The Copper Mountain Solar Facility is a 802 megawatt (MWAC) solar photovoltaic power plant in Boulder City, Nevada, United States. The plant was developed by Sempra Generation. When the first unit of the facility entered service on December 1, 2010, it was the largest photovoltaic plant in the U.S. at 58 MW. With the opening of Copper Mountain V in March 2021, it again became the largest in the United States. It is co-located with the 64 MW Nevada Solar One, 150 MW Boulder Solar, and 300 MW Techren Solar projects in the Eldorado Valley, thus forming a more than 1 gigawatt (GW) solar generating complex. By comparison, generating capacity at the nearby Hoover Dam is about 2 GW.

thumbnail
PropertyValue
dbo:abstract
  • The Copper Mountain Solar Facility is a 802 megawatt (MWAC) solar photovoltaic power plant in Boulder City, Nevada, United States. The plant was developed by Sempra Generation. When the first unit of the facility entered service on December 1, 2010, it was the largest photovoltaic plant in the U.S. at 58 MW. With the opening of Copper Mountain V in March 2021, it again became the largest in the United States. It is co-located with the 64 MW Nevada Solar One, 150 MW Boulder Solar, and 300 MW Techren Solar projects in the Eldorado Valley, thus forming a more than 1 gigawatt (GW) solar generating complex. By comparison, generating capacity at the nearby Hoover Dam is about 2 GW. (en)
  • Copper Mountain Solar Facility — фотоэлектрическая станция общей мощностью 458 МВт. Расположена в округе Кларк, Невада, США. Изначально проектная мощность станции составляла 58 МВт. Строительство началось в январе 2010 года и было завершено в декабре того же года. Copper Mountain Solar Facility в 2011 году получила вознаграждение Excellence in Renewable Energy Awards в категории "Проект года". Стоимость проекта составила 141 миллион долларов США. В 2011 году было принято решение о расширении электростанции. Расширение предусматривает три очереди строительства. Строительство второй и третьей очереди было завершено в начале 2015 года. (ru)
dbo:buildingStartDate
  • January 2010
dbo:buildingStartYear
  • 2010-01-01 (xsd:gYear)
dbo:capacityFactor
  • 27.900000 (xsd:float)
dbo:country
dbo:location
dbo:openingYear
  • 2008-01-01 (xsd:gYear)
dbo:owner
dbo:status
  • O
dbo:thumbnail
dbo:wikiPageID
  • 29964018 (xsd:integer)
dbo:wikiPageLength
  • 20201 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1122115029 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • Dec 2008 - Mar 2021 (en)
dbp:constructionBegan
  • January 2010 (en)
dbp:country
  • United States (en)
dbp:imageCaption
  • Copper Mountain Solar 1 (en)
dbp:location
dbp:name
  • Copper Mountain Solar Facility (en)
dbp:owner
dbp:psAnnualGeneration
  • 1348 (xsd:integer)
dbp:psElectricalCapFac
  • 27.9
dbp:psElectricalCapacity
  • 802 (xsd:integer)
dbp:psUnitsOperational
  • 9000000 (xsd:integer)
dbp:solarType
  • PV (en)
dbp:status
  • O (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 35.78333333333333 -114.99166666666666
rdf:type
rdfs:comment
  • The Copper Mountain Solar Facility is a 802 megawatt (MWAC) solar photovoltaic power plant in Boulder City, Nevada, United States. The plant was developed by Sempra Generation. When the first unit of the facility entered service on December 1, 2010, it was the largest photovoltaic plant in the U.S. at 58 MW. With the opening of Copper Mountain V in March 2021, it again became the largest in the United States. It is co-located with the 64 MW Nevada Solar One, 150 MW Boulder Solar, and 300 MW Techren Solar projects in the Eldorado Valley, thus forming a more than 1 gigawatt (GW) solar generating complex. By comparison, generating capacity at the nearby Hoover Dam is about 2 GW. (en)
  • Copper Mountain Solar Facility — фотоэлектрическая станция общей мощностью 458 МВт. Расположена в округе Кларк, Невада, США. Изначально проектная мощность станции составляла 58 МВт. Строительство началось в январе 2010 года и было завершено в декабре того же года. Copper Mountain Solar Facility в 2011 году получила вознаграждение Excellence in Renewable Energy Awards в категории "Проект года". Стоимость проекта составила 141 миллион долларов США. (ru)
rdfs:label
  • Copper Mountain Solar Facility (en)
  • Copper Mountain Solar Facility (ru)
owl:sameAs
geo:geometry
  • POINT(-114.99166870117 35.783332824707)
geo:lat
  • 35.783333 (xsd:float)
geo:long
  • -114.991669 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Copper Mountain Solar Facility (en)
isdbo:wikiPageDisambiguates of
isdbo:wikiPageWikiLink of
isfoaf:primaryTopic of
Powered by OpenLink Virtuoso   This material is Open Knowledge    W3C Semantic Web Technology    This material is Open Knowledge   Valid XHTML + RDFa
This content was extracted fromWikipedia and is licensed under theCreative Commons Attribution-ShareAlike 3.0 Unported License

[8]ページ先頭

©2009-2025 Movatter.jp