Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

145th Street station (IRT Broadway–Seventh Avenue Line)

Coordinates:40°49′34″N73°57′00″W / 40.826°N 73.95°W /40.826; -73.95
From Wikipedia, the free encyclopedia
New York City Subway station in Manhattan
For other uses, see145th Street.
Not to be confused with145th Street station (IRT Lenox Avenue Line) or145th Street station (IND Eighth Avenue Line).

New York City Subway station in Manhattan, New York
 145 Street
 "1" train
Southbound platform with 1 train leaving station
Station statistics
AddressWest 145th Street & Broadway
New York, New York
BoroughManhattan
LocaleHamilton Heights
Coordinates40°49′34″N73°57′00″W / 40.826°N 73.95°W /40.826; -73.95
DivisionA (IRT)[1]
LineIRT Broadway–Seventh Avenue Line
Services  1 all times (all times)
TransitBus transportNYCT Bus:M4,M5,Bx19,Bus transportColumbia TransportationIntercampus Green Line, Intercampus Blue Line, Intercampus Red Line
StructureUnderground
Platforms2side platforms
Tracks3 (2 in regular service)
Other information
OpenedOctober 27, 1904 (121 years ago) (1904-10-27)[2]
Traffic
20242,114,398[3]Increase 0.7%
Rank158 out of 423[3]
Services
Preceding stationNew York City SubwayNew York City SubwayFollowing station
157th Street
Local
137th Street–City College
Non-revenue services and lines
Preceding stationNew York City SubwayNew York City SubwayFollowing station
 
no service96th Street
express
Location
145th Street station (IRT Broadway–Seventh Avenue Line) is located in New York City Subway
145th Street station (IRT Broadway–Seventh Avenue Line)
Show map of New York City Subway
145th Street station (IRT Broadway–Seventh Avenue Line) is located in New York City
145th Street station (IRT Broadway–Seventh Avenue Line)
Show map of New York City
145th Street station (IRT Broadway–Seventh Avenue Line) is located in New York
145th Street station (IRT Broadway–Seventh Avenue Line)
Show map of New York
Track layout

145th Street
137th Street Yard
137th Street–City College
Street map

Map

Station service legend
SymbolDescription
Stops all timesStops all times

The145th Street station is a localstation on theIRT Broadway–Seventh Avenue Line of theNew York City Subway. Located at the intersection ofBroadway and145th Street inHamilton Heights neighborhood ofManhattan, it is served by the1 trains at all times.

The 145th Street station was constructed for theInterborough Rapid Transit Company (IRT) as part of thecity's first subway line, which was approved in 1900. Construction of the line segment that includes 145th Street began on May 14 of the same year. The station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway. The station's platforms were lengthened in 1948.

The 145th Street station contains twoside platforms and three tracks; the center track is not used in regular service. The station was built with tile and mosaic decorations. The platforms contain exits to 145th Street and Broadway and are not connected to each other withinfare control.

History

[edit]

Construction and opening

[edit]

Planning for asubway line inNew York City dates to 1864.[4]: 21  However, development of what would become thecity's first subway line did not start until 1894, when theNew York State Legislature passed the Rapid Transit Act.[4]: 139–140  The subway plans were drawn up by a team of engineers led byWilliam Barclay Parsons, the Rapid Transit Commission's chief engineer. It called for a subway line fromNew York City Hall inlower Manhattan to theUpper West Side, where two branches would lead north intothe Bronx.[5]: 3  A plan was formally adopted in 1897,[4]: 148  and all legal conflicts concerning the route alignment were resolved near the end of 1899.[4]: 161 

The Rapid Transit Construction Company, organized byJohn B. McDonald and funded byAugust Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[6] under which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[4]: 165  In 1901, the firm ofHeins & LaFarge was hired to design the underground stations.[5]: 4  Belmont incorporated theInterborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[4]: 182 

The 145th Street station was constructed as part of the IRT's West Side Line (now theBroadway–Seventh Avenue Line) from 133rd Street to a point 100 feet (30 m) north of 182nd Street. Work on this section was conducted by L. B. McCabe & Brother, who started building the tunnel segment on May 14, 1900.[6] The section of the West Side Line around this station was originally planned as a two-track line, but in early 1901, was changed to a three-track structure to permit train storage in the center track.[7]: 93 [8]: 189–190  A third track was added directly north of96th Street, immediately east of the originally planned two tracks.[9]: 14  By late 1903, the subway was nearly complete, but theIRT Powerhouse and the system'selectrical substations were still under construction, delaying the system's opening.[4]: 186 [10] As late as October 26, 1904, the day before the subway was scheduled to open, the walls and ceilings were incomplete.[11]

The 145th Street station opened on October 27, 1904, as the northernterminal station of the original 28-station New York City Subway line toCity Hall.[2][4]: 186  The line was subsequently extended one stop to157th Street in December 1904,[12]: 191  and ultimately was extended to242nd Street in the Bronx in 1908.[13]: 191 [14]

Service changes and station renovations

[edit]

After the first subway line was completed in 1908,[15] the station was served by West Side local and express trains. Express trains began atSouth Ferry in Manhattan orAtlantic Avenue in Brooklyn, and ended at 242nd Street in the Bronx. Local trains ran from City Hall to 242nd Street during rush hours, continuing south from City Hall to South Ferry at other times.[16] In 1918, the Broadway–Seventh Avenue Line opened south ofTimes Square–42nd Street, and the original line was divided into an H-shaped system. The original subway north of Times Square thus became part of the Broadway–Seventh Avenue Line. Local trains were sent toSouth Ferry, while express trains used the newClark Street Tunnel to Brooklyn.[17]

To address overcrowding, in 1909, theNew York Public Service Commission proposed lengthening the platforms at stations along the original IRT subway.[18]: 168  As part of a modification to the IRT's construction contracts made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $50.6 million in 2024) spent on platform lengthening, $500,000 (equivalent to $16.9 million in 2024) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[19]: 15  The northbound platform at the 145th Street station was extended 150 feet (46 m) to the south,[19]: 112–113  while the southbound platform was not lengthened.[19]: 106  The work involved reconstructing the interlocking between the center and northbound tracks.[19]: 112–113  Six-car local trains began operating in October 1910,[18]: 168  and ten-car express trains began running on the West Side Line on January 24, 1911.[18]: 168 [20] Subsequently, the station could accommodate six-car local trains, but ten-car trains could not open some of their doors.[21]

The city government took over the IRT's operations on June 12, 1940.[22][23] Platforms at IRT Broadway–Seventh Avenue Line stations between103rd Street and238th Street, including those at 145th Street, were lengthened to 514 feet (157 m) between 1946 and 1948, allowing full ten-car express trains to stop at these stations.[21] A contract for the platform extensions at 145th Street and eight other stations on the line was awarded to Spencer, White & Prentis Inc. in October 1946,[24] with an estimated cost of $3.891 million.[25] The platform extensions at these stations were opened in stages. On April 6, 1948, the platform extension at 145th Street opened.[21][26] Simultaneously, the IRT routes were given numbered designations with the introduction of"R-type" rolling stock, which containedrollsigns with numbered designations for each service.[27] The route to 242nd Street became known as the1.[28] In 1959, all 1 trains became local.[29]

In April 1988,[30] theNew York City Transit Authority (NYCTA) unveiled plans to speed up service on the Broadway–Seventh Avenue Line through the implementation of askip-stop service: the9 train.[31] When skip-stop service began on August 21, 1989, skip-stop service was implemented during rush hours and middays. 145th Street was the southernmost local stop that was served by the 9 during rush hours and middays and the 1 at other times.[32][33][34] On September 4, 1994, midday skip-stop service was discontinued.[35] Skip-stop service ended on May 27, 2005, as a result of a decrease in the number of riders who benefited.[36]

Station layout

[edit]
GroundStreet levelExit/entrance
Platform levelSide platform
Northbound local"1" train towardVan Cortlandt Park–242nd Street(157th Street)
Peak-direction express No regular service
Southbound local"1" train towardSouth Ferry(137th Street–City College)
Side platform
Mosaic name tablet
Original station name cartouche with frieze

This station was part of the original subway, and has twoside platforms and three tracks, the center one being an unused express track.[37] The station is served by the1 at all times[38] and is between157th Street to the north and137th Street to the south.[39] The platforms were originally 350 feet (110 m) long, like at other stations north of96th Street,[5]: 4 [40]: 8  but as a result of the 1948 platform extension, became 520 feet (160 m) long.[21] The platform extensions are at the southern ends of the uptown platform and the northern end of the downtown platform, making them slightly offset.[40]: 40  Fixed platform barriers, which are intended to prevent commuters falling to the tracks, are positioned near the platform edges.[41][42]

Design

[edit]

As with other stations built as part of the original IRT, the station was constructed using acut-and-cover method.[43]: 237  The tunnel is covered by a U-shaped trough that contains utility pipes and wires. The bottom of this trough contains afoundation ofconcrete no less than 4 inches (100 mm) thick.[40]: 9  Each platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The original platforms contain circular, cast-ironDoric-style columns spaced every 15 feet (4.6 m), while the platform extensions containI-beam columns. Additional columns between the tracks, spaced every 5 feet (1.5 m), support thejack-arched concrete station roofs.[5]: 4 [40]: 9  There is a 1-inch (25 mm) gap between the trough wall and the platform walls, which are made of 4-inch (100 mm)-thick brick covered over by a tiled finish.[40]: 9 

The decorative scheme consists of blue tile tablets; blue tile bands; a white terracotta cornice; and light blue terracotta plaques.[40]: 40  The mosaic tiles at all original IRT stations were manufactured by the American Encaustic Tile Company, which subcontracted the installations at each station.[40]: 31  The decorative work was performed by tile contractor Manhattan Glass Tile Company and terracotta contractor Atlantic Terra Cotta Company.[40]: 40  The platforms contain their original trim line of green with gray borders. "145" in white lettering on a dark border are tiled onto the trim. The station's other name tablets show "145TH ST." in a multi-color mosaic. The directional signs read also read "145TH ST." in white lettering on a black border.

Track layout

[edit]
Street stair

The northbound local track merges with the center track north of the station and the line continues north as two tracks. The switch from the southbound track to the center track is south of the station.[37]

Just south of the station lies the underground137th Street Yard, which is visible from passing trains. The track layout allows northbound trains to bypass this station by switching to the center express track in the 137th Street Yard.[37]

Exits

[edit]

Both platforms have same-levelfare control containing a bank ofturnstiles, token booth, and staircases to the street. The northbound platform has two staircases (one to each eastern corner of Broadway and 145th Street) and the southbound platform has a single staircase to the northwestern corner. There are no crossovers or crossunders to allow transfers between directions.[44]

References

[edit]
  1. ^"Glossary".Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS)(PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived fromthe original(PDF) on February 26, 2021. RetrievedJanuary 1, 2021.
  2. ^ab"Our Subway Open: 150,000 Try It; Mayor McClellan Runs the First Official Train".The New York Times. October 28, 1904. p. 1.ISSN 0362-4331.Archived from the original on November 12, 2020. RetrievedApril 21, 2020.
  3. ^ab"Annual Subway Ridership (2018–2023)".Metropolitan Transportation Authority. 2023. RetrievedApril 20, 2024.
  4. ^abcdefghWalker, James Blaine (1918).Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. RetrievedNovember 6, 2016.
  5. ^abcd"Interborough Rapid Transit System, Underground Interior"(PDF).New York City Landmarks Preservation Commission. October 23, 1979.Archived(PDF) from the original on September 21, 2020. RetrievedNovember 19, 2019.
  6. ^abReport of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
  7. ^Report of the Board of Rapid Transit Railroad Commissioners For And In The City of New York Up to December 31, 1901. Board of Rapid Transit Railroad Commissioners. 1902.Archived from the original on May 2, 2022. RetrievedDecember 23, 2020.
  8. ^Report of the Public Service Commission For The First District of the State of New York For The Year Ending December 31, 1909. Albany: Public Service Commission. 1910.Archived from the original on April 22, 2022. RetrievedDecember 23, 2020.
  9. ^"New York City's Subway Turns 100"(PDF).The Bulletin.47 (10). Electric Railroaders' Association. October 2004. Archived fromthe original(PDF) on April 3, 2018. RetrievedApril 2, 2018.
  10. ^"First of Subway Tests; West Side Experimental Trains to be Run by Jan. 1 Broadway Tunnel Tracks Laid, Except on Three Little Sections, to 104th Street -- Power House Delays".The New York Times. November 14, 1903.ISSN 0362-4331.Archived from the original on May 5, 2022. RetrievedMay 10, 2022.
  11. ^"Clamor for Tickets for Subway Opening; Distribution Plan Criticised by Engineers and Many Others".The New York Times. October 26, 1904.ISSN 0362-4331. RetrievedMay 25, 2023.
  12. ^Report of the Public Service Commission For The First District of the State of New York For The Year Ending December 31, 1909. Albany: Public Service Commission. 1910.Archived from the original on April 22, 2022. RetrievedDecember 23, 2020.
  13. ^Report of the Public Service Commission For The First District of the State of New York For The Year Ending December 31, 1909. Albany: Public Service Commission. 1910.Archived from the original on April 22, 2022. RetrievedDecember 23, 2020.
  14. ^"Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street for a Nickel Is Possible Now".The New York Times. August 2, 1908. p. 10.Archived from the original on December 23, 2021. RetrievedNovember 6, 2016.
  15. ^"Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street for a Nickel Is Possible Now".The New York Times. August 2, 1908. p. 10.Archived from the original on December 23, 2021. RetrievedNovember 6, 2016.
  16. ^Herries, William (1916).Brooklyn Daily Eagle Almanac. Brooklyn Daily Eagle. p. 119.Archived from the original on May 11, 2021. RetrievedDecember 23, 2020.
  17. ^"Open New Subway Lines to Traffic; Called a Triumph"(PDF).The New York Times. August 2, 1918. p. 1.ISSN 0362-4331.Archived(PDF) from the original on February 21, 2021. RetrievedOctober 4, 2011.
  18. ^abcHood, Clifton (1978)."The Impact of the IRT in New York City"(PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208)Public Domain This article incorporates text from this source, which is in thepublic domain..Archived(PDF) from the original on January 17, 2021. RetrievedDecember 20, 2020.
  19. ^abcdReport of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911.Archived from the original on January 20, 2021. RetrievedJanuary 7, 2021.
  20. ^"Ten-car Trains in Subway to-day; New Service Begins on Lenox Av. Line and Will Be Extended to Broadway To-morrow".The New York Times. January 23, 1911.ISSN 0362-4331.Archived from the original on April 5, 2018. RetrievedApril 5, 2018.
  21. ^abcdReport for the three and one-half years ending June 30, 1949. New York City Board of Transportation. 1949.hdl:2027/mdp.39015023094926.
  22. ^"City Transit Unity Is Now a Reality; Title to I.R.T. Lines Passes to Municipality, Ending 19-Year Campaign".The New York Times. June 13, 1940.ISSN 0362-4331.Archived from the original on January 7, 2022. RetrievedMay 14, 2022.
  23. ^"Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration".New York Herald Tribune. June 13, 1940. p. 25.ProQuest 1248134780.
  24. ^Crowell, Paul (October 11, 1946)."Improvement Costs Voted for Subway; Board of Estimate Appropriates $31,291,000 for New Cars and Station Lengthening"(PDF).The New York Times. p. 24.ISSN 0362-4331.Archived from the original on May 21, 2022. RetrievedJuly 28, 2021.
  25. ^"City Approves $35,153,000 Subway Outlay: Board of Estimate Awards Contract for 400 Cars and 10 Station Projects".New York Herald Tribune. October 11, 1946. p. 40.ISSN 1941-0646.ProQuest 1287183692.
  26. ^"More Long Platforms – Five Subway Stations on IRT to Accommodate 10-Car Trains"(PDF).The New York Times. July 10, 1948. p. 8.ISSN 0362-4331.Archived from the original on May 24, 2022. RetrievedMarch 27, 2016.
  27. ^Brown, Nicole (May 17, 2019)."How did the MTA subway lines get their letter or number? NYCurious".amNewYork.Archived from the original on March 2, 2021. RetrievedJanuary 27, 2021.
  28. ^Friedlander, Alex; Lonto, Arthur; Raudenbush, Henry (April 1960)."A Summary of Services on the IRT Division, NYCTA"(PDF).New York Division Bulletin.3 (1). Electric Railroaders' Association: 2. Archived fromthe original(PDF) on September 14, 2020. RetrievedJanuary 27, 2021.
  29. ^"Wagner Praises Modernized IRT — Mayor and Transit Authority Are Hailed as West Side Changes Take Effect".The New York Times. February 7, 1959. p. 21.Archived from the original on January 1, 2018. RetrievedNovember 6, 2016.
  30. ^Brozan, Nadine (June 4, 1989)."'Skip-Stop' Subway Plan Annoys No. 1 Riders".The New York Times.ISSN 0362-4331.Archived from the original on August 10, 2016. RetrievedJune 15, 2016.
  31. ^Moore, Keith (June 10, 1988)."TA's skip-stop plan hit".New York Daily News.Archived from the original on November 8, 2018. RetrievedNovember 8, 2018.
  32. ^"#1 Riders: Your Service is Changing".New York Daily News. August 20, 1989.Archived from the original on November 8, 2018. RetrievedNovember 8, 2018.
  33. ^"Announcing 1 and 9 Skip-Stop Service on the Broadway-Seventh Avenue Line"(PDF). New York City Transit Authority. August 1989. Archived fromthe original(PDF) on June 26, 2020. RetrievedAugust 1, 2009.
  34. ^Lorch, Donatella (August 22, 1989)."New Service For Subways On West Side".The New York Times.ISSN 0362-4331.Archived from the original on August 10, 2016. RetrievedJune 15, 2016.
  35. ^Chan, Sewell (January 12, 2005)."MTA Proposes Dropping No. 9 Train".The New York Times.Archived from the original on November 28, 2007. RetrievedApril 18, 2010.
  36. ^Chan, Sewell (May 25, 2005)."On Its Last Wheels, No. 9 Line Is Vanishing on Signs".The New York Times.ISSN 0362-4331.Archived from the original on March 17, 2015. RetrievedAugust 29, 2016.
  37. ^abcDougherty, Peter (2006) [2002].Tracks of the New York City Subway 2006 (3rd ed.). Dougherty.OCLC 49777633 – viaGoogle Books.
  38. ^"1 Subway Timetable, Effective June 8, 2025".Metropolitan Transportation Authority. RetrievedNovember 10, 2025.
  39. ^"Subway Map"(PDF).Metropolitan Transportation Authority. April 2025. RetrievedApril 2, 2025.
  40. ^abcdefghFramberger, David J. (1978)."Architectural Designs for New York's First Subway"(PDF). Historic American Engineering Record. pp. 1–46 (PDF pp. 367–412)Public Domain This article incorporates text from this source, which is in thepublic domain..Archived(PDF) from the original on January 17, 2021. RetrievedDecember 20, 2020.
  41. ^Wassef, Mira (July 18, 2025)."Platform barriers installed at 56 subway stations in NYC".PIX11. RetrievedJuly 21, 2025.
  42. ^Russo-Lennon, Barbara (July 20, 2025)."These are the NYC subway stations that now have protective platform barriers".amNewYork. RetrievedJuly 21, 2025.
  43. ^Scott, Charles (1978)."Design and Construction of the IRT: Civil Engineering"(PDF). Historic American Engineering Record. pp. 208–282 (PDF pp. 209–283)Public Domain This article incorporates text from this source, which is in thepublic domain..Archived(PDF) from the original on January 17, 2021. RetrievedDecember 20, 2020.
  44. ^"MTA Neighborhood Maps: Harlem / Hamilton Heights"(PDF).Metropolitan Transportation Authority. 2018. RetrievedOctober 1, 2018.

External links

[edit]
Wikimedia Commons has media related to145th Street (IRT Broadway – Seventh Avenue Line).
"1" trainBroadway–
 Seventh Avenue Local
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Note: Service variations, station closures, and reroutes are not reflected here.
    Stations with asterisks have no regular peak, reverse peak, or midday service on that route. See linked articles for more information.
Broadway–
Seventh Ave. Line

"1" train"2" train"3" train
"1" train South Ferry branch
"2" train"3" train Brooklyn branch
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Stations and line segments initalics are closed, demolished, or planned (temporary closures are marked with asterisks). Track connections to other lines' terminals are displayed in brackets.Struck through passenger track connections are closed or unused in regular service.
Buildings (Houston Street –Times Square)
Buildings (Times Square –Columbus Circle)
Buildings (Columbus Circle –The Bronx)
Parks and plazas
Former
Retrieved from "https://en.wikipedia.org/w/index.php?title=145th_Street_station_(IRT_Broadway–Seventh_Avenue_Line)&oldid=1322575155"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp