Movatterモバイル変換


[0]ホーム

URL:


About:Kuril Flyover

An Entity of Type:infrastructure,from Named Graph:http://dbpedia.org,within Data Space:dbpedia.org

The Kuril Flyover is the third largest flyover in Bangladesh. Its foundation stone was laid on 2 May 2010. Finally the work started in March 2011. The flyover was opened on 4 August 2013.

PropertyValue
dbo:Infrastructure/length
  • 3.1
dbo:abstract
  • The Kuril Flyover is the third largest flyover in Bangladesh. Its foundation stone was laid on 2 May 2010. Finally the work started in March 2011. The flyover was opened on 4 August 2013. (en)
dbo:buildingEndDate
  • 4 August 2013
dbo:buildingStartDate
  • 2 May 2010
dbo:length
  • 3100.000000 (xsd:double)
dbo:locatedInArea
dbo:wikiPageID
  • 66066228 (xsd:integer)
dbo:wikiPageLength
  • 1412 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1090080792 (xsd:integer)
dbo:wikiPageWikiLink
dbp:begin
  • 2010-05-02 (xsd:date)
dbp:bridgeName
  • Kuril Flyover (en)
dbp:builder
  • Project Builders Limited, China Major Bridge Engineering Corporation (en)
dbp:complete
  • 2013-08-04 (xsd:date)
dbp:cost
  • 3060000000 (xsd:decimal)
dbp:length
  • 3.1
dbp:locale
dbp:officialName
  • Kuril Flyover (en)
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • The Kuril Flyover is the third largest flyover in Bangladesh. Its foundation stone was laid on 2 May 2010. Finally the work started in March 2011. The flyover was opened on 4 August 2013. (en)
rdfs:label
  • Kuril Flyover (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Kuril Flyover (en)
isdbo:wikiPageWikiLink of
isdbp:west of
isfoaf:primaryTopic of
Powered by OpenLink Virtuoso   This material is Open Knowledge    W3C Semantic Web Technology    This material is Open Knowledge   Valid XHTML + RDFa
This content was extracted fromWikipedia and is licensed under theCreative Commons Attribution-ShareAlike 3.0 Unported License

[8]ページ先頭

©2009-2025 Movatter.jp