Tokamak
CFETR
China Fusion Engineering Test Reactor
Device typeTokamak
LocationHefei,Anhui Province, China
Technical specifications
Major radius7.2 m
Minor radius2.2 m
Magnetic field6.5 T
Plasma current14 MA

TheChina Fusion Engineering Test Reactor (Chinese:中国聚变工程实验堆;pinyin:Zhōngguó Jùbiàn Gōngchéng Shíyànduī), orCFETR, is a proposedtokamakfusion reactor, which uses a magnetic field in order to confine plasma and generate energy.[1] As of 2015, tokamak devices are leading candidates for the construction of a viable and practical thermonuclear fusion reactor.[1] These reactors may be used to generatesustainable energy while ensuring a lower environmental impact and a smallercarbon footprint than fossil fuel-based power plants.[2][3]

The CFETR utilises and intends to build upon pre-existing nuclear fusion research from theInternational Thermonuclear Experimental Reactor (ITER) program in order to address the gaps between ITER and the next generation thermonuclear plant and successor reactor class to ITER, theDemonstration Power Plant (DEMO).[4]

As of 2019, three domestic fusion test reactors are in operation in China. These includeEAST in ASIPP atHefei,HL-2A(M) at the Southwestern Institute of Physics (SWIP) atChengdu and J-TEXT located atHuazhong University of Science and Technology inWuhan.[5] Additionally, as of 2021, in an effort to more accurately simulate a potentially functionally operational CFETR, the HL-2A at SWIP was upgraded to theHL-2M.[5] Construction for theHL-2M was completed in November 2019, and the device was commissioned on December 4, 2020.[3]

The conceptual design of the CFETR, completed in 2015, is largely based on the design of these three domestic fusion reactors.[5] Construction of the CFETR will likely begin in the 2020s, with expected completion by the 2030s.[5]

Aims and objectives

[edit]

The China Fusion Engineering Test Reactor (CFETR) will operate in two phases. In the first phase, the CFETR will be required to demonstrate steady state operation andtritium self-sufficiency with a tritium breeding ratio > 1.[4] Moreover, in Phase 1, the CFETR should demonstrate generation of fusion power up to 200MW.[4]

The second phase, theDEMO validation phase, requires the CFETR to generate power over 1 GW.[6] More generally, the CFETR will also serve as aresearch and development tool for the testing of various structural and functional materials to identify or develop a material with a highneutron flux resistance.[7]

Design

[edit]

As of 2019, design for the CFETR was ongoing in its engineering design phase, which was expected to be completed between 2020 and 2021. The first stage, between 2010 and 2015, is referred to as the concept design stage.[7] It was necessary to demonstrate the economic viability of the construction of a small-scale machine. Moreover, this stage provided a proof of concept for the construction of a cost-effective fusion reactor capable of generating power.[7]

The second phase of design, the engineering design phase, began in 2015, directed towards the design of a large-scale machine with the aim of achieving 1 GW power output perDEMO's validation requirement.[4] Since 2017, research moved towards simulating various operating scenarios, researching the nuance of various experimental designs of individual CFETR components, such as the full-sized vacuum vessel and tritium breeding technology.[4]

As of 2019, discoveries made since the conceptual and engineering phases of research were being consolidated, integrated and built upon.[7]

Challenges

[edit]
Schematic of fusion reaction: Deuterium and Tritium undergo fusion reaction to produce a single neutron helium and energy.

Location, resource and infrastructure

[edit]

The China Fusion Engineering Test Reactor is planned inHefei, Anhui province. Some critical issues are still yet to be resolved, this includes 19 key system problems such as vertical instability control with internal coils, impurity control, alpha particle transport, disruption avoidance and mitigation, type-I ELM control and avoidance, technologies for the large heating power, tritium breeding and handling.[8] Moreover, whilst the properties of materials needed for the construction of the CFETR are known, many of these materials have yet to be fabricated and research is still ongoing for the creation of required materials.[4]

Furthermore, self-sufficiency of the CFETR is one of the greatest challenges.Deuterium andtritium are the fuel sources for the CFETR, and whilst deuterium is naturally abundant, commercial tritium sources are scarce.[9] Whilst tritium can be produced under lab conditions usingheavy water reactors, accelerators andlight water reactors,[9] the present amount of tritium being produced internationally is insufficient for operatingfusion reactors.[9] As such, key challenges are creating an appropriate fuel cycle concept for tritium recycling and renewal as well as formulating novel methods to produce tritium in an economical and cost-effective manner.[9]

These challenges are multifaceted and complex, requiring interdisciplinary co-operation and research. As such, to tackle the 19 key system problems posed by the CFETR, individual teams have been formed to tackle each issue in isolation.[8] This initiative is spearheaded by the Comprehensive Research Facility for Fusion Technology (CRAFT) and their team of 300 scientists, engineers and researchers in China in an attempt to resolve these critical issues by offering practical, viable and cost-effective solutions.[8]

Economic viability

[edit]

Prior to the introduction ofrenewable energy sources such assolar andwind power, fusion was touted as the future ofclean and netzero carbon energy.[10] However, the introduction, greater widespread application, and utilisation of renewable energy has drastically altered the energy landscape. For instance, renewables are projected to supply 74% of the global energy by 2050.[11] Moreover, with renewable energy prices falling, the economic viability of fusion power has been brought to the forefront of the discourse of the future economics of energy.[10]

Levelized Cost of Energy (LCOE) for various sources of energy including Wind, Solar and Nuclear energy.[12]

Presently, economists suggestfusion power is unlikely to be as cheap asrenewable energy.[10] Fusion plants, much likefission plants, will have large start up andcapital costs as the cost of the materials, machinery and infrastructure required to construct these fusions plants is likely to be exorbitant. Moreover, the operation and maintenance of these highly specialised plants are likely to be costly as well.[10] While the operation and construction costs of the CFETR are not well known, an EU DEMO fusion concept is projected to have alevelized cost of energy (LCOE) of $121/MWh.[13]

Furthermore, economists suggest that fusion energy becomes $16.5/ MWh more costly for every $1 billion increase in the price of fusion technology.[10] This high LCOE is largely a result of high capital costs incurred in the construction of fusion plants.[10]

In contrast, the LCOE of renewables appears substantially lower. For instance, the LCOE of solar energy appears to be $40-$46/ MWh,onshore wind is estimated at $29-$56/ MWh, andoffshore wind is approximately $92/ MWh.[14] As such, these cost-effective options appear to be the more economically viable ones.[10]

However, this is not to suggest that fusion power may lack complete economic viability. Rather, fusion power will likely supply the energy gaps renewables are not able to fill.[10] Thus, fusion power will likely work in tandem with renewable energy sources rather than become the primary source of energy.[10] Still, in instances where renewable energy may not be readily available, fusion power could become the dominant source of energy and supply the base load of theelectrical grid within those specific geographical areas.[10]

Safety

[edit]

As of 2021, the following two safety goals have been proposed in the international community:

  • Ensuring fusion reactor safety protocols are as competitive and comprehensive as those of fission reactors[15]

These goals are determined using the principle ofacceptable risks and can be further broken down into subcategories including occupationalradiation exposure, routine release ofradioactive materials, accident response and minimization, andradioactive waste.[15]

Nuclear safety is regarded highly by theChinese government, though to date, no comprehensive nuclear fusion safety framework exists within China.[16] As of 2019, safety protocols followed in China are based on fission reactor technology; these are outlined inLaw of the People's Republic of China on Prevention andControl of Radioactive pollution (2003), Nuclear Safety Act (2017) andRegulations on Safe Operation of Research Reactors (HAF202).[17] While these are beneficial in outlining general nuclear safety considerations, these are not fusion reactor specific. Furthermore, unlike fission reactors, the CFETR does not have areactor core. Hence, these pieces of legislation need to be updated to accommodate the design and mechanisms of fusion reactors.[16]

Moreover, while it is widely accepted that fusion power will be safer than fission due to the plasma cooling mechanism of thetokamak style device which cools the reactor and halts reactions upon disturbances to the system, the reliance on this ideal and mechanism alone is not sufficient.[17] Rather, disturbance parameters need to be appropriately defined and identified to prevent potential release of radioactive materials upon system disturbances or failure.[15] Hence appropriate safety measures need to be carefully considered. Moreover, tritium is a limitedradioactive isotope. As such, the radioactive nature of tritium may prove hazardous in instances of hypothetical accidental release upon dual confinement system failure.[16] Thus, under such circumstances, areas surrounding the CFETR will have to be evacuated and it will be 32–54 years before families may be able to return to their original homes.[17] However, CFETR engineers are designing the current reactor according to a no-evacuation criterion.[17] As such, technical engineers are required to produce a design which safeguards against any catastrophic failure of the fusion reactor which would require evacuation.[17]

As of November 2020, theInternational Atomic Energy Agency (IAEA) has begun working with various nations to create fusion reactor safety standards for various fusion reactor designs.[18] Moreover, they have begun investigating appropriate dose regulations as well as how radioactive waste from fusion energy should be managed and appropriately disposed of.[18]

Waste products

[edit]

Neutron radiation damage in solid vessel walls is expected to be greater than that of fission reactors due to higher neutron energies.[19] Moreover, this damage in tandem with large volumes ofhelium andhydrogen produced within the vessel is likely to result in infrastructural fatigue, thereby potentially damaging the vessel as well as transforming the vessel into radioactive metal and therebyradioactive waste.[19] Moreover, scientists have posited that many non-structural components will becomehighly radioactive.[20]

Nevertheless, it is important to recognise that the radioactivity per kilogram of waste would be substantially lower for the fusion reactor compared to the fission reactor.[19] While the nature of thedeuterium–tritium fusion reaction is such that it will likely produce greater volumes of radioactive structural and non-structural waste,[19] this issue may be circumvented with the engineering of low-activation structure alloys in order to ensure that these discarded materials qualify aslow-level radioactive waste.[20] However, with the presently available technology, the more likely outcome is the engineering of intermediate-activation structural alloys.[20] This will result in the production of low- to intermediate-levelradioactive waste.

Nonetheless, it is important to note that the radioactivity of such wastes has a half-life of 12.3 years, and so will persist as radioactive for approximately <100 years, compared to fission radioactive waste, which remains highly radioactive for approximately 1000 years.[19] Moreover, engineers behind the CFETR intend to limit output of intermediate to low level radioactive waste by introducing tritiated waste management systems.[21] This has the two-fold effect of extracting tritium to be recycled back into the machine and reducing the radioactivity of the waste produced by the fusion reactor.[4]

Future

[edit]

On December 4, 2020, theHL-2M was heated to approximately 150 million degrees Celsius, ten times hotter than thesun's core.[22] The successful construction and operation of theHL-2M at SWIP has likely provided an impetus to transition the CFETR into construction phase from its present engineering design phase.[19]

With China actively shifting towards developing its renewable and sustainable energy sector, the construction of the CFETR is not question of whether it will happen but rather when.[19] According to the present fusion timeline, the CFETR is likely to begin its construction phase in the 2020s and an industrial prototype is likely to be completed by 2035, with wide-scale commercial application by 2050.[19] Moreover, by 2025 China is expected to achieve the capacity for 79 GW of nuclear power. To achieve this goal, the construction of nuclear facilities is heavily emphasized in China's 14th 5-year plan (2021-2025) as the country moves towardscarbon neutrality.[19]

See also

[edit]

References

[edit]
  1. ^abFreidberg, J. P.; Mangiarotti, F. J.; Minervini, J. (2015-07-01)."Designing a tokamak fusion reactor—How does plasma physics fit in?".Physics of Plasmas.22 (7): 070901.Bibcode:2015PhPl...22g0901F.doi:10.1063/1.4923266.hdl:1721.1/111207.ISSN 1070-664X.OSTI 1547016.S2CID 117712932.
  2. ^Doshi, Bharat; Reddy, D. Chenna (April 2017)."Safety and Environment aspects of Tokamak- type Fusion Power Reactor- An Overview".Journal of Physics: Conference Series.823 (1) 012044.Bibcode:2017JPhCS.823a2044D.doi:10.1088/1742-6596/823/1/012044.ISSN 1742-6596.
  3. ^abXin, Zheng (2021)."Artificial Sun' May Make Fusion a Reality Nuclear Power to Play Key Role in China's Clean Energy Plans".China Daily - Hong Kong Edition. Archived fromthe original on 2023-01-22. Retrieved2021-06-01.
  4. ^abcdefgWan, Yuanxi; Li, Jiangang; Liu, Yong; Wang, Xiaolin; Chan, Vincent; Chen, Changan; Duan, Xuru; Fu, Peng; Gao, Xiang; Feng, Kaiming; Liu, Songlin (2017-06-23). "Overview of the present progress and activities on the CFETR".Nuclear Fusion.57 (10): 102009.Bibcode:2017NucFu..57j2009W.doi:10.1088/1741-4326/aa686a.ISSN 0029-5515.S2CID 126138788.
  5. ^abcd"China's fusion roadmap - Nuclear Engineering International".www.neimagazine.com. 3 October 2019. Retrieved2021-06-01.
  6. ^Li, Jiangang; Wan, Yuanxi (2019-02-01). "Present State of Chinese Magnetic Fusion Development and Future Plans".Journal of Fusion Energy.38 (1):113–124.doi:10.1007/s10894-018-0165-2.ISSN 1572-9591.S2CID 254650020.
  7. ^abcdZhuang, G.; Li, G.Q.; Li, J.; Wan, Y.X.; Liu, Y.; Wang, X.L.; Song, Y.T.; Chan, V.; Yang, Q.W.; Wan, B.N.; Duan, X.R. (2019-06-05). "Progress of the CFETR design".Nuclear Fusion.59 (11): 112010.Bibcode:2019NucFu..59k2010Z.doi:10.1088/1741-4326/ab0e27.ISSN 0029-5515.S2CID 127585754.
  8. ^abcZhang Rui (December 24, 2020)."Hefei now home to major science and technology facilities- China.org.cn".www.china.org.cn. Retrieved2021-06-01.
  9. ^abcdNie, Baojie; Ran, Guangming; Zeng, Qin; Du, Hongfei; Li, Zaixin; Chen, Yanjing; Zhu, Zuolong; Zhao, Xueli; Ni, Muyi; Li, Fengchen (2019)."Insights into fuel start-up and self-sufficiency for fusion energy: The case of CFETR".Energy Science & Engineering.7 (2):457–468.Bibcode:2019EneSE...7..457N.doi:10.1002/ese3.291.ISSN 2050-0505.
  10. ^abcdefghijNicholas, T. E. G.; Davis, T. P.; Federici, F.; Leland, J. E.; Patel, B. S.; Vincent, C.; Ward, S. H. (February 2021). "Re-examining the Role of Nuclear Fusion in a Renewables-Based Energy Mix".Energy Policy.149 112043.arXiv:2101.05727.Bibcode:2021EnPol.14912043N.doi:10.1016/j.enpol.2020.112043.S2CID 230570595.
  11. ^"Global Energy Perspectives 2019".Energy Insights- Mckinsey.Archived from the original on 2019-04-18.
  12. ^"Lazard LCOE Levelized Cost Of Energy+"(PDF). Lazard. June 2024. p. 16.Archived(PDF) from the original on 28 August 2024.
  13. ^Entler, Slavomir; Horacek, Jan; Dlouhy, Tomas; Dostal, Vaclav (2018-06-01)."Approximation of the economy of fusion energy".Energy.152:489–497.Bibcode:2018Ene...152..489E.doi:10.1016/j.energy.2018.03.130.ISSN 0360-5442.
  14. ^"Levelized Cost of Energy and Levelized Cost of Storage 2019".Lazard.com. Archived fromthe original on 2023-02-19. Retrieved2021-06-01.
  15. ^abcdWang, Zhen; Chen, Zhibin; Chen, Chao; Ge, Daochuan; Perrault, Didier; Zucchetti, Massimo; Subbotin, Michail (2021-01-13)."Quantitative safety goals for fusion power plants: Rationales and suggestions".International Journal of Energy Research.45 (6):9694–9703.Bibcode:2021IJER...45.9694W.doi:10.1002/er.6399.ISSN 0363-907X.S2CID 234153700.
  16. ^abcShen, Xinyuan; Chen, Zhibin; Wang, Zhen; Wang, Haixia; Chen, Shanqi; Ge, Daochuan; Chen, Chao; Jiang, Jieqiong; Hu, Liqin; Yu, Jie; Wu, Yican (2019-08-23)."Safety regulatory framework for hydrogen fusion reactors in China".International Journal of Hydrogen Energy.44 (40):22704–22711.Bibcode:2019IJHE...4422704S.doi:10.1016/j.ijhydene.2019.03.070.ISSN 0360-3199.S2CID 132539839.
  17. ^abcdeNie, Baojie; Jiang, Man; Ni, Muyi; Li, Fengchen (2019-03-01)."Preliminary environmental radiation considerations for CFETR".Fusion Engineering and Design.140:16–22.Bibcode:2019FusED.140...16N.doi:10.1016/j.fusengdes.2019.01.119.ISSN 0920-3796.S2CID 127532912.
  18. ^ab"Safety in Fusion".www.iaea.org. 2021-05-28. Retrieved2021-06-01.
  19. ^abcdefghi"Fusion reactors: Not what they're cracked up to be".Bulletin of the Atomic Scientists. 2017-04-19. Retrieved2021-06-01.
  20. ^abcBailey, G. W.; Vilkhivskaya, O. V.; Gilbert, M. R. (January 2021)."Waste expectations of fusion steels under current waste repository criteria".Nuclear Fusion.61 (3): 036010.Bibcode:2021NucFu..61c6010B.doi:10.1088/1741-4326/abc933.ISSN 0029-5515.S2CID 228862229.
  21. ^Chen, Hongli; Pan, Lei; Lv, Zhongliang; Li, Wei; Zeng, Qin (2016-05-01)."Tritium fuel cycle modeling and tritium breeding analysis for CFETR".Fusion Engineering and Design.106:17–20.Bibcode:2016FusED.106...17C.doi:10.1016/j.fusengdes.2016.02.100.ISSN 0920-3796.
  22. ^"China turns on nuclear-powered 'artificial sun' (Update)".phys.org. Retrieved2021-06-01.
Operating power plants
Power plants under construction
Fujian
Xiapu
Guangdong
Lianjiang
Lufeng
Taipingling
Guangxi
Bailong
Jiangsu
Xuwei
Liaoning
Xudabao
Shandong
Zhaoyuan
Zheijiang
Jinqimen
San'ao
Planned power plants
Proposed power plants
Anhui
Jiyang
Wuhu
Chongqing
Fuling
Shizu
Fujian
Gulei
Xiapu
Guangdong
Haifeng
Hebaodao
Jieyang
Shaoguan
Guizhou
Tongren
Guangxi
Pingnan
Hebei
Cangzhou
Qiaofushan
Heilongjiang
Jiamusi
Henan
Nanyang
Xinyang
Hubei
Guangshui
Zhingxiang
Hunan
Changde
Xiaomoshan
Xiangtan
Jiangxi
Hengfeng
Yingtan
Ningdu
Yanjiashan
Jilin
Jingyu
Liaoning
Donggang
Hengren
Pulandian
Shanghai
Songjiang
Sichuan
Nanchong
Yibin
Zhejiang
Zhexi
Research, experimental
and prototype reactors
Commercial reactor designs
Organizations
Power plant operators
Construction companies
Government agencies
Mining
Other
Related categories
Fusion power, processes and devices
Core topics
Nuclear fusion
Processes,
methods
Confinement
type
Gravitational
Magnetic
Magneto-inertial
Inertial
Electrostatic
Other forms
Devices,
experiments
Magnetic
confinement
Tokamak
International
Americas
Asia,
Oceania
Europe
Stellarator
Americas
Asia,
Oceania
Europe
Levitated dipole
Pinch
RFP
Field-reversed
configuration
Colliding
Mirror
Magneto-inertial
Inertial
confinement
Laser
Americas
Asia
Europe
Non-laser
Retrieved from "https://en.wikipedia.org/w/index.php?title=China_Fusion_Engineering_Test_Reactor&oldid=1326128964"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp