dbo:abstract | - Handri-Neeva Sujala Sravanthi project is the longest water canal project in the region of Rayalaseema, Andhra Pradesh, India. The project was conceived to provide a reliable irrigation and drinking water supply for the region through drawing flood waters from the Srisailam reservoir. The first phase of the canal begins at Malyala and irrigates six lakh acres in four districts of Rayalaseema, while the second phase provides irrigation facilities and drinking water for Chittoor district. This canal links the Handri, Penna, Chitravathi, Papagni, Mandavya, Bahuda, Cheyyeru, Gargeya, Vedavati, Palar and several smaller rivers in the Rayalaseema region. The canal is located in the Kurnool, Ananthapur, Kadapa, and Chittoor districts. The canal feeds several reservoirs and water tanks in the region. More than 50 Tmcft of water is required to meet the region's drinking and irrigation water requirements. (en)
|