Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

72nd Street station (Second Avenue Subway)

Coordinates:40°46′8″N73°57′30″W / 40.76889°N 73.95833°W /40.76889; -73.95833
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
New York City Subway station in Manhattan
For other uses, see72nd Street station.

New York City Subway station in Manhattan, New York
 72 Street
 "Q" train
Station statistics
Address72nd Street &Second Avenue
New York, New York
BoroughManhattan
LocaleUpper East Side,Lenox Hill
Coordinates40°46′8″N73°57′30″W / 40.76889°N 73.95833°W /40.76889; -73.95833
DivisionB (IND)[1]
LineIND Second Avenue Line
Services  N limited rush hour service only (limited rush hour service only)
  Q all times (all times)
  R one weekday a.m. rush hour trip in the northbound direction only (one weekday a.m. rush hour trip in the northbound direction only)
TransitBus transportNYCT Bus:M15,M15 SBS,M66,M72
StructureUnderground
Platforms1island platform
Tracks2
Other information
OpenedJanuary 1, 2017; 9 years ago (2017-01-01)[2][3]
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990ADA-accessible
Traffic
20246,995,154[4]Increase 8%
Rank28 out of 423[4]
Services
Preceding stationNew York City SubwayNew York City SubwayFollowing station
86th Street
N limited rush hour service onlyQ all timesR one weekday a.m. rush hour trip in the northbound direction only
Lexington Avenue–63rd Street
N limited rush hour service onlyQ all times
Location
72nd Street station (Second Avenue Subway) is located in New York City Subway
72nd Street station (Second Avenue Subway)
Show map of New York City Subway
72nd Street station (Second Avenue Subway) is located in New York City
72nd Street station (Second Avenue Subway)
Show map of New York City
72nd Street station (Second Avenue Subway) is located in New York
72nd Street station (Second Avenue Subway)
Show map of New York
Track layout

Future Phase 3
Street map

Map

Station service legend
SymbolDescription
Stops all timesStops all times
Stops rush hours only (limited service)Stops rush hours only (limited service)
Stops rush hours in the peak direction only (limited service)Stops rush hours in the peak direction only (limited service)
Stops weekends and weekday eveningsStops weekends and weekday evenings

The72nd Street station is astation on the first phase of theSecond Avenue Line of theNew York City Subway. Located at the intersection ofSecond Avenue and72nd Street, in theLenox Hill section of theUpper East Side inManhattan, it opened on January 1, 2017. The station is served by theQ train at all times, as well as limited rush-hourN trains and one northbound A.M. rush hourR train.

72nd Street has two tracks and oneisland platform; when planning for the line started in the early 2000s, the station was originally proposed with 3 tracks and 2 island platforms, but this was cut back due to the line's rising costs. This is the southernmost station on the first phase of the Second Avenue Line; south of this station, theBMT 63rd Street Line diverges to the west, towards theLexington Avenue–63rd Street station, andbellmouths exist for a future extension toSecond Avenue–Houston Street andHanover Square.

The station was not originally proposed as part of theProgram for Action in 1968, but a later revision to that plan entailed building a Second Avenue Subway with one of its stops located at 72nd Street. Construction on that project started in 1972, but stalled in 1975 due to lack of funding. In 2007, a separate measure authorized a first phase of the Second Avenue Line to be built between 65th and 105th Streets, with stations at 72nd, 86th, and 96th Streets. The station opened on January 1, 2017, with provisions to extend the line south toHouston Street in Phase 3. Since opening, the presence of the Second Avenue Subway's three Phase 1 stations has improved real estate prices along the corridor. The 72nd Street station was used by approximately 9.5 million passengers in 2019.[5]

The station, along with the other Phase 1 stations along the Second Avenue Subway, contains features not found in most New York City Subway stations. It is fully compliant with theAmericans with Disabilities Act of 1990, containing six elevators for disabled access. Additionally, the station containsair conditioning and is waterproofed, a feature only found in newer stations. The artwork at 72nd Street isPerfect Strangers, a set of portrait mosaics by artist and photographerVik Muniz.

History

[edit]

Background

[edit]
Early progress
Mezzanine
Escalator to mezzanine

The Second Avenue Line was originally proposed in 1919 as part of amassive expansion of what would become theIndependent Subway System (IND).[6][7]: 203  Work on the line never commenced, as theGreat Depression crushed the economy.[8] Numerousplans for the Second Avenue Subway appeared throughout the 20th century, but these were usually deferred due to lack of funds. In anticipation of the never-built new subway line, theSecond andThird Avenueelevated lines were demolished in 1942 and 1955, respectively.[9][10] The Second Avenue Elevated had one station at72nd Street and Second Avenue—right above the same intersection where the current subway station is located[11]—while the Third Avenue Elevated had two nearby stops on nearby Third Avenue at67th Street and76th Street.[12]

Unrealized proposals

[edit]

As part of theNew York City Transit Authority's 1968Program for Action, the construction of the full-lengthSecond Avenue Subway was proposed. It was to be built in two phases—the first phase from 126th to 34th Streets, the second phase from 34th to Whitehall Streets.[13][14] The line's planned stops in Manhattan, spaced farther apart than those on existing subway lines, proved controversial; the Second Avenue line was criticized as a "rich man's express, circumventing theLower East Side with its complexes of high-rise low- and middle-income housing and slums in favor of a silk stocking route."[7]: 218  People protested for almost a year over the lack of stations at 72nd Street, and a Lenox Hill (72nd Street[15]) station was added in October 1970.[7]: 220 

All Second Avenue Subway stations built under the Program for Action would have included escalators, high intensity lighting, improved audio systems, platform edge strips, and non-slip floors to accommodate the needs of the elderly and people with disabilities, but no elevators. Space at each station would have been used for ancillary facilities.[16] The stations were to be made with brick walls andpavers alongside stainless steel, and would have relatively small dimensions, with 10-foot (3.0 m) mezzanine ceilings.Carson, Lundin & Thorson received a contract for the design of the 72nd Street station.[17]: 110 

A combination of Federal and State funding was obtained, and despite the controversy over the number of stops and route, a groundbreaking ceremony was held on October 27, 1972, at Second Avenue and 103rd Street.[15][18][19] Although work on the 72nd Street station never commenced, three short segments of tunnel inEast Harlem andChinatown were built.[20][21]: 9D-24  However, the city soon experienced its most direfiscal crisis yet, due to the stagnant economy of the early 1970s, combined with themassive outflow of city residents to the suburbs, and in September 1975, construction on the line stopped, and the tunnels were sealed.[19][22]

In 1999, theRegional Plan Association considereda full-length Second Avenue Subway, which included 72nd Street as one of its planned 31 stations.[23] The entrances to 72nd Street station were to be located at 70th, 72nd, and 74th Streets.[23] The finalenvironmental impact statement was released for the station in April 2004.[24] The initial design of the 72nd Street station lasted about eight years, between 1999 and 2007.[25]

Construction

[edit]

In March 2007, plans for theconstruction of the Second Avenue Subway were revived.[26][27][28] The line's first phase, the "first major expansion" to the New York City Subway in more than a half-century,[29] included three stations in total (at 72nd, 86th, and 96th Streets), which collectively cost $4.45 to $4.5 billion.[30][31] Its construction site was designated as being from 105th Street and Second Avenue to 63rd Street and Third Avenue.[32] The MTA awarded a $337 million contract—one that included constructing the tunnels between 92nd and 63rd Streets, building a launch box for thetunnel boring machine (TBM) at 92nd to 95th Streets, and erecting access shafts at 69th and 72nd Streets—to Schiavone Construction,Skanska USA Civil, and J.F. Shea Construction.[33]

Original proposed layout
Extension southward

Due to cost increases for construction materials anddiesel fuel affecting the prices of contracts not yet signed, the MTA announced in June 2008 that certain features of the Second Avenue Subway would be simplified to save money. One set of changes, which significantly reduced the footprint of the subway in the vicinity of 72nd Street, was the alteration of the 72nd Street station from a three-track, two-platform design to a two-track, single island platform design, paired with a simplification of the connection to the Broadway Line spur.[34][35] Supplemental environmental impact studies covering the changes for the 72nd Street station was completed in June 2009.[36][37][38]

In May 2010, atunnel boring machine beginning at 92nd Street started to dig down Second Avenue through the 72nd Street area, to 63rd Street and Lexington Avenue.[39][40]

On October 1, 2010, MTA awarded a $431 million contract to SSK Constructors (a joint venture) for the mining of the tunnels connecting the 72nd Street station to the existing63rd Street station, and for the excavation and heavy civil structures of the 72nd Street Station.[41] Construction was to be done through two shafts at 69th and 72nd Streets, the locations of the future entrances; shaft sinking work was started in late 2010. Projected completion of the contract was estimated at November 2013.[25] The rock around the area is mostlyManhattan schist, and was generally considered to be a stable location for blasting,[25] so blasting for the station commenced on January 18, 2011.[42]

On August 8, 2012, a controlled blast at 72nd Street caused rocks to fly over the station site.[43] Nearly two weeks later, on August 21, 2012, an uncontrolled blast for the Second Avenue Subway station at 72nd Street was done incorrectly,[44] causing a large explosion that sent debris into the air and broke windows of buildings in the area and damaged nearby sidewalks.[43][45][46][47]

Arch form work

Cavern drilling was finished in August 2012;[48] however, blasting for the station entrances was not completed until February 28, 2013.[49][50] Demolition of a muck house, erected in August 2011[51] to remove mud from the tunnels, was finished by October 2013.[52] By January 2013, almost 96.3% of excavation was completed, with 177,873 cubic yards (135,994 m3) of dirt excavated from the station; waterproofing was also being done in the station and the tunnels south of it.[53][54] The contract for the station's finishing touches, including the electrical, plumbing, track, and signal systems, as well as entrances and exits, was awarded to Judlau Contracting at a price of $258 million in February 2013.[55] As of May 12, 2014[update], the mezzanine level of the station was completed and being used to store equipment.[56] In September, the station's size was gauged byGothamist to be so large that "55,000 elephants could fit" within the enormous cavern.[57]

The station's ancillaries at 72nd and 69th Street were planned to be completed in winter 2014–2015,[58] but by October 2016, the finishing touches on the ancillaries were still being applied.[59] The station's mezzanine, plumbing, electricity and machinery were originally scheduled to be finished in fall 2015,[58][60] but the estimated completion date was pushed back to September 2016[61][62] and then later to simply the "fall of 2016".[59]

As of April 2015[update], the station was 56% complete,[63] and as of October 2016[update], the station was 92% complete.[59] However, in July 2016, it was reported that the station's opening could be delayed because the station's elevator had not been delivered and because the communication systems at the station had yet to be finished.[64] The elevators and communication systems still needed to be finished by October 2016, and it was possible that the station's opening could be delayed. With the station being delayed, the possibility of opening the other two stations of the line in December but skipping this station was being considered.[65] On December 14, though, the MTA announced that all of the line's stations would open at the same time.[66] Still, systems testing at this station had not been completed by December 19.[2] The station opened on January 1, 2017.[2][3]

Phase Three

[edit]
Future junction between Phase 1, future Phase 3, and the 63rd Street Connector

Once construction on Phase 2 of the Second Avenue Subway, which will run from 105th Street to theHarlem–125th Street station at Lexington Avenue, is completed, construction is expected to start on Phase 3, which would extend the Second Avenue Subway south down Second Avenue to Houston Street. The tracks would diverge from the tracks that continue to the BMT 63rd Street Line running south on Second Avenue. There is currently a large provisional cavern, orbellmouth, for this line.[67] However, no funding has been committed to this phase.[68] After Phase 3, a newT service[69] will operate from Harlem–125th Street to Houston Street.[70]

An additional two-track connection, tracks ST-1 and ST-2, is planned between the line toward Lower Manhattan (around 63rd Street) and theIND 63rd Street Line toward Queens using existing bellmouths that are at 63rd Street and First Avenue.[71] Current plans do not call for it to be used by regular service, but instead to be used for non-revenue moves, and to provide a connection to theJamaica Yard maintenance depot.[72][73] The connection would allow for trains to run from the Financial District to Queens if the capacity of the IND Queens Boulevard Line was increased, or if theQueens Super-Express Bypass was built.[74]

Station layout

[edit]
GroundStreet levelExits/entrances
Basement 1Upper landingSouth entrance escalator landing
Basement 2MezzanineFare control, station agent,OMNY machines
Disabled access Elevator bank inside building at southeast corner of Second Avenue and 72nd Street
Basement 3
Platform level
Southbound"Q" train towardConey Island–Stillwell Avenue viaBrighton(Lexington Avenue–63rd Street)
"N" train toward Coney Island–Stillwell Avenue viaSea Beach (select rush hour trips)(Lexington Avenue–63rd Street)
Island platformDisabled access
Northbound"Q" train toward96th Street (86th Street)
"N" train toward 96th Street (select rush hour trips)(86th Street)
"R" train toward 96th Street (one AM rush hour trip)(86th Street)
Platform during rush hour

The 72nd Street station is served byQ trains at all times, someN trains during rush hours, and one northboundR train during the AM rush hours.[75] The station is between86th Street to the north andLexington Avenue–63rd Street to the south.[76] It has two tracks and anisland platform.[26] The station is built so that it is more wide open than most other underground subway stations in the system, like other Second Avenue Subway stations but unlike existing New York City Subway stations.[77][25] Due to its openness, the station was likened to aWashington Metro station by Michael Horodniceanu, President ofMTA Capital Construction.[78] Thedeep-level platform is approximately 99 feet (30 m) below ground, making it the deepest of the three stations built under phase 1.[79] The platform for the 72nd Street station, like the otherSecond Avenue Subway stations, is 27.8 feet (8.5 m) wide.[80] As with other stations on the first phase of the Second Avenue Subway, it was designed and engineered by ajoint venture ofArup andAECOM.[81]

The station has air-cooling systems to make it at least 10 °F (6 °C) cooler than other subway stations during the summer.[82] This requires the station to have large ventilation and ancillary buildings, rather than traditional subway grates.[83] The station is also compliant with current fire codes, whereas most existing stations are not.[84] Additionally, the station is waterproofed with concrete liners and fully drained.[25] In early plans, the Second Avenue Subway was supposed to haveplatform screen doors to assist with air-cooling, energy savings, ventilation, and track safety,[85] but this plan was scrapped in 2012 as cost-prohibitive.[86] According to an internal study prepared for the MTA in 2020, the 72nd Street station could theoretically accommodate half-height platform edge doors. Full-height platform screen doors would be possible but would necessitate the installation of structural bracing and relocation of several mechanical systems.[87]

Track layout

[edit]

Diamond crossovers are located in the cavern both north and south of the station, with aflying junction to theBMT 63rd Street Line via tracks G3 and G4 just south of the southern crossover.[25][88][71][89] The station cavern, which includes both crossovers, is 1,300 feet (400 m) long.[25] South of this station there are provisions for the Second Avenue Subway to continue further south via Second Avenue.[89] The tracks would pass over track G4, which connects the BMT 63rd Street Line to the uptown Second Avenue Subway track, track S2.[71]

The 72nd Street station was conceived as a three-track station with twoisland platforms,[90] but prior to construction was reduced to a two-track, one-island platform station, due to the high cost of building a three-track, two-platform station.[91][88] Additionally, the station's width was shaved back from 100 feet (30 m) to 70 feet (21 m).[91] Although this served to reduce costs, it also removed a lot of operational flexibility from the 72nd Street station, since trains cannot beturned back at the station without severely disrupting service.[92]

Artwork

[edit]

The station artwork,Perfect Strangers, consists of portraits by artist and photographerVik Muniz.[93][94][95] In February 2014, Muniz was chosen in aMTA Arts & Design competition with more than 100 entrants.[96]

Muniz's artwork comprises 36 mosaic-cast portraits of real people who look like they are waiting for a train. These portraits, based on photographs of his acquaintances, are scattered along the exits and mezzanine. The portraits include those of chefDaniel Boulud and designerWaris Ahluwalia. Muniz also has a portrait of himself, running after a wayward suitcase while papers fly away behind him.[97][95] A marriedsame-sex couple is also depicted, marking the first permanent, non-politicalLGBT art in New York City.[98][99] The depiction is based on a photograph of a same-sex couple.[98] The Jewish magazineForward claimed that the work wasantisemitic because one of the figures was a Jewish man holding a globe and luggage.[100]

Exits and ancillary buildings

[edit]
Crowds at Entrance 2 on opening day

The current station layout includes 3 numbered entrances/exits,[25] containing 11 escalators in addition to 5 elevators.[101][58] There are also two ancillary buildings that contain station equipment.[102] One building at the northwest corner of Second Avenue and 72nd Street contains both ancillary equipment and a station entrance.[103]

The entrances and exits are located at:[25][104]

Location[104]Exit TypeNumber of exits
Entrance 1
NE corner of Second Avenue and 69th Street[105]
Staircase
Escalator
1 staircase
1 escalator
Entrance 1
SE corner of Second Avenue and 70th Street[105]
Staircase
Escalator
1 staircase
1 escalator
Entrance 2 (at Ancillary 2)
Building, NW corner of Second Avenue and 72nd Street[105]
Escalator3 escalators
Entrance 3
SE corner of Second Avenue and 72nd Street[105]
ElevatorDisabled access1 bank of 5 elevators
70th Street exit at night
The entrance and ventilation building at 72nd Street

The two ancillary buildings are located at:

  • Ancillary 1: Northwest corner of 69th Street and Second Avenue[106]
  • Ancillary 2: Northwest corner of 72nd Street and Second Avenue[106]

In 2007, some area residents filed a lawsuit in opposition to a proposed entrance at 72nd Street between First and Second Avenues, in front of residential buildings at 320 and 340 East 72nd Street, citing that the entrance would take up space on the sidewalk. Due to vocal community opposition, the MTA non-publicly revised plans for the subway entrance in fall 2007, relocating the planned entrance to the southeast corner of Second Avenue and 72nd Street[107]

Two years later, in 2009, aFinding Of No Significant Impact by theFederal Transit Administration found that a proposed entrance at the northeast corner of Second Avenue and 72nd Street was unfeasible, as was the proposed single sidewalk elevator at the southeast corner.[108]: 1–2  The northeast-corner entrance, within the 305 East 72nd Street apartment building, would have encroached into a portion ofCVS Pharmacy's ground-floor retail space as well as the apartment building's basement, which contained its laundry room and several of its utility intake pipes. Building the northeast-corner entrance would have forced the owners of 305 East 72nd Street to move their laundry room and utilities into the retail space occupied by CVS, so plans for the northeast-corner entrance were canceled.[108]: 3  The site for the sidewalk elevator on the southeast corner turned out to be located close to a high-pressuresteam main that was 48 inches (120 cm) in diameter. After a2007 steam main explosion inMidtown, utility providerConsolidated Edison changed its guidelines for clearance around high-pressure mains, which meant that the elevator was now too close to the main. Thus, the plan was revised to place the elevator inside a building.[108]: 3–4  Of the three alternatives presented for combining the two entrances, the MTA chose an alternative in which there would be five elevators inside a building at the southeast corner of Second Avenue and 72nd Street. This required the demolition of 300 East 72nd Street so that a new building for the five elevators could be built.[108]: 1–2, 5 

In 2013, the MTA filed to change the location of Entrance 1, moving it onto from the sidewalk, away from its original proposed location inside 301 East 69th Street. This was because designs for entrances inside the building failed to both satisfy the building's residents as well as meet the MTA's engineering requirements. With theNew York City Department of Transportation planning a bike lane along the east side of Second Avenue after construction is finished, the MTA could widen the sidewalk to make room for the entrances without ultimately disrupting traffic flow.[109][110]

Effects

[edit]
70th Street entrance under construction

Business declined during the construction and blasting of the station, with many storefronts losing business and some even being forced to close.[51][111][112][113] However, starting in 2013, construction of the station has caused the value of real estate in the area to start to rise.[51][114] Although the surrounding area's real estate prices had been declining since the 1990s, there had been increases in the purchases and leases of residential units around the area, causing real estate prices to rise again.[115] On theUpper East Side, prices of real estate west of Third Avenue had historically been higher than prices east of there, but due to the subway's construction, prices of real estate east of the avenue had risen dramatically since the station's construction started.[116] With the opening of the new station, business owners hoped to see an increase in patronage.[117][118]

References

[edit]
  1. ^"Glossary".Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS)(PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived fromthe original(PDF) on February 26, 2021. RetrievedJanuary 1, 2021.
  2. ^abcMcCowan, Candace (December 31, 2016)."Decades in the making, Second Avenue Subway set to open to the public".ABC7 New York. RetrievedJanuary 1, 2017.
  3. ^abFitzsimmons, Emma G.; Wolfe, Jonathan (January 1, 2017)."Second Avenue Subway Opening: What to Know".The New York Times. RetrievedJanuary 1, 2017.
  4. ^ab"Annual Subway Ridership (2018–2023)".Metropolitan Transportation Authority. 2023. RetrievedApril 20, 2024.
  5. ^"Annual Subway Ridership (2018–2023)".Metropolitan Transportation Authority. 2023. RetrievedApril 20, 2024.
  6. ^"www.nycsubway.org: Second Avenue Subway: The Line That Almost Never Was". nycsubway.org. 1972. RetrievedSeptember 30, 2015.
  7. ^abcRaskin, Joseph B. (2013).The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. New York, New York: Fordham University Press.doi:10.5422/fordham/9780823253692.001.0001.ISBN 978-0-82325-369-2.
  8. ^"IND Second System 1929 Plan". nycsubway.org. RetrievedMarch 25, 2016.
  9. ^"Second Avenue Subway Project – History". October 19, 2002. Archived fromthe original on October 19, 2002. RetrievedFebruary 15, 2016.
  10. ^"Last Train Rumbles On Third Ave. 'El'; An Era Ends With Final Run of Third Avenue "El" LAST TRAIN ROLLS ON THIRD AVE. 'EL'"(PDF).The New York Times. RetrievedAugust 23, 2016.
  11. ^See:
  12. ^See:
  13. ^"The New York Transit Authority in the 1970s". nycsubway.org.
  14. ^"DRAFT ENVIRONMENTAL STATEMENT, SECOND AVENUE SUBWAY, ROUTE 132-A".Urban Mass Transportation Administration. nycsubway.org. August 1971. RetrievedMay 22, 2014.
  15. ^ab"Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Appendix B Development of Alternatives"(PDF).mta.info. Metropolitan Transportation Authority. May 2004. RetrievedAugust 7, 2016.
  16. ^"Notice of Public Hearing Southern Extension of the Second Avenue Line for the New York City Transit System".New York Daily News. February 16, 1973. RetrievedDecember 8, 2018.
  17. ^Stern, Robert A. M.; Mellins, Thomas; Fishman, David (1995).New York 1960: Architecture and Urbanism Between the Second World War and the Bicentennial. New York: Monacelli Press.ISBN 1-885254-02-4.OCLC 32159240.OL 1130718M.
  18. ^"Second Avenue Subway: Timeline". nycsubway.org. Retrieved April 7, 2014.
  19. ^ab"Second Avenue Subway - History".mta.info. Metropolitan Transportation Authority. Archived fromthe original on April 8, 2014. RetrievedApril 7, 2014.
  20. ^Jewler, Sam (July 24, 2004)."The Long, Tortured History of the Second Avenue Subway".The New Yorker. RetrievedAugust 14, 2015.
  21. ^Manhattan East Side Transit Alternatives Study (MESA): Environmental Impact Statement. 1999.
  22. ^Burks, Edward C. (September 26, 1975)."Work is Stopped on Subway Line; City Lacks Funds to Finish Part of 2d Ave. Project".The New York Times. p. 41.Archived from the original on July 27, 2018. RetrievedOctober 4, 2015.
  23. ^abMetrolinkArchived August 2, 2010, at theWayback Machine, p.20
  24. ^"Finding of No Significant Impact"(PDF).MTA.info.Metropolitan Transportation Authority. September 29, 2010.
  25. ^abcdefghi"NEW YORK CITY—Second Avenue Subway: MTA's Second Avenue Station and Tunnels Project"(PDF). Society for Mining, Metallurgy and Exploration.
  26. ^ab"Tunneling Begins Under Second Avenue". Metropolitan Transportation Authority. May 14, 2010. Archived fromthe original on June 6, 2011. RetrievedJune 28, 2011.
  27. ^Neuman, William (April 9, 2007)."Is That Finally the Sound of a 2nd Ave. Subway?".The New York Times. RetrievedJune 28, 2011.
  28. ^"Excavation of West Tunnel for Second Avenue Subway Complete". Metropolitan Transportation Authority. February 4, 2011. Archived fromthe original on October 27, 2016. RetrievedOctober 26, 2016.
  29. ^"The Second Avenue subway explained".am New York. RetrievedOctober 27, 2016.
  30. ^*Putzier, Konrad (May 14, 2014)."Real Estate Weekly » Blog Archive » Light at end of tunnel for Second Ave. subway". Rew-online.com. Archived fromthe original on September 7, 2017. RetrievedJune 5, 2014.
  31. ^"Drone takes tour of NYC's 2nd Avenue subway line".CBS News. September 16, 2015. RetrievedOctober 27, 2016.
  32. ^Nonko, Emily (January 30, 2014)."Updates on NYC's Biggest Subway Projects: Second Avenue and East Side Access". NewYork.com. Archived fromthe original on May 17, 2014. RetrievedJune 5, 2014.
  33. ^"Top Projects"(PDF). NY Construction. February 8, 2017. p. 1.
  34. ^"Rising costs shelve third Second Ave. Subway track at 72nd :: Second Ave. Sagas". Secondavenuesagas.com. June 25, 2008. RetrievedMay 14, 2014.
  35. ^"Community Board 8 Second Avenue Subway Task Force"(PDF).MTA.info.Metropolitan Transportation Authority. August 17, 2006. Archived fromthe original(PDF) on April 8, 2014., June 17, 2008
  36. ^"Microsoft PowerPoint – 0080617_CB8_Final [Compatibility Mode]"(PDF). RetrievedAugust 2, 2009.
  37. ^"Microsoft PowerPoint – 080729_CB8_Final_distribution version"(PDF). RetrievedAugust 2, 2009.
  38. ^"MTA Capital Construction – Second Avenue Subway: Documents". Metropolitan Transportation Authority. Archived fromthe original on June 25, 2013. RetrievedOctober 5, 2013.
  39. ^"MTA Launches Second Avenue Subway Tunnel Boring Machine".MTA Press Releases. May 14, 2010. Archived fromthe original on October 6, 2013. RetrievedOctober 5, 2013.
  40. ^Exclusive: Ground Breaking For 2nd Avenue Subway Line Weeks AwayArchived October 11, 2007, at theWayback Machine – NY1, January 24, 2007
  41. ^"MTA Capital Construction – Procurement".mta.info.
  42. ^"Blasting for Second Avenue Subway 72nd Street Station Completed".MTA Press Release. March 4, 2013. Archived fromthe original on April 12, 2015. RetrievedJune 12, 2014.
  43. ^ab"EXCLUSIVE: Second Avenue subway plagued with dangerous conditions and safety violations". New York: NY Daily News. June 2, 2013. RetrievedMay 14, 2014.
  44. ^"Summary Report of August 21, 2012 Incident at Ancillary No. 2"(PDF).MTA.info.Metropolitan Transportation Authority.
  45. ^"Blasting Goes Awry Along 2nd Avenue Subway « CBS New York". Newyork.cbslocal.com. August 21, 2012. RetrievedMay 14, 2014.
  46. ^AP/The Huffington Post (August 21, 2012)."Second Avenue Subway Explosion Breaks UES Windows After Workers Use Too Many Explosives (PHOTOS)". Huffington Post. RetrievedMay 14, 2014.
  47. ^Kathy Carvajal; Arun Kristian Das; Luke Funk."Second Ave. subway construction blast investigation – New York News". Myfoxny.com. Archived fromthe original on May 14, 2014. RetrievedMay 14, 2014.
  48. ^"Newsletter August/September 2012"(PDF).MTA.info.Metropolitan Transportation Authority. October 2012.
  49. ^"MTA: Second Avenue Subway Blasting Completed « CBS New York". Newyork.cbslocal.com. March 4, 2013. RetrievedMay 14, 2014.
  50. ^"MTA | Press Release | MTA Headquarters | Blasting for Second Avenue Subway 72nd Street Station Completed". New.mta.info. Archived fromthe original on April 12, 2015. RetrievedMay 14, 2014.
  51. ^abc"Shops along Second Ave. subway line construction sites want big bucks in 2014". New York: NY Daily News. January 7, 2014. Archived fromthe original on March 16, 2014. RetrievedMay 5, 2014.
  52. ^"72nd Street Station Area Update October 2013"(PDF).MTA.info.Metropolitan Transportation Authority. October 2013.
  53. ^Garth Johnston (January 29, 2013)."Photos: The Second Avenue Subway Approaches Reality Station". Gothamist. Archived fromthe original on September 28, 2013. RetrievedMay 14, 2014.
  54. ^"Second Avenue Subway Construction: MTA Shows Off January 2013 Progress (PHOTOS)". Huffington Post. January 29, 2013. RetrievedMay 14, 2014.
  55. ^"MTA Awards $258M Contract for Second Avenue Subway Station at E. 72nd St. – Upper East Side – DNAinfo.com New York". Dnainfo.com. February 15, 2013. Archived fromthe original on May 15, 2014. RetrievedMay 14, 2014.
  56. ^"A Subterranean Expedition Shows Progress in NYC's Second Avenue Subway Tunnels". Untapped Cities. April 28, 2014. RetrievedMay 14, 2014.
  57. ^Gothamist (September 25, 2013)."Photos: The 2nd Avenue Subway's Progress (And Rails!)". Gothamist. Archived fromthe original on April 24, 2014. RetrievedMay 14, 2014.
  58. ^abc"72nd Street Station Area Update"(PDF).MTA.info.Metropolitan Transportation Authority. April 2014.
  59. ^abc"September 2016 Newsletter"(PDF).MTA.info.Metropolitan Transportation Authority. September 2016.
  60. ^"May 2014 Newsletter"(PDF).MTA.info.Metropolitan Transportation Authority. May 2014.
  61. ^"April 2015 Newsletter"(PDF).MTA.info.Metropolitan Transportation Authority. April 2015.
  62. ^"Report from Transit & Bus Committee"(PDF).MTA.info.Metropolitan Transportation Authority. March 2015. p. 149.
  63. ^"New Photos Show Second Avenue Subway Stations Nearing Completion".Gothamist. April 27, 2015. Archived fromthe original on May 1, 2015. RetrievedMay 2, 2015.
  64. ^"'Disappointing Delay' in June Puts 2nd Ave. Subway Behind: MTA Consultant".DNAinfo New York. Archived fromthe original on August 21, 2016. RetrievedJuly 26, 2016.
  65. ^Fitzsimmons, Emma G. (October 24, 2016)."After Almost a Century, the 2nd Avenue Subway Is Oh-So-Close to Arriving".The New York Times.ISSN 0362-4331. RetrievedOctober 27, 2016.
  66. ^Rivoli, Dan (December 14, 2016)."Second Avenue subway line set to open on New Year's Eve".NY Daily News. RetrievedDecember 15, 2016.
  67. ^Anastasio, Joseph."It contains a provision for the full length Second Ave. Subway".ltvsquad.com. RetrievedDecember 30, 2016.
  68. ^Donohue, Pete (January 20, 2013)."Second Ave. subway on track to open in 2016: MTA".Daily News. New York. RetrievedMarch 25, 2013.
  69. ^Hirschman, David (August 2008)."The T Train: NYC Will Get Its First New Subway Line in 70 Years".Wired. No. Aug '08. p. 36. Archived fromthe original on July 25, 2008. RetrievedApril 8, 2014.The old (1960s) T service was also called theWest End train. The reference was to Brooklyn. By contrast, the newT service will serve the East Side of Manhattan, and 'will unite the Upper and Lower East Sides.'
  70. ^"Making the Case"(PDF). Federal Transit Administration. August 20, 2004. Archived fromthe original(PDF) on February 27, 2013. RetrievedApril 10, 2014.
  71. ^abcMarrero, Robert (January 1, 2017)."472 Stations, 850 Miles"(PDF).B24 Blog, viaDropbox. RetrievedApril 27, 2018.
  72. ^"Final Summary Report"(PDF). Metropolitan Transportation Authority. October 11, 2001. RetrievedApril 10, 2014.
  73. ^"Making the Case"(PDF). Federal Transit Administration. August 20, 2004. Archived fromthe original(PDF) on February 27, 2013. RetrievedApril 10, 2014.
  74. ^"Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Appendix B Development of Alternatives"(PDF).mta.info. Metropolitan Transportation Authority. May 2004. RetrievedAugust 7, 2016.
  75. ^"SUB-DIVISION B TRAIN OPERATOR/CONDUCTOR ROAD & NON-ROAD WORK PROGRAMS IN EFFECT: NOVEMBER 6, 2016"(PDF).progressiveaction.info. New York City Transit. July 29, 2016. RetrievedAugust 19, 2016.
  76. ^"Subway Map"(PDF).Metropolitan Transportation Authority. April 2025. RetrievedApril 2, 2025.
  77. ^Hession, Michael (May 2, 2014)."A Subterranean Stroll Through NYC's Newest Train Tunnel".Gizmodo. RetrievedMay 13, 2014.
  78. ^Rivoli, Dan (May 1, 2014)."Second Avenue Subway progress: Dec. 2016 end date on track".AM New York. RetrievedMay 14, 2014.
  79. ^Metropolitan Transportation Authority."Second Avenue Subway March 2014 Public Workshop Follow-Up Report, page 23"(PDF). RetrievedApril 21, 2016.
  80. ^"A Tour of NYC's Newest Subway Station With Its Architect".Curbed NY. September 21, 2015. RetrievedSeptember 24, 2015.
  81. ^Thorpe, Harriet (January 19, 2017)."AECOM-Arup completes the first phase of New York's Second Avenue Subway expansion".Wallpaper*. RetrievedJuly 31, 2024.
  82. ^Donohue, Pete (August 4, 2006)."Cooler Subways Coming Eventually".New York Daily News.Archived from the original on October 10, 2007. RetrievedDecember 12, 2008.
  83. ^Roberts, Sam (September 30, 2013)."No Heel Hazards (or Gusts) as Subway Expands".New York Times. New York. RetrievedMay 5, 2014.
  84. ^Nolan, Caitlin (May 16, 2014)."Second Avenue subway line construction is progressing: officials".NY Daily News. RetrievedMay 19, 2014.
  85. ^Neuman, William (April 5, 2007)."2nd Ave. Subway Platforms May Get Glass Walls and Sliding Doors".The New York Times.ISSN 0362-4331. RetrievedJanuary 12, 2017.
  86. ^Rubinstein, Dana (December 7, 2012)."No Seoul-style platform doors for New York subways, even in new stations".Politico.
  87. ^Stv Inc. (February 2020)."New York City Transit System-wide Platform Screen Door Feasibility Study Summary of Conclusions".Metropolitan Transportation Authority. p. 3392. RetrievedJanuary 28, 2022.
  88. ^ab"Community Board 8 Second Avenue Subway Task Force"(PDF).MTA.info.Metropolitan Transportation Authority. August 17, 2006. Archived fromthe original(PDF) on April 8, 2014.
  89. ^ab2nd Avenue Subway (October 27, 2016).Second Avenue Subway Test Train.Archived from the original on November 14, 2021. RetrievedOctober 28, 2016 – viaYouTube.{{cite AV media}}: CS1 maint: numeric names: authors list (link)
  90. ^"Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Figure 2-4 Track Diagram, North of 55th Street"(PDF).mta.info. Metropolitan Transportation Authority. May 2004. RetrievedAugust 7, 2016.
  91. ^ab"Rising costs shelve third Second Ave. Subway track at 72nd :: Second Ave. Sagas". Secondavenuesagas.com. June 25, 2008. RetrievedMay 14, 2014.
  92. ^Ebiri, Bilge (February 7, 2018)."Thanks to an MTA Design Decision, the Second Avenue Subway Is Already Screwed".Village Voice. Archived fromthe original on February 7, 2018. RetrievedFebruary 10, 2018.
  93. ^Ben Yakas (January 22, 2014)."Here's What The Second Avenue Subway Will Look Like When It's Filled With Art". Gothamist. Archived fromthe original on March 30, 2014. RetrievedMay 5, 2014.
  94. ^"Mosaic Artist Picked for Second Avenue Subway's 72nd Street Station". DNA Info. February 5, 2014. Archived fromthe original on May 15, 2014. RetrievedMay 14, 2014.
  95. ^ab"MTA - Arts & Design | NYCT Permanent Art".web.mta.info. RetrievedJuly 20, 2022.
  96. ^"Mosaic Artist Picked for Second Avenue Subway's 72nd Street Station – Upper East Side – DNAinfo.com New York". Dnainfo.com. February 5, 2014. Archived fromthe original on May 15, 2014. RetrievedMay 14, 2014.
  97. ^Kennedy, Randy (December 19, 2016)."Art Underground: A First Look at the Second Avenue Subway".The New York Times.ISSN 0362-4331. RetrievedDecember 19, 2016.
  98. ^abRaymond, Adam K. (December 27, 2016)."Second Avenue Subway Station Features Portrait of Gay Couple Holding Hands".New York Magazine. RetrievedDecember 27, 2016.
  99. ^"New subway station has public art rarely seen: A gay couple".NBC News. December 27, 2016. RetrievedNovember 3, 2023.
  100. ^Romm, Jake (December 23, 2016)."Is the Second Avenue Subway Saying Something About Us in This Mural?".The Forward. RetrievedJuly 28, 2019.
  101. ^John Del Signore (May 16, 2013)."Photos: Deep Inside The Second Avenue Subway's 72nd Street Station". Gothamist. Archived fromthe original on October 22, 2014. RetrievedMay 14, 2014.
  102. ^"August 2015 Newsletter"(PDF).MTA.info.Metropolitan Transportation Authority. August 2015.
  103. ^"July 2015 Task Force Presentation"(PDF).MTA.info.Metropolitan Transportation Authority. July 14, 2015. p. 14.
  104. ^ab"MTA Neighborhood Maps: Upper East Side"(PDF).mta.info.Metropolitan Transportation Authority. 2016. RetrievedDecember 30, 2016.
  105. ^abcd"Introducing the Second Avenue Subway Make Second Avenue Q subway service, your first choice".mta.info. Metropolitan Transportation Authority. December 30, 2016. RetrievedDecember 30, 2016.
  106. ^ab"Newsletter February 2012"(PDF).MTA.info.Metropolitan Transportation Authority. February 2012.
  107. ^Morris, Bill (December 2009)."You Can Fight City Hall (actually, the MTA) and Win".habitatmag.com. Habitat Magazine. RetrievedDecember 19, 2016.
  108. ^abcd"Finding Of No Significant Impact (FONSI): Second Avenue Subway: 72nd Street and 86th Street Station Entrances"(PDF).mta.info.United States Department of Transportation. October 29, 2009. RetrievedDecember 19, 2016.
  109. ^"July 2013 Technical Memo"(PDF).transit.dot.gov.Federal Transit Administration. July 2013. p. 4.
  110. ^"July 2013 Newsletter"(PDF).MTA.info.Metropolitan Transportation Authority. July 2013.
  111. ^Schlossberg, Tatiana (October 2, 2014)."Promise of New Subways Has West Siders Excited and East Siders Skeptical".The New York Times. RetrievedOctober 26, 2014.
  112. ^"Second Avenue subway will have a stop at 72nd St. in Upper East Side – am New York". Amny.com. May 14, 2014. RetrievedMay 14, 2014.
  113. ^Berger, Joseph (October 5, 2010)."Subway Work on 2nd Avenue Hobbles Stores".The New York Times. RetrievedMay 14, 2014.
  114. ^"Landlords dig Second Ave. subway | Crain's New York Business". Crainsnewyork.com. February 24, 2014. RetrievedMay 14, 2014.
  115. ^Hughes, C.J. (April 8, 2016)."Yorkville Bets on the Second Avenue Subway".The New York Times. RetrievedApril 13, 2016.
  116. ^Acitelli, Tom (March 1, 2014)."Upper East Side sees boost from Second Avenue subway progress".The Real Deal. RetrievedMay 13, 2014.
  117. ^"Businesses hope for boost with 2nd Avenue subway launch".ABC7 New York. December 20, 2016. RetrievedDecember 23, 2016.
  118. ^Barone, Vincent (December 20, 2016)."UES community, officials excited for 2nd Ave. subway".am New York. RetrievedDecember 23, 2016.

Further reading

[edit]
  • Nasri, V., Fulcher, B., Redmond, R., and Parikh, A. 2012, Design and Construction of 72nd Street Large and Shallow Rock Cavern Station in New York City.Proceedings of the North American Tunneling Conference 2012, Indianapolis, Indiana, June 20–23, 2012.
  • Nasri, V., Fulcher, B., and Redmond, R. 2012, Design and Construction of 72nd Street Station Rock Cavern in New York.Proceedings of the World Tunnel Congress 2012, Bangkok, Thailand, May 18–23, 2012, International Tunneling Association.

External links

[edit]
Wikimedia Commons has media related to72nd Street (IND Second Avenue Line).
"q" trainSecond Avenue/
 Broadway Express/
 Brighton Local
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Note: Service variations, station closures, and reroutes are not reflected here.
    Stations with asterisks have no regular peak, reverse peak, or midday service on that route. See linked articles for more information.
Second Ave. Line
"N" train"Q" train"R" train
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Stations and line segments initalics are closed, demolished, or planned (temporary closures are marked with asterisks). Track connections to other lines' terminals are displayed in brackets.Struck through passenger track connections are closed or unused in regular service.
Buildings
59th–72nd Sts
72nd–86th Sts
86th–96th Sts
Former
Culture
Shops, restaurants
Museums
Theaters/performing arts
Galleries
Hotels
Social clubs
Former
Green spaces/recreation
Education
Libraries
Primary and secondary
Post-secondary
Other institutions
Religion
Churches, chapels
Synagogues
Other
Health
Defunct
Transportation
Subway stations
Streets
Other
Related topics
Retrieved from "https://en.wikipedia.org/w/index.php?title=72nd_Street_station_(Second_Avenue_Subway)&oldid=1334209486"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp