Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Port line (Mumbai Suburban Railway)

From Wikipedia, the free encyclopedia
Transit link in Maharashtra

Port line
Overview
OwnerCIDCO andIndian Railways
LocaleNavi Mumbai,Maharashtra
Termini
Stations11
Service
TypeSuburban rail
SystemMumbai Suburban Railway
Operator(s)Central Railway (CR)
Rolling stockBHEL, Siemens
History
Opened11 November 2018; 7 years ago (2018-11-11)
Technical
Line length26.7 km (16.6 mi)
CharacterAt Grade
Track gauge5 ft 6 in (1,676 mm)broad gauge
ElectrificationYes
Route map

Nerul
Seawoods-Darave-Karave
CBD Belapur
Targhar
Bamandongri
Kharkopar
Phase 1
Phase 2
Gavan
Shematikhar
Nhava Sheva
Dronagiri
Uran

Port line of theMumbai Suburban Railway is a railway line serving fromCBD Belapur andNerul inNavi Mumbai toUran in SouthNavi Mumbai ofMaharashtra, which is attached to theHarbour line. It was inaugurated on 11 November 2018 and daily services started on 12 November 2018.[1]

This railway line will help to accelerate the growth of Navi Mumbai, Jawaharlal Nehru Port and the Newly developed areas of Navi Mumbai and also will cater to the passenger traffic demands generated byJawaharlal Nehru Port, port-based industries,ONGC, the Defence establishment and other residential, industrial, and warehousing complexes inUran.

Technical specifications

[edit]

The total length of the corridor is 27 km (17 mi) and consists of ten stations; four major bridges; five roads over bridges, 15 roads under bridges, one track under bridge.[2] The 270 m (890 ft) platforms for two Broad gauge (BG) tracks to cater 12-carelectric multiple unit rakes with double discharge. The railway track structure shall comprise 60 kg/m (120 lb/yd) I-class rails laid on monoblock prestressed concrete sleepers to 16,660/km (26,810/mi) sleeper density. The bridges will be built to the ModifiedBroad gauge (MBG) standard of loading. Stone ballast 65 mm (2+1/2 in) gauge with ballast cushion of 300 mm (12 in) below the underside of sleepers will be provided and also provisions are made for one branch of the railway line to go toCBD Belapur. Currently, 4 EMU rakes ply on this line.

This railway line project is divided into two phases :

  • Phase I starts from Nerul and CBD Belapur to Kharkopar with stations are Seawoods-Darave-Karave, Bamandongri and Kharkopar.
  • Phase II starts from Kharkopar to Uran with stations are Shematikhar, Nhava Sheva, Dronagiri and Uran.
  • In Phase III, Targhar and Gavan stations will be started.

Status

[edit]
  • In Phase I, Bamandongri and Kharkopar are fully operational and Targhar railway station was still under construction.[3]
  • In Phase II, the Construction of all stations lying between Kharkopar and Uran were completed except Gavan railway station and flagged of by PMNarendra Modi on 12 January 2024.[4]
  • In Phase III, Targhar and Gavan stations were started fully operational from 15 December 2025.[5]

History

[edit]

TheCity and Industrial Development Corporation (CIDCO) was appointed as a New Town Development Authority in 1970. The government acquired land from 95 villages and handed it over to CIDCO for the development of towns. To decongest the mother city, Mumbai, CIDCO developed 14 nodes inNavi Mumbai. The development ofNavi Mumbai International Airport and six railway corridors in Navi Mumbai were meant to increase connectivity between the towns, nodes and mega establishments. The major features of the rail corridor are direct access from residential areas to the railway stations by foot, convenient interchange facility from one corridor to another, double discharge platforms at every station, easy-to-follow routes and comfortable and pleasant journeys from the key features of the commuter railway system in Navi Mumbai.

For that purpose, The railway Project between CBD Belapur and Nerul-Seawoods-Uran was approved byMinistry of Railways and the CIDCO Board. The work on the project began in July 1997. However, due to various unforeseen reasons, the work was delayed and hence stalled, until recently when the project was revived after the tripartite agreement between Railways,CIDCO andGovt. of Maharashtra was executed on 29 July 2011.[6][7][8]

The original estimated cost for the project was495 crore (equivalent to25 billion or US$300 million in 2023) in 1997, which escalated to1,782 crore.[9] The cost is shared by CIDCO and the Indian Railways, 67:33.[10]

Construction of Phase I on this route began in the first week of March 2017. After completion of Phase I, it was commissioned by CRS on 1 November 2018[11] and after, was inaugurated on 11 November 2018 through video conferencing by Railway MinisterPiyush Goyal and Chief Minister of MaharashtraDevendra Fadnavis.[12] More than 3,000 tickets were sold, with earnings of90,000 (US$1,100) during inauguration day of Phase I.[13]

Stations

[edit]
Port line
#Station NameStation
Code
Connections
EnglishMarathi
1NerulनेरूळNU/NEUHarbour andTrans-Harbour
2Seawoods-Darave-Karaveसीवूड्स-दारावे-करावेSWDKHarbour andTrans-Harbour
3CBD Belapurसी.बी.डी. बेलापूरBR/BEPRHarbour,Trans-Harbour andNavi Mumbai Metro
4TargharतरघरTRGRNavi Mumbai International Airport
5BamandongriबामणडोंगरीBMDRnone
6KharkoparखारकोपरKR/KARPnone
7Gavanगव्हाणGAVNnone
8ShematikharशेमटीखारSEMKnone
9Nhava Shevaन्हावा शेवाNESAnone
10Dronagiriद्रोणागिरीDRGInone
11UranउरणU/URANnone
† - when travelling from/to Nerul‡ - when travelling from/to CBD Belapur

Services

[edit]
Up services towards Nerul / CBD Belapur
Train No.DepartureOriginArrivalDestination
997025:30Uran6:03C.B.D. Belapur
996026:10Uran6:44Nerul
997046:40Uran7:13C.B.D. Belapur
996047:15Uran7:49Nerul
997067:45Uran8:18C.B.D. Belapur
996068:15Uran8:49Nerul
997088:45Uran9:18C.B.D. Belapur
996089:15Uran9:49Nerul
997109:45Uran10:18C.B.D. Belapur
9961010:15Uran10:49Nerul
9971211:15Uran11:48C.B.D. Belapur
9961212:15Uran12:49Nerul
9971413:15Uran13:48C.B.D. Belapur
9961414:15Uran14:49Nerul
9971615:15Uran15:48C.B.D. Belapur
9961616:15Uran16:49Nerul
9971817:15Uran17:48C.B.D. Belapur
9961818:00Uran18:34Nerul
9972018:35Uran19:08C.B.D. Belapur
9962019:05Uran19:39Nerul
9972219:35Uran20:08C.B.D. Belapur
9962220:05Uran20:39Nerul
9972420:50Uran21:23C.B.D. Belapur
9962421:35Uran22:09Nerul
9972622:30Uran23:03C.B.D. Belapur
Down services towards Uran
Train No.DepartureOriginArrivalDestination
997015:30C.B.D. Belapur6:03Uran
996016:15Nerul6:49Uran
997036:45C.B.D. Belapur7:18Uran
996037:15Nerul7:49Uran
997057:45C.B.D. Belapur8:18Uran
996058:15Nerul8:49Uran
997078:45C.B.D. Belapur9:18Uran
996079:15Nerul9:49Uran
997099:45C.B.D. Belapur10:18Uran
9960910:45Nerul11:19Uran
9971111:30C.B.D. Belapur12:03Uran
9971313:00C.B.D. Belapur13:33Uran
9961113:45Nerul14:19Uran
9971514:45C.B.D. Belapur15:18Uran
9961315:45Nerul16:19Uran
9971717:00C.B.D. Belapur17:33Uran
9961517:30Nerul18:04Uran
9961718:00Nerul18:34Uran
9971918:30C.B.D. Belapur19:03Uran
9961919:00Nerul19:34Uran
9972119:30C.B.D. Belapur20:03Uran
9962120:00Nerul20:34Uran
9972320:45C.B.D. Belapur20:18Uran
9962321:30Nerul22:04Uran
9972522:30C.B.D. Belapur23:03Uran

See also

[edit]

References

[edit]
  1. ^"Mumbai: First Phase of Nerul-Seawoods-Uran rail line commissioned".The Times of India. 11 November 2018. Retrieved26 November 2020.
  2. ^"Railway Project".City and Industrial Development Corporation of Maharashtra Ltd. Archived fromthe original on 2 March 2016. Retrieved26 November 2020.
  3. ^"Seawoods-Uran railway line: CIDCO to skip construction of a station to meet deadline".Indian Express. 27 March 2017. Retrieved8 October 2020.
  4. ^"उरण-खालापूर मार्गाला पंतप्रधान मोदी दाखवणार हिरवा कंदील".News 18 Lokmat (in Marathi).
  5. ^"More trains along 2 new stations to be introduced for NMIA connectivity".Hindustan Times. 6 November 2025.
  6. ^"Railways' and CIDCO jointly to fast-track Seawoods-Uran Railway link".Rail News. Archived fromthe original on 10 January 2015. Retrieved26 November 2020.
  7. ^"Seawoods-Uran line: Dec deadline set".DNA India. 16 March 2017. Retrieved28 March 2017.
  8. ^"Mumbai: First phase of Neral-Uran line completed, train services may start by July 2017".Free Press Journal. Retrieved28 March 2017.
  9. ^"Phase 2 of Nerul-Uran corridor could be completed by 2018".Mid-day. 5 January 2015. Retrieved28 March 2017.
  10. ^"Uran rail link project faces green hurdle - Times of India".The Times of India. Retrieved28 March 2017.
  11. ^"Nerul-Uran line CRS inspection successful".The Hindu. 1 November 2018. Retrieved8 October 2018.
  12. ^"Indian Railways Inaugurates New Nerul-Belapur-Seawoods-Kharkopar rail link in Mumbai".Zee Business. Retrieved8 October 2020.
  13. ^"Seawoods-Uran line in Mumbai over 3000 tickets sold on Day 1".Indian Express. 13 November 2018. Retrieved8 October 2020.

External links

[edit]
Mumbai topics
History
Geography
Buildings
Transport
Roads
Economy
Education
and research
Universities
and colleges
Schools
Institutes for science
and learning
Civic
Culture
Railways in Western India
National network /
trunk lines
Branch lines /
sections
Suburban lines
Metro rail
Monorail
Defunct lines
revived / under revival
Defunct lines
Railway divisions
Railway companies
See also
Nerul/CBD Belapur-Uran line
Panvel-Karjat line
Retrieved from "https://en.wikipedia.org/w/index.php?title=Port_line_(Mumbai_Suburban_Railway)&oldid=1330300894"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp