Train to 34 St - 12/20/2013 onYouTube. Retrieved May 27, 2014. (The tunnel wall flattens out between approximately 2:58 and 3:11 into the video.)
  77. ^Video inside the 7 extension Second Avenue Sagas.com
  78. ^Rajamani, Maya (April 4, 2016)."MTA Revives Plans for 10th Avenue Station on 7 Line".DNAinfo New York. Archived fromthe original on November 10, 2017. RetrievedJune 8, 2021.
  79. ^Plitt, Amy (January 27, 2016)."City Seeking Proposals For Huge Midtown West Mixed-Use Site".Curbed NY. RetrievedJanuary 29, 2016.
  80. ^"HELL'S KITCHEN AT TENTH"(PDF). Archived fromthe original(PDF) on February 2, 2016. RetrievedJanuary 29, 2016.
  81. ^Plitt, Amy (April 4, 2016)."MTA May Be Reconsidering a 7 Line Station at Tenth Avenue".Curbed NY. RetrievedApril 4, 2016.
  82. ^Garber, Nick (June 7, 2021)."Hells Kitchen Candidate Wants To Revive Proposed 7 Train Station".Midtown-Hell's Kitchen, NY Patch. RetrievedJune 8, 2021.
  83. ^Duggan, Kevin (August 10, 2022)."Manhattan pols revive push for 10th Avenue station on No. 7 train in Hell's Kitchen".amNewYork. RetrievedOctober 6, 2023.
  84. ^Rahmanan, Anna (August 10, 2022)."Could Hell's Kitchen finally get a new subway station? Officials are pushing for it".Time Out New York. RetrievedOctober 6, 2023.
  85. ^Kaske, Michelle (October 4, 2023)."MTA Unveils a Plan to Fix NYC's Aging Transit System".Bloomberg.com. RetrievedOctober 6, 2023.
  86. ^Bagli, Charles V. (November 17, 2010)."Take the No. 7 to Secaucus?".The New York Times. RetrievedJuly 3, 2013.
  87. ^Bagli, Charles V. (November 16, 2010)."New York Studies Extending Subway Line to New Jersey".The New York Times.Archived from the original on November 18, 2010. RetrievedNovember 16, 2010.
  88. ^Bernstein, Andrea (November 16, 2010)."Mayor Bloomberg Explores Extending Subway to New Jersey".WNYC. Archived fromthe original on November 20, 2010.
  89. ^"NJ Commuters Like 7 Train Extension Plan".WCBS. November 17, 2010.
  90. ^"Tunnel to Nowhere Might Become 7 to Secaucus".WNBC. November 17, 2010.
  91. ^Roth, Jaime (November 17, 2010)."7 Subway Extension to NJ (Video)".WABC. Archived fromthe original on June 29, 2011. RetrievedNovember 18, 2010.
  92. ^Bernstein, Andrea (February 4, 2011)."City finally puts $ behind subway to New Jersey". Transportation Nation.Archived from the original on February 6, 2011. RetrievedFebruary 7, 2011.
  93. ^New York City Economic Development Commission (February 2, 2011)."No. 7 Line Extension to Secaucus Consultant Services"(PDF). www.scribd.com. RetrievedFebruary 7, 2011.
  94. ^"Gateway Project"(PDF). Amtrak. February 2011. p. 7. Archived fromthe original(PDF) on February 7, 2011. RetrievedFebruary 7, 2011.
  95. ^Higgs, Larry (December 4, 2011)."Tunnelvision Gateway project, No. 7 train extension latest to vie for trans-Hudson blessing".Asbury Park Press. RetrievedDecember 5, 2011.
  96. ^Haughney, Christine (April 3, 2012)."MTA Chief rules out subway line to New Jersey".The New York Times. RetrievedApril 4, 2012.
  97. ^abFrassinelli, Mike (April 10, 2013)."Plan to extend No. 7 subway from NYC to New Jersey could be back on track".The Star-Ledger. RetrievedApril 10, 2013.
  98. ^Rouse, Karen (April 10, 2013)."Report: Extending NY No. 7 subway line to Secaucus would accommodate commuter demand".The Record. Archived fromthe original on April 13, 2013. RetrievedApril 10, 2013.
  99. ^Parsons Brinckerhoff (April 2013).No 7 Secaucus Extension Feasibility Analysis Final Report(PDF) (Report). NYCEDC. p. III–X. Archived fromthe original(PDF) on November 5, 2013. RetrievedApril 10, 2013.
  100. ^"AN ASSEMBLY RESOLUTION supporting the extension of the New York City IRT Flushing Line into the State of New Jersey"(PDF).ASSEMBLY RESOLUTION No. 168 STATE OF NEW JERSEY 215th LEGISLATURE. New Jersey Legislature. May 13, 2013. Archived fromthe original(PDF) on September 19, 2020. RetrievedNovember 26, 2013.
  101. ^Brenzel, Kathryn (November 26, 2013)."Committee green lights expansion of NYC subway to Hoboken". NJ.com. RetrievedNovember 26, 2013.
  102. ^Higgs, Larry (April 21, 2017)."New York subway extension to N.J. may not be dead after all".NJ.com. RetrievedFebruary 28, 2018.
  103. ^Smith, Sandy (April 26, 2017)."On-Again, Off-Again New Jersey Bus Terminal May Be On Again". Next City. RetrievedMay 5, 2017.
  104. ^Barone, Vincent (February 27, 2018)."Cross-Hudson study options include 7 line extension into NJ".am New York. RetrievedFebruary 28, 2018.
  105. ^abcMcGeehan, Patrick (February 27, 2018)."A Subway Ride to New Jersey? It Could Happen, Officials Say".The New York Times.ISSN 0362-4331. RetrievedFebruary 28, 2018.
  106. ^Rivoli, Dan (February 13, 2018)."Transit study will look into running No. 7 train into New Jersey".NY Daily News. RetrievedFebruary 28, 2018.
  107. ^"Fourth Regional Plan - Regional Plan Association". Regional Plan Association. November 2017. RetrievedJanuary 22, 2022.
  108. ^"New York State Society of Professional Engineers Recognizes No. 7 Line Project".Tunnel Business Magazine. July 3, 2013. RetrievedAugust 20, 2013.
  109. ^"7 Line Extension".MTA.info. RetrievedNovember 10, 2013.

External links

[edit]
Template:Attached KML/7 Subway Extension
KML is from Wikidata
External videos
YouTube video clips about the 7 Subway Extension by Metropolitan Transportation Authority
video iconUpdate, January 12, 2010; 2:31
video iconUpdate, July 16, 2010; 3:12
video iconUpdate, May 4, 2011; 2:58
video iconUpdate, November 16, 2011; 2:26
video iconUpdate – Rails being delivered, May 10, 2012; 2:52
video iconUpdate, December 4, 2012; 3:07
video iconInaugural Ride, December 20, 2013; 9:30
video icon7 Line Extension Train Operator and Dispatcher Training, May 31, 2015; 3:39
video icon34 St-Hudson Yards Station, September 13, 2015; 4:51
A
Division
IRT
Manhattan/Queens
Bronx
Brooklyn
Bridges and tunnels
Former
B
Division
BMT
Manhattan/Queens
Eastern division
Southern division
Bridges and tunnels
Former
IND
Manhattan/Bronx
Brooklyn/Queens
Bridges and tunnels
Former
BMT/IND
Interdivision
connections
Purpose-built
Yards
Other
Note that this is a list of New York City Subway lines, which are the physical infrastructure over whichservices operate.
Lines with colors next to them aretrunk lines; trunk lines determine the color ofNew York City Subway service bullets, except forshuttles, which are dark gray.
Current
services
  • "1" train
  • "2" train
  • "3" train
  • "4" train
  • "5" train
  • "6" train
  • "7" train
  • "A" train
  • "B" train
  • "C" train
  • "D" train
  • "E" train
  • "F" train
  • "G" train
  • "J" train
  • "L" train
  • "M" train
  • "N" train
  • "Q" train
  • "R" train
  • "W" train
  • "Z" train
shuttle trainShuttles
Planned
"T" train
Defunct
services
1985–present
  • "9" train
  • "H" train
  • "K" train
  • "V" train
  • JFK Express
Pre-1985
Shuttles
BMT numbers
Unused labels
Stations (List)
By borough
By type
Divisions
Other lists
History
Early history
Expansions
Notable crashes
Strikes
Service
disruptions
Other major
incidents
Infrastructure
Arts and
culture
Miscellaneous
Other rapid
transit in NYC
Historical
Rail yard development
Adjacent developments
Nearby infrastructure
Other
Companies
Places
Public transit
Private transit
Major
construction
projects
Currently operating
Canceled
Proposed/Future
Traffic proposals
Operators
Public
Current
Defunct
Private
Organizations
Other

Retrieved from "https://en.wikipedia.org/w/index.php?title=7_Subway_Extension&oldid=1279972710"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp